REG NASA-LLIS-1206-1999 Lessons Learned Status Report Systems for Complex Integrated Operations.pdf
《REG NASA-LLIS-1206-1999 Lessons Learned Status Report Systems for Complex Integrated Operations.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-1206-1999 Lessons Learned Status Report Systems for Complex Integrated Operations.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 1206Lesson Info:a71 Lesson Number: 1206a71 Lesson Date: 1999-04-01a71 Submitting Organization: JSCa71 Submitted by: Ralph F. Fritsche/ Ronald A. MontagueSubject: Status Report Systems for Complex Integrated Operations Description of Driving Event: The high Program visibility o
2、f Multi-Element Integration Test (MEIT) warrants the need for detailed daily status. Unfortunately, the process for obtaining and providing status proved disruptive to real-time Test Team operations at KSC. Several times during the day people from different organizations would come to the control ro
3、om in search of information for test status or forward planning assessments. This had a negative impact on control room discipline and seriously affected the ability of the Test Directors and Project Engineers to maintain focus on test implementation.Root cause: Lack of pre-established reporting pro
4、tocol and schedule for disseminating MEIT information to ISS Program Office. Lesson(s) Learned: Systematic status reporting processes are a must when multiple parties are involved in complex, real-time integrated operationsRecommendation(s): Daily status updates should be provided by designated Test
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS12061999LESSONSLEARNEDSTATUSREPORTSYSTEMSFORCOMPLEXINTEGRATEDOPERATIONSPDF

链接地址:http://www.mydoc123.com/p-1018845.html