MSFC NASA MPR 4500 1 REV C-2008 MANAGEMENT OF PROPELLANTS AND PRESSURANTS《推进剂和压力剂的管理》.pdf
《MSFC NASA MPR 4500 1 REV C-2008 MANAGEMENT OF PROPELLANTS AND PRESSURANTS《推进剂和压力剂的管理》.pdf》由会员分享,可在线阅读,更多相关《MSFC NASA MPR 4500 1 REV C-2008 MANAGEMENT OF PROPELLANTS AND PRESSURANTS《推进剂和压力剂的管理》.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE MPR 4500.1 REVISION C EFFECTIVE DATE: September 29, 2008 EXPIRATION DATE: September 29, 2013 MARSHALL PROCEDURAL REQUIREMENTS ED01 MANAGEMENT OF PROPELLANTS AND PRESS
2、URANTS Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements ED01 Management of Propellants and MPR 4500.1 Revision: C Pressurants Date: September 29, 2008 Page 2 of 16 CHECK THE MASTER LIST at https:/repository.msfc.nasa.g
3、ov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE DOCUMENT HISTORY LOG Status (Baseline/ Revision/ Canceled) Document Revision Effective Date Description Baseline 5/17/00 This document is being rewritten from MMI 4000.4 to an MPG. Revision A 10/22/2004 Revised to clarif
4、y ambiguity between “Guidelines and Requirements.” Requirements distinguished by use of the word “shall.” Reflects minor editorial changes. Revision B 5/10/2006 Updated document to reflect organizational name and org code changes due to the MSFC transformational realignment. Revision C 9/29/2008 Rev
5、ised 2. Applicability statement to address the applicability of this directive to the Michoud Assembly Facility. Added text in various places throughout the document to clarify the applicability to MAF as a separate delivery order location for the agency-wide consolidated propellants contracts. Refl
6、ects minor editorial changes. Updated to reflect the fact that billing and processing payment to supplier is performed through the NSSC. Updated section 4, Records, to clarify the COTR records which become part of Official Contract File and to specify record retention requirements for other COTR rec
7、ords per NPR 1441. Updated flowchart to clarify the process whereby the COTR approves payments which are then certified by CO. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements ED01 Management of Propellants and MPR 450
8、0.1 Revision: C Pressurants Date: September 29, 2008 Page 3 of 16 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE TABLE OF CONTENTS Preface P.1 Purpose P.2 Applicability P.3 Authority P.4 Applicable Documents P.5 R
9、eferences P.6 Cancellation Document Content 1. Definitions 2. Responsibilities 3. Procedure 4. Records 5. Flow Diagram Appendix. Forms Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements ED01 Management of Propellants and
10、 MPR 4500.1 Revision: C Pressurants Date: September 29, 2008 Page 4 of 16 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE PREFACE P.1 PURPOSE To identify responsibilities and establish uniform operating procedures
11、for the management of propellants and pressurants used by programs, other Government agencies, and respective contractors, at Marshall Space Flight Center (MSFC), and at MSFCs Michoud Assembly Facility (MAF). Propellants and pressurants used by MSFC and MSFCs MAF programs and projects (including con
12、tractor usage) shall be furnished by the supplier identified in the Agency-wide contract, except in cases where small quantities and/or other extenuating circumstances justify individual commercial procurement. P.2 APPLICABILITY a. This Marshall Procedural Requirements (MPR) applies to the personnel
13、, programs, projects, and activities at MSFC and MSFCs MAF, including contractors and resident agencies to the extent specified in their respective contracts or agreements. (“Contractors,” for purposes of this paragraph, include contractors, grantees, Cooperative Agreement recipients, Space Act Agre
14、ement partners, or other agreement parties.) b. This MPR is applicable to all organizational elements that utilize propellants and pressurants at MSFC and MSFCs MAF. P.3 AUTHORITY MPD 1280.1, “Marshall Quality Management System Manual” P.4 APPLICABLE DOCUMENTS a. NPR 1441.1, “NASA Records Retention
15、Schedules” b. MWI 5100.1, “Initiating Procurement Requisitions” P.5 REFERENCES a. MPR 5000.1, “Purchasing” b. MWI 5143.1, “Contract Change Process” c. MWI 8715.10, “Explosives, Propellant, and Pyrotechnics Program” d. KDP-P-1765, “Procurement of Propellants, Pressurants, Special Fluids, and Governme
16、nt Furnished Material (GFM) at Kennedy Space Center (KSC)/Cape Canaveral Air Force Station (CCAFS) Establish New Source” Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements ED01 Management of Propellants and MPR 4500.1 Re
17、vision: C Pressurants Date: September 29, 2008 Page 5 of 16 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE e. KDP-P-1766, “Propellants, Pressurants, Special Fluids 3.8.2 The financial status report; 3.8.3 The reco
18、rd of product quantities received; and 3.8.4 The monthly estimates of quantities required. 3.9 Each user shall estimate the amount of product needed for an agreed upon period of time and provide this information to the COTR. 3.10 The COTR ensures that adequate funding is on the delivery order to cov
19、er charges incurred by all users. 3.11 The CO issues a delivery order to cover an agreed upon period of time. 3.11.1 The quantity of product and the funding for such quantity shall be specified on the delivery order. 3.11.2 The delivery order shall be placed only by the authorized individual. 3.11.3
20、 The delivery order shall cite the specific quantity, period for the delivery, and the contract to which it is to be charged. 3.12 Each user shall place requests for actual delivery on an as-needed basis through the P&P services contractor. 3.13 The P&P services contractor shall consolidate the abov
21、e estimates from all users and generate a total estimate of requirements. 3.14 This overall estimate (production order) shall be provided to the respective supplier through contractual channels and the COTR. 3.15 The supplier shall deliver the product to the predetermined location as stated in the d
22、elivery order. 3.15.1 The supplier shall provide documentation showing all pertinent information such as: type of product, quantity, and delivery date. 3.15.2 The supplier shall then bill MSFC through the NSSC. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from
23、 IHS-,-,-Marshall Procedural Requirements ED01 Management of Propellants and MPR 4500.1 Revision: C Pressurants Date: September 29, 2008 Page 13 of 16 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE 3.16 The P&P se
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- MSFCNASAMPR45001REVC2008MANAGEMENTOFPROPELLANTSANDPRESSURANTS 推进 压力 管理 PDF

链接地址:http://www.mydoc123.com/p-822876.html