1、MIL-U-23530A 20 H 9999906 03926117 5 MIL-M-23530A (SH) 8 June 1978- SUPERSEDING MIL-M-23530 (SHIPS) 21 February 1962 , (See 6.5) MILITARY SPECIFICATION MOCK-UPS OF MAIN AND AUXILIARY SHIPBOARD MACHINERY SPACES This specification is approved for use by the Naval Sea Systems Command and is available f
2、or use by all Departments and Agencies of the Depart- ment of Defense. 1. SCOPE 1.1 Scope. This specification covers the requirements for the development and presentation of mock-ups of main and auxiliary shipboard machinery spaces and the require- ments for mock-up booklet and other supporting docu
3、mentation. required for spaces such as the engine room, fire room, auxiliary spaces, fairwater, uptakes, fan rooms, countermeasure launcher room, torpedo room, or other spaces or stations, as specified (see 6.2.1). of the types and classes specified in 1.2.1 and 1.2.2, as specified (see 6.2.1). Mock
4、-ups will normally be 1.2 Classification. Mock-ups of machinery spaces and equipment components shall be 1.2.1 Types. Machinery space mock-ups shall be of the following types: - Type I - Reduced scale. Type II - Full scale. 1.2.2 Classes. Class 1 - Exact reproduction of shape and external dimensions
5、. Class 2 - Reproduction of general shape and major external dimensions in sufficient detail to permit easy identification and to ensure arrangements compat- ibility with all adjacent equipment, components , and systems. Class 3 - Edproduction to show volume occupied by an item by use of blocks, oth
6、er simple shapes, or combinations of shapes. Equipment components and systems shall be of the following classes: . 2. APPLICABLE DOCUMENTS 2.1 Issues of documents. The following document, of the issue in effect on date of invitation for bids or request for proposal, forms a part of this specificatio
7、n to the extent specified herein: STANDARD MILITARY MIL-STD-129 - Marking for Shipment and Storage. (Copies of specifications , standards , drawings, and publications required by contractors in connection with specific procurement functions should be obtained from the procuring activity or as direct
8、ed by the contracting officer.) the extent-i- Unless otherwise indicated, the issue in effect on date of in- vitation for bids or request for proposal shall apply. 2.2 Other ublications. The following documents form a part of the specification to Beneficial comments (recommendations, additions, dele
9、tions) and any pertinent data which may be of use in improving this document should be addressed to: Commander, Naval Ship Engineering Center, SEC 6124, Department of the Navy, Washington, DC 20362 by using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at
10、the end of this document or by letter. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-23530A 20 3977906 03726118 7 MIL-M-235 3 OA ( SH) NATIONAL FIRE PROTECTION ASSOCIATION National Electric Code. (Application for copies should be addressed to
11、 the National Fire Protection Association, 470 Atlantic Avenue, Boston, Massachusetts 02210.) UNIFORM CLASSIFICATION COMMITTEE Uniform Freight Classification Ratings, Rules and Regulations. (Application for copies should be addressed to the Uniform Classification Cormnittee Agent, G. F. Earl, Tariff
12、 Publication Officer, Room 1106, 222 South Riverside Plaza, . Chicago, Illinois 60606.) NATIONAL CLASSIFICATION BOARD National Motor Freight Classification Classes and Rules. (Application for copies should be addressed to the ATA Tariff Section, 1616 P Street, (Technical society and technical associ
13、ation specifications and standards are generally N.W., Washington, DC 20036.) available for reference from libraries. They are also distributed among technical groups and using Federal agencies.) 3. REQUIREhaNTS 3.1 General. Unless otherwise specified in the contract (see 6.2.1), mock-up construc- t
14、ion, including any required approvals, shall be completed prior to release of construction drawings for ship construction. Mock-up construction shall be based on drawings developed by the contractor, and shall reflect NAVSEA direction and guifiance provied by submission to the contractor of document
15、s such as drawings, sp.cifications, schedule of equipment require- ments, Design Work Studies (DVS), and other details as required to reflect design concepts, including shipboard compartmentation, passageway configuration, space allocation, and major structural interferences. Drawingcrequired for Go
16、vernment-furnished equipment and material will be provided by NAVCEA or a NAVSEA-authorized source. and guidance is not provided, the contractor shall assume responsibility for development of In areas where NAVSEA direction . such areas. 3.2 Design. Contractor shall design the mock-up to facilitate
17、evaluation of the proposed design in order to determine suitability with respect to functional and operational requirements in conformance with 3.2.2. to enable such functions to be readily simulated. board heights, clearances, and other dimensional requirements. Space perimeters shall be defined by
18、 inclusion of false decks, decks, overheads, bulkheads, and interfering stanchions, beams, and girders. All items of machinery and equipment shall be shown, and perimeters shall be defined by reproduction to the detail required as specified herein and shall include foundations, shock mounts, and ite
19、ms such as intesconnecting conduit, pipe, tanks, manifolds, panels, gageboards, gratings, and cables, and access requirements for operation, control, and maintenance. Component dimensions shall include insulation where used over equipment and pipfng. as in pipes and valves) and of personnel (from a
20、human factors viewpoint) shall be shown. For type II, flushing breaks, test connections, transition welds, and control and sensing elements shall be identified. Additionally, obstructions or intrusions into the space of items such as ventilation, piping, lighting, insulation, and wireways shall be m
21、odeled or simulated as required for evaluation of impact. design and functional requirements by consideration of the following: Components shall be reproduced to the detail required 3.2.1 Details. Mock-up shall be in sufficient detail to correctly depict actual ship- Where applicable, and significan
22、t for operation, flow direction of material (such 3.2.2 Function. Nock-ups shall be capable of demonstratina compliance with ship (a) Functional operability, including human factors engineering concepts, manning, (b) (c) personnel requirements, and general safety features. ments. instruments, thermo
23、meters, valves, controls, telephones, indicators, and other items requiring visual, sound, or manual observations or attention in the operation of the plant). Capability for continued system operation with shutdovm or removal of a dupli- cate unit for repair. Elimination of interferences by indicati
24、on of actual operating space require- Provision of optimum control area arrangement and operating facilities (gages, (d) 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-2353OA 20 W 7777906 OL72b47 7 MIL-M-23530A(SH) (e) if) Consideration of e
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILM23530A1978MOCKUPSOFMAINANDAUXILIARYSHIPBOARDMACHINERYSPACES 主要 辅助 军舰 机舱 实体 模型 PDF

链接地址:http://www.mydoc123.com/p-980333.html