1、Lessons Learned Entry: 0624Lesson Info:a71 Lesson Number: 0624a71 Lesson Date: 1999-06-03a71 Submitting Organization: JPLa71 Submitted by: J. Forgrave/C. Farguson/D. OberhettingerSubject: Design, Test, and Inspection of Semi-Rigid RF Cables (1997) Abstract: The Sea Winds test program demonstrated th
2、at semi-rigid coaxial RF cable failures are difficult to avoid. Semi-rigid RF cable failures often cannot be detected by visual examination. During inspections following vibration test of the Sea Winds SES, hairline cracks were missed several times. Testing of protoflight models (PFMs) may permit on
3、ly in-situ visual examination of components, while structural mass model (STM) tests typically allow cables to be removed from the unit for close examination. After a cable assembly passes environmental test, a second “identical” cable may fail due to minor differences in manufacture and installatio
4、n. Consider using flexible cable. Where semi-rigid cabling is preferred, the lesson recommends standardization of cable receiving inspection, assembly, and installation. It also suggests several cable installation and test measures.Description of Driving Event: The Scatterometer Electronics Subsyste
5、m (SES) for the Sea Winds spacecraft featured six semi-rigid coaxial radio frequency (RF) cables spanning two independent structures within the SES. After two cables failed during the initial SES vibration test, four additional cycles of redesign and test were required before the cables were judged
6、acceptable. Two of the five tests were performed on SES protoflight models (PFM) and three on structural mass models (STM). Each of the six cables required varying degrees of redesign, including changes to cable material, strain relief, mounting configuration, and bonding, that impacted the Sea Wind
7、s schedule.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-refer to D descriptionD The process of cable redesign and retest is complicated by lack of repeatability. Minor uncontrolled variations in cable manufacture, routing, and mounting; JPL “impro
8、vements“ in the cable configuration; and differences between the PFM and STM units, alter the dynamic characteristics of the test article. Furthermore, cracks in semi-rigid cables are very difficult to detect while they are installed. Cable failures may not be visually detected until the cables are
9、removed from a test model, but they cannot easily be removed for inspection without damaging the cables and invalidating the vibration test results. If a cable failure was not detected and the SES was launched with a cracked cable, thermal transients could widen that crack, and the resulting signal
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS06241999LESSONSLEARNEDDESIGNTESTANDINSPECTIONOFSEMIRIGIDRFCABLES1997PDF

链接地址:http://www.mydoc123.com/p-1018271.html