REG MSFC-HDBK-3173 REV B-2012 PROJECT MANAGEMENT AND SYSTEMS ENGINEERING HANDBOOK.pdf
《REG MSFC-HDBK-3173 REV B-2012 PROJECT MANAGEMENT AND SYSTEMS ENGINEERING HANDBOOK.pdf》由会员分享,可在线阅读,更多相关《REG MSFC-HDBK-3173 REV B-2012 PROJECT MANAGEMENT AND SYSTEMS ENGINEERING HANDBOOK.pdf(366页珍藏版)》请在麦多课文档分享上搜索。
1、CHECK THE MASTER LIST VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE at https:/repository.msfc.nasa.gov/docs/multiprogram/MSFC-HDBK-3173B National Aeronautics and MSFC-HDBK-3173 Space Administration Revision B EFFECTIVE DATE: October 16, 2012George C. Marshall Space Flight Center Marshall Space
2、Flight Center, Alabama 35812 EE11 MSFC TECHNICAL STANDARD PROJECT MANAGEMENT AND SYSTEMS ENGINEERING HANDBOOK Approved for Public Release; Distribution is Unlimited Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MSFC Technical Standard EE11 Title: P
3、roject Management and Systems Engineering Handbook Document No.: MSFC-HDBK-3173 Revision: B Effective Date: October 16, 2012 Page 2 of 366 CHECK THE MASTER LIST-VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE at https:/repository.msfc.nasa.gov/docs/multiprogram/MSFC-HDBK-3173B DOCUMENT HISTORY LO
4、G Status (Baseline/ Revision/ Canceled) Document Revision Effective Date Description Baseline 5/30/2001 Baseline Release Revision A 10/27/2003 Document has been edited and restructured. Section on Technology Development Projects has been added. Appendix D, Technical Performance Metrics, has been add
5、ed. Review comments incorporated. Revision B 10/12/2012 Revision B released; document authorized through MPDMS. Document has been edited and restructured. Section 4, Project Management and Systems Engineering has been broken into two separate sections. Section 3, Project Management has been updated
6、to reflect the current NASA Project Life-cycle and current MSFC practices. Section 3.1, Project Life-cycle, has been updated to comply with NPR 7120.5 and NPR 7120.8. Section 3.2, Project Organization, has been reduced in scope to include only those roles that are not specific to the current Center
7、organization structure. Section 3.3, Project Management Functions, has been reduced in scope to eliminate data that exists in other Center documentation. Section 3.4, Project Reviews, has been revised to reflect the current Technical Reviews required by NASA documentation and reduced in scope to eli
8、minate data that can be found in other Center documentation. Section 4, Systems Engineering, includes additional guidance on all 17 systems engineering processes. Appendices related to Requirements Development, and Technical Assessment and Analysis, Managing Reviews and Discrepancies, and Decision A
9、nalysis have been added. Appendix D, Technical Performance Metrics, has been deleted. Content from MSFC-HDBK-3599 has been integrated into the document. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MSFC Technical Standard EE11 Title: Project Manag
10、ement and Systems Engineering Handbook Document No.: MSFC-HDBK-3173 Revision: B Effective Date: October 12, 2012 Page 3 of 366 CHECK THE MASTER LIST-VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE at https:/repository.msfc.nasa.gov/docs/multiprogram/MSFC-HDBK-3173B Table of Contents 1. INTRODUCTI
11、ON . 7 1.1 Scope 7 1.2 Purpose . 7 2. REFERENCE DOCUMENTS 9 2.1 NASA Documents 9 2.2 MSFC Documents 10 2.3 Other Documents . 10 3. PROJECT MANAGEMENT 12 3.1 Program Life-cycles 13 3.1.1 Space Flight System Development Projects . 14 3.1.1.1 Formulation Phase 15 3.1.1.2 Project Approval 34 3.1.1.3 Pro
12、ject Implementation . 35 3.1.2 Technology Development Projects. 55 3.1.2.1 Technology Development Project Formulation . 56 3.1.2.2 Technology Development Project Evaluation . 62 3.1.2.3 Technology Development Project Approval 63 3.1.2.4 Technology Development Project Implementation . 63 3.2 Project
13、Team Organization . 66 3.2.1 Project Manager 67 3.2.2 Systems Engineering . 69 3.2.3 Safety and Mission Assurance 70 3.2.4 Procurement 70 3.2.5 Project Planning and Control . 70 3.2.6 Resident Office Representative . 71 3.2.7 Project Support Organizations . 71 3.2.7.1 Chief Engineer 72 3.2.7.2 Engin
14、eering Design Disciplines 72 3.3 Project Management Functions 72 3.3.1 Project Planning and Control . 73 3.3.2 Product Data and Life-cycle Management (PDLM) . 74 3.3.3 Safety and Mission Assurance 75 3.3.4 Systems Engineering Management . 76 3.3.4.1 Subsystem Engineering Management . 76 3.4 Project
15、Reviews. 77 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MSFC Technical Standard EE11 Title: Project Management and Systems Engineering Handbook Document No.: MSFC-HDBK-3173 Revision: B Effective Date: October 12, 2012 Page 4 of 366 CHECK THE MAST
16、ER LIST-VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE at https:/repository.msfc.nasa.gov/docs/multiprogram/MSFC-HDBK-3173B 3.4.1 Technical Reviews 79 3.4.1.1 Program System Requirements Review (P/SRR) 80 3.4.1.2 Program System Definition Review (P/SDR) . 80 3.4.1.3 Mission Concept Review (MCR)
17、80 3.4.1.4 System Requirements Review (SRR) 81 3.4.1.5 System Design Review (SDR) . 81 3.4.1.6 Preliminary Design Review (PDR) 81 3.4.1.7 Critical Design Review (CDR) 82 3.4.1.8 Design Certification Review (DCR) 83 3.4.1.9 Configuration Inspection/Physical Configuration Audit (CI/PCA) . 83 3.4.1.10
18、System Acceptance Review (SAR) 84 3.4.1.11 Pre-Ship Review (PSR) 85 3.4.1.12 Test Readiness Review (TRR) . 85 3.4.1.13 Operational Readiness Review (ORR) 85 3.4.1.14 Flight Readiness Review (FRR) . 85 3.4.1.15 Post-Launch Assessment Review (PLAR) 86 3.4.1.16 Critical Event Readiness Review (CERR) .
19、86 3.4.1.17 Post-Flight Assessment Review (PFAR) . 86 3.4.1.18 Decommissioning Review (DR). 86 4 SYSTEMS ENGINEERING 87 4.1 Systems Design Processes 92 4.1.1 Requirements Definition Processes . 92 4.1.1.1 Stakeholder Expectation Definition . 92 4.1.1.2 Technical Requirements Definition . 105 4.1.2 T
20、echnical Solution Definition Processes 113 4.1.2.1 Logical Decomposition 114 4.1.2.2 Design Solution Definition . 121 4.2 Product Realization Processes 131 4.2.1 Design Realization Processes 131 4.2.1.1 Product Implementation 131 4.2.1.2 Product Integration 135 4.2.2 Evaluation Processes . 140 4.2.2
21、.1 Product Verification and Product Validation . 140 4.2.3 Product Transition Process 155 4.2.3.1 Product Transition Approach . 156 4.2.3.2 Support required acceptance and pre-ship reviews of CSP 158 4.2.3.3 Coordinate the Handling, Shipping, Packaging, Preservation, and Delivery of CSP; when design
22、ated or assigned as the Marshall Lead Representative (MLR) . 159 4.2.3.4 Data Requirements Description (DRD) . 159 4.3 Technical Management Processes 159 4.3.1 Technical Planning . 159 4.3.2 Technical Control Processes 169 4.3.2.1 Requirements Management . 169 4.3.2.2 Interface Management 174 4.3.2.
23、3 Technical Risk Management . 186 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MSFC Technical Standard EE11 Title: Project Management and Systems Engineering Handbook Document No.: MSFC-HDBK-3173 Revision: B Effective Date: October 12, 2012 Page 5
24、 of 366 CHECK THE MASTER LIST-VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE at https:/repository.msfc.nasa.gov/docs/multiprogram/MSFC-HDBK-3173B 4.3.2.4 Configuration Management . 195 4.3.2.5 Data Management 220 4.3.3 Technical Assessment . 233 4.3.4 Technical Decision Analysis . 244 4.4 Lesson
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGMSFCHDBK3173REVB2012PROJECTMANAGEMENTANDSYSTEMSENGINEERINGHANDBOOKPDF

链接地址:http://www.mydoc123.com/p-1017438.html