1、*USACE / NAVFAC / AFCESA / NASA UFGS-23 52 49.00 20 (November 2008)-Preparing Activity: NAVFAC SupersedingUFGS-23 52 49.00 20 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION TABLE OF CONTENTSDIVISION 23 - HEATING, VENTILATING, AND A
2、IR CONDITIONINGSECTION 23 52 49.00 20STEAM BOILERS AND EQUIPMENT (500,000 - 18,000,000 BTU/HR)11/08PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.2.1 Heating Surface and Volume Measurements1.3 RELATED REQUIREMENTS1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Report of Prior Installations1.5.2 Start-
3、Up and Installation Engineer1.5.3 Qualifications of Engineer1.5.4 Installation1.5.5 Start-Up Plan1.5.6 Start-Up and Test1.5.7 Start-Up CertificationPART 2 PRODUCTS2.1 BOILERS2.1.1 Boiler Connections2.1.2 Boiler Instrumentation2.1.3 Boiler Plant Controls and Instruments2.1.4 Boiler Control and Instru
4、ment Cabinet(s)2.1.5 Free-Standing Multi-Boiler Plant Control and Instrument Panel2.1.5.1 Control Panel Construction2.1.5.2 Control Panel Wiring and Piping2.1.6 Hot Water Heater2.1.7 Noise Levels2.2 BOILER BREECHING2.2.1 Round Breeching2.2.2 Rectangular Breeching2.2.3 Breeching Hangers2.2.4 Cleanout
5、 Doors2.2.5 Stacks2.3 BLOWDOWN EQUIPMENT2.3.1 Bottom Blowdown TankSECTION 23 52 49.00 20 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.3.2 Sample Cooler2.3.3 Continuous Blowdown System2.4 FEEDWATER EQUIPMENT2.4.1 Boiler Feed Pumps2.4.2 Boil
6、er Feed Tank2.4.3 Deaerator2.4.4 Surge Tank and Transfer System2.4.5 Feedwater Treatment Equipment2.4.5.1 Feedwater Characteristics2.4.5.2 Water Softener2.4.6 Pressure Filter2.4.7 Chemical Feeder2.4.8 Feedwater Test Equipment2.5 ELECTRIC MOTORSPART 3 EXECUTION3.1 INSTALLATION3.1.1 Equipment Foundati
7、ons3.1.2 Welding3.1.3 Painting3.1.3.1 Cleaning and Application3.1.3.2 Smoke Flues, Boiler Casing, and Draft Ducts3.1.3.3 Gratings, Pipe Railings, and Pit Covers3.1.4 Boiler Cleaning3.1.5 Piping3.2 FIELD QUALITY CONTROL3.2.1 Inspections and Test3.2.2 Strength and Tightness Tests3.2.2.1 Hydrostatic Te
8、st3.2.2.2 Pneumatic Tests3.2.2.3 Internal Component Pressure Tests3.2.3 Combustion Tests3.2.4 Operational Test3.2.4.1 Sequencing3.2.4.2 Flame Safeguard3.2.4.3 Immunity to Hot Refractory3.2.4.4 Pilot Intensity Required3.2.4.5 Immunity to Ignition Spark3.2.4.6 Boiler Limit and Fuel Safety Interlocks3.
9、2.4.7 Combustion Controls3.2.4.8 Safety Valves3.2.5 Capacity and Efficiency Tests3.2.6 Auxiliary Equipment and Accessory Tests3.2.7 Feedwater Equipment Tests3.2.8 Preliminary Operational Test3.3 SCHEDULE- End of Section Table of Contents -SECTION 23 52 49.00 20 Page 2Provided by IHSNot for ResaleNo
10、reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-23 52 49.00 20 (November 2008)-Preparing Activity: NAVFAC SupersedingUFGS-23 52 49.00 20 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*
11、SECTION 23 52 49.00 20STEAM BOILERS AND EQUIPMENT (500,000 - 18,000,000 BTU/HR)11/08*NOTE: This guide specification covers the requirements for steam boilers and related equipment for capacities from 150 to 5275 kW 500,000 to 18,000,000 Btu/Hr.Edit this guide specification for project specific requi
12、rements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcom
13、e and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*NOTE: This guide specif
14、ication supersedes the requirements for these boilers and equipment contained in specification 52Y. Some paragraphs may need to be supplemented to meet the project requirements. The boilers are equipped for oil-, gas-, or oil-and-gas combination firing, as specified.*NOTE: The following information
15、shall be shown on the project drawings:1. Dimensions of construction2. Relationship of materialsSECTION 23 52 49.00 20 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3. Quantities, location and capacity of equipment.*PART 1 GENERAL1.1 REFERENC
16、ES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature w
17、hen you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project s
18、pecification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.ACOUSTICAL SOCIETY OF AMERICA (ASA)ASA S1.4 (198
19、3; Amendment 1985; R 2006) Specification for Sound Level Meters (ASA 47)AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)AISC 360 (2005) Specification for Structural Steel Buildings, with CommentaryAMERICAN WELDING SOCIETY (AWS)AWS D1.1/D1.1M (2008) Structural Welding Code - SteelAWS Z49.1 (2005) Safe
20、ty in Welding, Cutting and Allied ProcessesASME INTERNATIONAL (ASME)ASME B40.100 (2005) Pressure Gauges and Gauge AttachmentsASME BPVC SEC I (2007; Addenda 2008) Boiler and Pressure Vessel Code; Section I, Power BoilersSECTION 23 52 49.00 20 Page 4Provided by IHSNot for ResaleNo reproduction or netw
21、orking permitted without license from IHS-,-,-ASME BPVC SEC VIII (2007; Addenda 2008) Boiler and Pressure Vessel Codes: Section VIII Rules for Construction of Pressure Vessels, Division 1ASME BPVC SEC VIII D1 (2007; Addenda 2008) Boiler and Pressure Vessel Code; Section VIII, Pressure Vessels Divisi
22、on 1 - Basic CoverageASME CSD-1 (2006) Control and Safety Devices for Automatically Fired BoilersASME PTC 4 (1998) Fired Steam GeneratorsASTM INTERNATIONAL (ASTM)ASTM B 111/B 111M (2008) Standard Specification for Copper and Copper-Alloy Seamless Condenser Tubes and Ferrule StockASTM B 395/B 395M (2
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS23524900202008STEAMBOILERSANDEQUIPMENT50000018000000BTUHR 蒸汽锅炉 设备 50000018000000 BTUHRPDF

链接地址:http://www.mydoc123.com/p-984807.html