NAVY MIL-P-82442-1966 PUMP SEA WATER《海水泵》.pdf
《NAVY MIL-P-82442-1966 PUMP SEA WATER《海水泵》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-P-82442-1966 PUMP SEA WATER《海水泵》.pdf(22页珍藏版)》请在麦多课文档分享上搜索。
1、Licensed by Information Handling Services3. REQUIREMENTS 3.1 Classification of requirements. The requirements for the pump are classified as follows: REQUIREMENTS PARAGRAPH General Requirement s 3.2 Performance Requirements and Product Characteristics 3.3 Environmental Requirements 3.4 Operational S
2、ervice Life 3.5 T 3.2 General requirements. 3.2.1 Data requirements. No data is required by this specification or approval documents referenced in Section 2 unless specified in Con- tract or purchase order. See 6.2. 3.2.2 Preproduction sample. Unless otherwise specified in the con- tract or purchase
3、 order, the preproduction sample of the pump shall be manufactured using the methods and prcedures proposed for production. The sample will be tested as specified in Section 4 herein and is for-the purpose of determining that prior to starting production; the contractors production methods are capab
4、le of yielding items that comply with the technical requirements of the contract. 3.2.3 Materials. Unless otherwise specified in the contract or purchase order,all materials and treatments of materials and parts used in the manufacture of the pump shall be in accordance. with the applicable document
5、s listed on BuWeps DL 1568923. 3.2.4 Definitions. Definitions of terms appear in Section 6. 3.3 Performance requirements and product characteristics. Un- less specified otherwise, the pumps shall satisfy the following performance -_ requirements when tested as specified in Section 4. 2 Licensed by I
6、nformation Handling ServicesME-P-824.42 (OS) 3.3.1 Pressure and flow requirements. The pump shall provide a discharge at a flow rate of 8.3 gallons per minute (gpm) minimum, at a pressure of 265 pounds per square inch gage (psig) minimum when operated at 3880 f 10 revolutions per minute (rpm), with
7、an inlet pressure of 15 psig. 3.3.2 Static case pressure. The pump shall be capable of with- standing internal pressures of 1250 psig minimum without leakage. 3.3.3 The pump shall be capable of pumping fresh water or a salt solution (6.3.9) at temperatures between +32“ F and +98“ F. Fluid. 3.3.4 Dut
8、y cycle. The pump shall be capable of operation-for 10 duty cycles of 7 minutes each, at rated discharges as specified in 3.3.1 3.4 Environmental requirements. Unless otherwise specified, the pump shall be capable of conforming to the performance requirements and product characteristics of the speci
9、fication after being exposed.to the environmental conditions specified in this section. For definitions of ready, operating, and non-operating see 6.3.1, 6.3.2, and 6.3.3. 3.4.1 Vibration, ready condition. The pump, mounted as shown in Figure 1, shall be capable of meeting the performance requiremen
10、ts after being subjected, in the ready condition, to the vibrations defined in Table I. The pump shall be vibrated for 180 minutes each in its longi- tudinal axis and in two mutually perpendicular transverse axes at any temperature within the range of -45“ F to +140“ F. in 6.3.4. Vibration is define
11、d 1 TABLE I VIBRATION SCHEDULE Double Amplitude Acceleration Frequency (in. _C 10%) Minimum (gs f 10%) Minimum (cps) o. 2 O. 036 - 1 - 5 - 22 22 - 40 40 - 74 74 - 500 Licensed by Information Handling Services- Peak Di;rc?:I:ion Of Number Test Magnitude Duration Impact Deceleration Of Sequence (as t:
12、 10%) (ms Axis Force Impacts 1 300 0.5 to 1.5 Longitudinal Aft 3 2 85 0.5 to 1.5 Transverse A Optional 3 3 85 0.5 to 1.5 Transverse B Optional 3 4 45 18.0 to 20.0 Longitudinal Fwd 3 5 60 8.0 to 10.0 Longitudinal Aft 3 6 60 8.0 to 10.0 Longitudinal Fwd 3 7 60 8.0 to 10.0 Transverse A Optional 3 8 60
13、8.0 to 10.0 Transverse B Optional 3 Licensed by Information Handling ServicesMIL-P-829q2 I3 U 7777906 03b0896 I m MIL-P-824.42 (OS) 3.4.4-1 Non-operating. - a. Temperature. The pump shall be capable of meeting the performance requirements subsequent to withstanding, in the non-operating condition, e
14、nvironmental tempera- tures between -45“ F and +140“ F. fined in 6.3.7. Temperature is de- - b. Humidity. The pump shall be capable of meeting the performance requirements subsequent to withstanding, in the non-operating condition, an environment of at least 95 percent relative humidity at 3-110“ F
15、for a minimum period of 8 hours. Humidity is defined in 6.3.8. 3.4.4.2 Ready, operating. The pump immediately after being condi- tioned for 1 hour at any temperature between O“ F and +140“ F shall be capable of meeting the performance requirements, using a salt solution, at any temperature between +
16、32“F and +98“ F. 3.5 Operational service life. The pump shall have a minimum service life of 70 minutes which shall be divided into 10 duty cycles of 7 minutes each. 3.6 Workmanship. The workmanship and finish shall be of sufficiently high grade to insure satisfactory operation consistent with the r
17、equirements of this specification. The assembly shall be thoroughly clean and free of excess materials, chips, and loose or spattered foreign materials. The standards of workmanship exhibited in any approved pre- production sample, subject to any qualification stated in the Govern- mentss notice of
18、approval, shall be determinative of the requirements of the contract relative to workmanship insofar as not specifically covered by applicable specifications. 4* QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the supplier
19、 is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the supplier may utilize his own facilities or any commercial laboratory acceptable to the Government. The Government reserves the right to perform any of the inspections set forth
20、in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Licensed by Information Handling ServicesPlIL-P-Zq42 13 7977706 0360897 3 MIL-P-82442 (OS) d 4.2 Classification of inspection, Inspection of the pump shall be classifi
21、ed as follows: - a. Preproduction inspection (Subsection 4.4) . b. Acceptance inspection (Subsection 4.5) - c. Periodic inspection (Subsection 4.6) - d. Examination of first echelon repair parts (Subsection 4.7) - 4.3 S amp 1 ing . 4.3.1 Preproduction inspection sample. A preproduction sample of 3 p
22、umps manufactured in accordance with 3.2 shall be subjected to the preproduction tests listed in Table IV and detailed in 4.4 through 4.4.4.10 at an activity designated by the procuring activity. of the preproduction sample shall be based on no defects in the sample. See 4.4.6. Further production of
23、 the pump by the supplier, prior to approval of the preproduction sample shall be at the suppliers risk. Acceptance 4.3.2 Periodic production sample. Periodic production samples shall be selected from units that have satisfactorily passed the acceptance inspections of 4.5. These samples shall be sub
24、jected to the tests of 4.6 at an activity designated by the procuring activity. Periodic production sampling shall be as follows: Upon initiation of production randomly select 1 Step 1. unit from each group of 30 units. Upon satisfactory com- pliance of samples selected from 3 consecutive groups, sh
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILP824421966PUMPSEAWATER 海水 PDF
