NAVY MIL-T-23449 A (1)-1969 TRANSMITTING SET RADIO AN PRT-5( )《AN PRT-5( )广播电台传输装置》.pdf
《NAVY MIL-T-23449 A (1)-1969 TRANSMITTING SET RADIO AN PRT-5( )《AN PRT-5( )广播电台传输装置》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-T-23449 A (1)-1969 TRANSMITTING SET RADIO AN PRT-5( )《AN PRT-5( )广播电台传输装置》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-T-23447A (1) 58 M 7797706 0152221 2 M I I P4I.Lt-T -2344gA(AS) Amenment-1 20 October i969 . Miiitwj Specification Transndttirg Set, Radio AN/PRT-5 (*) Plis amendment forms a part of Wlitaxy specification bKGR-23449A(AS), 28 Jsly 1969, and has been approved by the Naval Air Systems Comd, Departme
2、nt of the Navy. Page 2, Paragraph 2.1, under Naval Air Systems Comd: Add - Failure Classification for Reliability Testing , General Requirements for“ Page 10, Paragraph 4.4.1.3: Delete and Substitute: under the conditions specified herein for a period of ten hours witnout failure. ing of the equipme
3、nt. be made by using such controls and adjustments that are accessible to the operator during the nom use of the equipment. deleted if the reliability test includes a test on each equipment which consumes at least ten hours of operation 4.4.1.3 Manufacturing Run in Test- Each equipment shall be oper
4、ated A failure shall be defined as anything which causes malfunction- Only those adjustments will be permitted which can This test shall be Temperature Humidity Vibration Ambient room Ambient room Any selected frequency within the range of 20 to 30 cps (excluding resonant poigts) and a minimum ampli
5、tude of - + 3 gs The equipment shall be vibrated (without vibration isolators) for a period of ten minutes prior to the beginning of the ten hour period of operation. Where feasible, the equipment shall be operated during this vibration per- icd for the purpose of detecting flaws and imperfect workm
6、anship, tion within the specified limits of satisfactory performance is not necessar- iiy required during the vibration period. snould be vertical to the nom1 mounting plane for five minutes and lateral to the plane for five minutes. eqment in two directions the vertical direction shall be used. the
7、 ten hour period of operation following the ten minute vibration period, the equipment shall be mechanically cycled periodically throqh its various phases of operation. Opera- ?“ne direction of vibration Where it is not feasible to vibrate the During Should a failure occur, it should be TtjM FUMENT
8、CNTWS a _?AB. FSC 5820 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1. MIL-T-23447A (1) 58 7779706 O352222 4 I, MILT -23449A(AS) Amendment -1 20 October i969 repaired and the test started over, except that the ten minute vibration period need not
9、be repeated when it is certain the failure was not a re- sult of the vibration. shall be taken to eliminate this defect from fiture equipment. A record shall be kept of all failures. be composed of two five hour periods to conform with standard working hours. Should repetitive failures occur, correc
10、tive action The ten hour period specified above my Page 11, Paragraph 4.4.1.3.1: Delete Page 11, Paragraph 4.4.1.3.2: Delete Page 12, Paragraphs 4.4.2 thru 4.4.2.4: Delete and Substitute: 4.4.2 Reliability Assurance Tests- Reliability Assurance Tests shall be conducted using 1&m781. Tests as reauire
11、d bs both the Qualification Phase and-the Product ion Acceptance (SampliG) Phase shall be conducted. Classification of failure shall be in accordance with MIGSTD-781 and AR-34. 4.4.2.1 Qualification Phase- Prior to the acceptance of equipments under the contract or order, a minimum of three (3) equi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILT23449A11969TRANSMITTINGSETRADIOANPRT5ANPRT5 广播电台 传输 装置 PDF

链接地址:http://www.mydoc123.com/p-982623.html