REG NASA-LLIS-0355--1994 Lessons Learned - Galileo Photopolarimeter Radiometer (PPR) Cover Damage During Assembly and Test.pdf
《REG NASA-LLIS-0355--1994 Lessons Learned - Galileo Photopolarimeter Radiometer (PPR) Cover Damage During Assembly and Test.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-0355--1994 Lessons Learned - Galileo Photopolarimeter Radiometer (PPR) Cover Damage During Assembly and Test.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 0355Lesson Info:a71 Lesson Number: 0355a71 Lesson Date: 1994-12-12a71 Submitting Organization: JPLa71 Submitted by: R.F. CollinsSubject: Galileo Photopolarimeter Radiometer (PPR) Cover Damage During Assembly and Test Abstract: The Galileo Photopolarimeter Radiometer subsystem
2、cover was damaged on three separate occasions during assembly and test operations. Design all external areas of spacecraft flight hardware with consideration for assembly and handling operations: avoid sharp or pointed corners. Conduct physical surveys to identify hardware that is susceptible to han
3、dling damage.Description of Driving Event: The Galileo Photopolarimeter Radiometer (PPR) subsystem cover was damaged on three separate occasions during assembly and test operations. The PPR cover is very delicate and has sharp corners that make it vulnerable to snagging.The damage occurred during th
4、ermal blanket operations which required access to areas behind the PPR location and was caused by a technicians protective clothing snagging on the sharp edges of the PPR cover. After the first incident, when damage was relatively minor and easily repaired, the workers were cautioned to avoid this p
5、roblem. In the second incident, damage was serious and required rework. A protective guard was then built to protect the cover. The third incident happened after this protective guard had been removed to permit further thermal blanket fitting activity. All of the incidents occurred even though the w
6、ork was being performed by well trained, experienced and highly qualified technicians under the watchful eye of QA personnel. After the third incident, the mechanical assembly procedures were revised to require a second technician (buddy system) to continuously monitor and provide a shielding arm or
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS03551994LESSONSLEARNEDGALILEOPHOTOPOLARIMETERRADIOMETERPPRCOVERDAMAGEDURINGASSEMBLYANDTESTPDF

链接地址:http://www.mydoc123.com/p-1018002.html