ITU-T M 1016-1988 ASSESSMENT OF THE SERVICE AVAILABILITY PERFORMANCE OF INTERNATIONAL LEASED CIRCUITS《国际租用电路业务可用性性能的评估》.pdf
《ITU-T M 1016-1988 ASSESSMENT OF THE SERVICE AVAILABILITY PERFORMANCE OF INTERNATIONAL LEASED CIRCUITS《国际租用电路业务可用性性能的评估》.pdf》由会员分享,可在线阅读,更多相关《ITU-T M 1016-1988 ASSESSMENT OF THE SERVICE AVAILABILITY PERFORMANCE OF INTERNATIONAL LEASED CIRCUITS《国际租用电路业务可用性性能的评估》.pdf(17页珍藏版)》请在麦多课文档分享上搜索。
1、INTERNATIONAL TELECOMMUNICATION UNION)45G134 - TELECOMMUNICATIONSTANDARDIZATION SECTOROF ITU-!).4%.!.#% ).4%2.!4)/.!,G0G0,%!3%$G0G0#)2#5)43!33%33-%.4G0G0/ national purposes.3.2 International purposesThe assessment procedure is used for international purposes when two Administrations wish to assess t
2、ogetherthe performance of individual international leased circuits (or a group of circuits) as a whole for special investigations,for dealing with customers complaints or similar situations.For such assessments it is necessary, as far as practicable, to gather simultaneously all available informatio
3、n onthe performance of the circuit(s) from the Administrations involved. Thus, the stations with control responsibilities(Recommendations M.1012 and M.1013) play an essential role._1)In this Recommendation only full-time, point-to-point international leased circuits (as defined in Recommendation M.1
4、010 andspecified in Recommendations M.1020, M.1025 and M.1040) are considered. The service availability performance of part-time,wide-band, multi-terminal, tec. international leased circuits requires further study.2 Fascicle IV.2 - Rec. M.1016Note This approach should be followed when investigations
5、 of the service availability performance ofinternational leased circuits is undertaken by CCITT, as may be required from time-to-time.3.3 National purposesThe assessment procedure is used for national purposes when an individual Administration wishes to provideitself with information for its own int
6、ernal purposes on the performance of the international leased circuits it operates,for example, to identify adverse trends in performance, or to check the effectiveness of its maintenance procedures. Suchevaluations of international leased circuit performance may be based on information already avai
7、lable to theAdministration (without the need to gather information from other Administrations), and may be carried out for allcircuits whether or not the Administration provides the control station.Note Assessments of the type mentioned in 3.1 and 3.2 above in no way change the intent that controlst
8、ations be informed of all faults detected by a sub-control station see Recommendation M.1013.4 Description of the assessment procedure4.1 Collection of basic dataThree fundamental conditions must be taken into account when collecting basic data for assessing the serviceavailability performance of in
9、ternational leased circuits:a) faults, as reported by the customer and confirmed by tests and investigations carried out by theAdministrations;b) impairments to normal service, as reported by the customer, where the customer chooses to continue touse the circuit in a degraded condition;c) planned in
10、terruptions to service to enable, for example, permanent repair work to be carried out,maintenance routines to be performed, etc. (see Recommendation M.490 3).In determining if and how downtime is to be included in the assessment procedure, the following principlesshould be applied: if tests or inve
11、stigations reveal that a fault or impairment exists (or has existed), downtime will be takeninto account; if no fault or impairment is ever observed by the Administration, no downtime will be taken into account; the time the Administration returns service to the customer (or the first attempt to do
12、so) is taken as theend of downtime; only those planned interruptions which unacceptably disrupt the customers service will be taken intoaccount.Note Where the bandwidth of the circuit is divided to provide for simultaneous multiple transmission ofdifferent services (for example, simultaneous speech
13、plus data), only those faults which affect the entire circuit andpartial faults which require the entire circuit to be taken out of service for fault finding and repair should be taken intoaccount in the assessment procedure.These principles are embodied in Tables A-1/M.1016 and A-2/M.1016, which de
14、fine those conditions wheredowntime should be taken into account, and the start and end of downtime, for customer reported faults and plannedinterruptions of service respectively.In certain circumstances the assistance of the customer or access to his premises is necessary to locate/clear afault or
15、an impairment to service. Where the customer denies such assistance, or denies access to his premises, the extradowntime which may result should be excluded from the assessment of performance.Fascicle IV.2 - Rec. M.1016 34.2 Basic dataThe basic data required in connection with the assessment procedu
16、re are: the number of international leased circuits involved. Guidance on how to determine this number is givenin Annex B; the designation of each circuit involved, as agreed between Administrations in accordance withRecommendation M.140 4; for each involved circuit, the number of faults and unaccep
17、table planned interruptions of service withinthe observation period (refer to Annex A); for each fault and planned interruption of service:i) the start of downtime (in UTC)2)ii) the end of downtime (in UTC)iii) the duration of downtime; the address(es) of involved Administrations and, ideally, the n
18、ame and telephone number of anappropriate contact person within each Administration.The additional information specified in 5 below is also considered as basic data for the assessmentprocedure.4.3 Observation periodFor the purpose envisaged in 3.2 above, the observation period should be three calend
19、ar months. Forpractical reasons it is advisable that the observation period start at 00.00 UTC on the first day of a quarter of the year,and end at 24.00 UTC on the last day of that quarter.For the purpose envisaged in 3.3 above, Administrations are free to select an observation period which suitsth
20、eir needs.4.4 Exchange of information between terminal AdministrationsAt the end of the observation period, the basic data is recorded on forms, examples of which are shown inAppendices I and II to this Recommendation. Examples of completed forms are given in Appendices III and IV to thisRecommendat
21、ion. Appendices I and III relate to information supplied by the control station, while Appendices II and IVrelate to the sub-control station. Forms, completed with information from the sub-control station should be sent to theAdministration which has control station responsibility.4.5 Elaboration of
22、 resultsIt is the responsibility of the Administration providing the control station to combine the information suppliedby the control and sub-control stations. In practice it is found that this information is often different, and the followingrules should be used to handle such differences:a) if a
23、fault (or unacceptable planned interruption) is reported by both control and sub-control stations, thenthe start of downtime is the earliest time indicated by the control or sub-control station and the end ofdowntime is that recorded by the control station;b) if a fault (or unacceptable planned inte
24、rruption) is reported by only one of the stations, then such a fault isdeemed to have occurred and the corresponding downtime is taken into account.For rules used for combining the additional information specified in 5 below, reference is made to Annex C._2)UTC = Coordinated universal time (UTC is e
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ITUTM10161988ASSESSMENTOFTHESERVICEAVAILABILITYPERFORMANCEOFINTERNATIONALLEASEDCIRCUITS 国际 租用 电路 业务 可用性

链接地址:http://www.mydoc123.com/p-799630.html