1、Lessons Learned Entry: 0362Lesson Info:a71 Lesson Number: 0362a71 Lesson Date: 1994-11-04a71 Submitting Organization: JPLa71 Submitted by: A.G. GussnerSubject: Magellan Radio Transmitter A Modulation Failure Abstract: Loss of Magellan telemetry data was traced to moisture contamination due to a subc
2、ontractors failure to use dry gas in the repackaging of an operational amplifier. Recommendations involve use of fault tree analysis, appropriate component screening and qualification, minimizing power cycling, and using dry gas.Description of Driving Event: After a star calibration during the Magel
3、lan third extended mission, the X Band telemetry and high rate data were missing from the down link (22 kHz and 960 kHz subcarriers were missing). A subsequent attempt to use the 360 kHz subcarrier also resulted in no significant subcarrier in the down link.The most likely failure is a HA 2520 opera
4、tional amplifier used as a summing amplifier in the telemetry signal conditioner (although a failure in the phase modulator circuitry is also a possible cause). It failed after 20,600 hours of flight operation and 2,600 power cycles (resulting in 10-15 degree thermal cycles). A prelaunch failure on
5、this component type indicated the possibility that during the repackaging process by the subcontractor of the HA 2520, moisture was trapped inside the electronic component. This moisture would combine with the phosphorus dopant in the glass passivation forming phosphoric acid that would enter throug
6、h pinholes in the passivation layer and attack the nickel-chromium resistors causing failure. The subsystem contractor did not use a dry gas during the repackaging process; instead air with a moisture content of greater than or equal to 5,000 PPM water was used. The prime contractor, with JPL concur
7、rence, felt that additional screening had been sufficient to identify any other faulty HA 2520 amplifiers.It was concluded that the in-flight failure may be related to stress induced by thermal cycles resulting Provided by IHSNot for ResaleNo reproduction or networking permitted without license from
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS03621994LESSONSLEARNEDMAGELLANRADIOTRANSMITTERAMODULATIONFAILUREPDF

链接地址:http://www.mydoc123.com/p-1018009.html