1、Lessons Learned Entry: 1508Lesson Info:a71 Lesson Number: 1508a71 Lesson Date: 2003-07-01a71 Submitting Organization: MSFCa71 Submitted by: Lisa CarrSubject: Orbital Space Plane - Credibility in Cost & Schedule Estimating - Tools & Models Abstract: Credibility in cost and schedule estimating is key
2、in convincing stakeholders that a program can execute within resource constraints. Place emphasis on providing credible cost and schedule estimations to stakeholders. Description of Driving Event: The Orbital Space Plane (OSP) Program recognized credibility in cost and schedule estimating and placed
3、 great emphasis on developing credible cost tools and models that produce credible results.Lesson(s) Learned: Credibility in cost and schedule estimating is key in convincing stakeholders that a program can execute within resource constraints. OSP recognized this issue and placed great emphasis on d
4、eveloping credible cost tools and models that produce credible results. Significant lack of clarity exists in operations cost models for human space flight vehicles. Models were being developed and vetted but more work is required. “Smart buyer” technical tools and models require a comparable emphas
5、is. Our government evaluators must be able to independently validate contractors analyses, tools and models.Additionally:a. Human Space Flight Operations Cost Model. Obtaining adequate operations cost estimates was a struggle through-out the OSP program studies. The lack of a cost modeling tool for
6、human flight operations significantly increases the time and effort required to generate costing figures. In addition, it is difficult to provide consistent costing figures through multiple iterations/costing exercises.Provided by IHSNot for ResaleNo reproduction or networking permitted without lice
7、nse from IHS-,-,-b. Government Concept. The government concept role in the requirements analysis cycle (RAC) was clear, but its role in the design analysis cycle (DAC) was unclear.c. Design Participation. Teams of NASA human spaceflight system experts and integrated system analysts should have been
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS15082003LESSONSLEARNEDORBITALSPACEPLANECREDIBILITYINCOSTSCHEDULEESTIMATINGTOOLSMODELSPDF

链接地址:http://www.mydoc123.com/p-1019146.html