1、Lessons Learned Entry: 1491Lesson Info:a71 Lesson Number: 1491a71 Lesson Date: 2004-04-26a71 Submitting Organization: LARCa71 Submitted by: Richard J. GilbrechSubject: Thorough Risk Assessment in the Design Phase Abstract: In November of 2003, the NASA Engineering and Safety Center (NESC) performed
2、an Independent Technical Assessment of the Code Y CALIPSO satellite Proteus propulsion bus (ref. NESC Final Report NESC-RP-001, NASA Technical Memorandum number applied for). This is a joint mission with NASA GSFC, LaRC and the Centre National dEtudes Spatiales (CNES) scheduled to launch from Vanden
3、berg Air Force base in April 2005 on a Delta II rocket. Several personnel safety hazards related to the hydrazine-fueled Proteus propulsion bus could have been minimized or avoided in the design phase.Description of Driving Event: The GSFC/LaRC Integrated Program Management Council co-chair, William
4、 Townsend (Deputy Center Director at GSFC) requested the NASA Engineering and Safety Center to review three personnel hazards associated with the CALIPSO satellite Proteus propulsion bus: 1-hydrazine leakage from the five threaded A/N fluid fittings, 2-hydrazine leakage through the thrusters and 3-i
5、nadvertent firing of the thrusters. These personnel hazards exist only during the period when the system is filled and pressurized until launch (approximately 36 days). The pre-ship review of the instrument (supplied by Ball Aerospace and integrated into the spacecraft by Alcatel Space Industries) w
6、as the driving program milestone that precipitated this review and subsequent lesson learned. At the time of the independent assessment, the spacecraft had been through its critical design review and the Proteus bus was already fabricated. The choice of mechanical A/N fittings instead of welded join
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS14912004LESSONSLEARNEDTHOROUGHRISKASSESSMENTINTHEDESIGNPHASEPDF

链接地址:http://www.mydoc123.com/p-1019129.html