NAVY MIL-P-15554 B (2)-1986 PROPELLER REVOLUTION INDICATING EQUIPMENT SYNCHRO (NAVAL) SHOW 180《同步(海军)显示180的螺旋桨转数指示设备》.pdf
《NAVY MIL-P-15554 B (2)-1986 PROPELLER REVOLUTION INDICATING EQUIPMENT SYNCHRO (NAVAL) SHOW 180《同步(海军)显示180的螺旋桨转数指示设备》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-P-15554 B (2)-1986 PROPELLER REVOLUTION INDICATING EQUIPMENT SYNCHRO (NAVAL) SHOW 180《同步(海军)显示180的螺旋桨转数指示设备》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、MlL-P-155541i ( SH I PS ) AMENDMENT 2 28 November 1986 SUYEKSb:DIKG AMENDMENT 1 1 March 1967 MILLTAKY SPECLPICtlTION PKOPELLKK KEVOLUTION INI) LCATINC EQUIlhENT, SYNCHRO (NAVAL SHIPBOARD USE) his amt?ndmriit forms a part of MIL-P-l5554B(SHlPS), dated 9 November 190 1, ;tiid is approved for use withi
2、n the Naval Sea Systems Command, cpartincnt oi tlie Nrivy, and is available for use by all Departiiieiits and Agencies of tlie Lkyartmeiit of Defense. PAGES 2 and 3 2.1 : Under SPEC1FlCATIONS MILLTARY: Delete “MIL-F-22843.“ 2.1: Under STANDARDS MILITARY: Add “MIL-STD-740 - Airborne and Structure- bo
3、rne Noise Measurements and Acceptance Criteria of Shipboard Equipment.“ PAGE 4 * 3.1: elete and substitute: “3.1 First article. When specified in the contract or purchase order, a sample shall be subjected to first article inspection (see 4.2 and 6.2): PAGE 7 3.13, lines 3 and 4: Delete “grade B noi
4、se requirements of MIL-E-22843, as specified (see 6.1)“ and substitute “noise requirements of MIL-STD-740 for type 3 equipment, as specified (see 6.1). Equipment undergoing structureborne test shall be non-solidly niountd, with acceptance criteria increased by 12 decibels.“ AMSC NIA FSC 6320 DISTRIB
5、UTION STATEMENT A Approved for public release; distribution unlimited 1 of 3 Licensed by Information Handling ServicesProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-* MIL-P-155548 (2) b3 9999906 023b953 3 MIL-P-l5554B(SHIPS) AMENDENT 2 PAGE 11 4.1:
6、Delete and substitute: “4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements as specified herein. in the contract or purchase order, the contractor may use his own or any othe
7、r facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and servi
8、ces conform to prescribed requirements. Except as otherwise specified * 4.1.1 Responsibility for compliance. All items must meet all requirements of sections 3 and 5. a part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the specificati
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILP15554B21986PROPELLERREVOLUTIONINDICATINGEQUIPMENTSYNCHRONAVALSHOW180 同步 海军 显示 180 螺旋桨 转数 指示 设备

链接地址:http://www.mydoc123.com/p-980528.html