NAVY MIL-B-21160 (2)-1978 BLADDERS FLOTATION MK 2 MOD 0 AND MK 2 MOD 1《 MK 2 MOD 0 和 MK 2 MOD 1浮选气泡》.pdf
《NAVY MIL-B-21160 (2)-1978 BLADDERS FLOTATION MK 2 MOD 0 AND MK 2 MOD 1《 MK 2 MOD 0 和 MK 2 MOD 1浮选气泡》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-B-21160 (2)-1978 BLADDERS FLOTATION MK 2 MOD 0 AND MK 2 MOD 1《 MK 2 MOD 0 和 MK 2 MOD 1浮选气泡》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-B-21160 (OS) AMENDMENT 2 SUPERS ED ING AMENDMENT 1 12 February 1963 8 June 1978 Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this docment should be addressed to: Naval Ordnance Station, Attn: Standardization Division (611), I
2、ndian Head, MD 20640 by using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. MILITARY SPEC IFICAT 103 BLADDER, FLOTATION, MARK 2 MOD 1 This amendment forms a part of Military Specification MIL-B-21160(NOrd) dated 29
3、 November 1957. PAGE 1 I * Title, and wherever it appears in the specification, delete “Mark 2 MOD O“ and substitute “Mark 2 MOD 1“. Add the following preamble: “This specification is approved for use by the Naval Sea Systems Command (OS), Department of the Navy, and is avail- able for use by all De
4、partments and Agencies of the Department of Defense. I * Wherever it appears in the specification delete “Bureau of Ordnance and substitute “Naval Sea Systems Command;“ also delete “BUORD“ and substitut e “NAVSEA“ . * Wherever it appears in the specification delete “LD 288859“ and substitute “133212
5、0“. 1 * Bottom of page add: I I II PAGE 2 $ 2.1 Under drawings add : “1380921 Liner Assembly“. PAGE 3 3.1 Add at the end: “A support frame to carry two standard non- magnetic SCUBA air bottles is fastened to the bottom of the bladder. An electrically initiated explosive valve (not included in the sy
6、stem) provides a method for remote operation of the flotation bladder.“ IHIS DOCUMENT: CONTAINSA-PAGES I /- Y Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-* * * MIL-B-22260 (2) 20 I-7777706 0271708 2 I. MIL-B-21160(OS) AWNDMENT 2 ) 3.2.1 Delete th
7、e entire paragraph and substitute the following: . “3.2.1 Preproduction sample. An acceptable preproduction sample of a flotation bladder, manufactured at the same location, using the same tooling and equipment proposed for full production and complying with all applicable provisions of this documen
8、t shall be furnished by the contractor. of the quantity specified for delivery by the contract.“ The preproduction sample shall not be applied as part PAGE 6 4.1 Delete the entire paragraph and substitute the following: “4.1 Responsibility for inspection. Unless otherwise specified in the contract,
9、the contractor is responsible for the performance of all inspection requirements as specified herein. in the contract, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Govern
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILB2116021978BLADDERSFLOTATIONMK2MOD0ANDMK2MOD1MK2MOD0 MK2MOD1 浮选 气泡 PDF

链接地址:http://www.mydoc123.com/p-977206.html