1、*USACE / NAVFAC / AFCESA / NASA UFGS-23 03 00.00 20 (August 2010)-Preparing Activity: NAVFAC SupersedingUFGS-23 03 00.00 20 (January 2007)UFGS-23 03 00.00 20 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONReferences are in agreement with UMRL dated July 2010*SECTION TABLE OF CONTENTSDIVISION 23 -
2、 HEATING, VENTILATING, AND AIR CONDITIONINGSECTION 23 03 00.00 20BASIC MECHANICAL MATERIALS AND METHODS08/10PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 RELATED REQUIREMENTS1.4 QUALITY ASSURANCE1.4.1 Material and Equipment Qualifications1.4.2 Alternative Qualifications1.4.3 Service Support1.4.4 Man
3、ufacturers Nameplate1.4.5 Modification of References1.4.5.1 Definitions1.4.5.2 Administrative Interpretations1.4.5.3 Sustainable Design Certification1.5 DELIVERY, STORAGE, AND HANDLING1.6 ELECTRICAL REQUIREMENTS1.7 ELECTRICAL INSTALLATION REQUIREMENTS1.7.1 New Work1.7.2 Modifications to Existing Sys
4、tems1.7.3 High Efficiency Motors1.7.3.1 High Efficiency Single-Phase Motors1.7.3.2 High Efficiency Polyphase Motors1.7.4 Three-Phase Motor Protection1.8 INSTRUCTION TO GOVERNMENT PERSONNEL1.9 ACCESSIBILITYPART 2 PRODUCTSPART 3 EXECUTION3.1 PAINTING OF NEW EQUIPMENT3.1.1 Factory Painting Systems3.1.2
5、 Shop Painting Systems for Metal SurfacesSECTION 23 03 00.00 20 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- End of Section Table of Contents -SECTION 23 03 00.00 20 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted
6、 without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-23 03 00.00 20 (August 2010)-Preparing Activity: NAVFAC SupersedingUFGS-23 03 00.00 20 (January 2007)UFGS-23 03 00.00 20 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONReferences are in agreement with UMRL dated July 2010*SECTION
7、23 03 00.00 20BASIC MECHANICAL MATERIALS AND METHODS08/10*NOTE: This guide specification covers the requirements for the mechanical general requirements for all sections of Divisions: 21, FIRE SUPPRESSION; 22, PLUMBING; and 23 HEATING VENTILATING AND AIR CONDITIONING.Edit this guide specification fo
8、r project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide
9、specification are welcome and should be directed to the technical proponent of the specification. A listing of Technical Proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).
10、*NOTE: This guide specification can be applied to other divisions of the project specification.*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and
11、listed in this paragraph by organization, designation, date, SECTION 23 03 00.00 20 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference
12、 Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile reference
13、s in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM B 117 (2009) Standing Practice for Operating Salt Spray (Fog) Apparat
14、usGREENGUARD ENVIRONMENTAL INSTITUTE (GEI)GEI Greenguard Standards for Low Emitting ProductsINSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)IEEE C2 (2007; TIA 2007-1; TIA 2007-2; TIA 2007-3; TIA 2007-4; TIA 2007-5; Errata 2006-1; Errata 2007-2; Errata 2009-3 ) National Electrical Safety Code
15、NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)NEMA MG 1 (2009) Motors and GeneratorsNEMA MG 10 (2001; R 2007) Energy Management Guide for Selection and Use of Fixed Frequency Medium AC Squirrel-Cage Polyphase Induction MotorsNEMA MG 11 (1977; R 1997; R 2001; R 2007) Energy Management Guide for
16、 Selection and Use of Single Phase MotorsNATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 70 (2008; TIA 08-1) National Electrical CodeSCIENTIFIC CERTIFICATION SYSTEMS (SCS)SCS Scientific Certification Systems (SCS)Indoor AdvantageSECTION 23 03 00.00 20 Page 4Provided by IHSNot for ResaleNo reproducti
17、on or networking permitted without license from IHS-,-,-1.2 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required f
18、or adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system.
19、Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Code
20、s for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typicall
21、y are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for C
22、ontractor Quality Control approval.for information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-03 Product DataCertifi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS23030000202010BASICMECHANICALMATERIALSANDMETHODS 基础 机械 材料 方法 PDF

链接地址:http://www.mydoc123.com/p-984796.html