ITU-R S 1672-2003 Guidelines to be used in the event of non-compliance with single-entry operational and or additional operational limits in Section II of Article 22 of the Radio R.pdf
《ITU-R S 1672-2003 Guidelines to be used in the event of non-compliance with single-entry operational and or additional operational limits in Section II of Article 22 of the Radio R.pdf》由会员分享,可在线阅读,更多相关《ITU-R S 1672-2003 Guidelines to be used in the event of non-compliance with single-entry operational and or additional operational limits in Section II of Article 22 of the Radio R.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、 Rec. ITU-R S.1672 1 RECOMMENDATION ITU-R S.1672 Guidelines to be used in the event of non-compliance with single-entry operational and/or additional operational limits in Section II of Article 22 of the Radio Regulations (Question ITU-R 231/4) (2003) The ITU Radiocommunication Assembly, considering
2、 a) that WRC-2000 adopted in Article 22 of the Radio Regulations (RR) single-entry operational limits (see RR Tables 22-4A through 22-4C) and single-entry additional operational epfdlimits (see RR Table 22-4A1) applicable to non-GSO FSS systems (space-to-Earth) in certain parts of the frequency rang
3、e 10.7-20.2 GHz to protect GSO systems operating in the same frequency bands; b) that, taking into account RR Nos. 22.5H and 22.5I, wherever the limits referred to in considering a) are exceeded by a non-GSO FSS system to which the limits apply, this constitutes a violation of RR No. 22.2; c) that W
4、RC-2000 identified the need to conduct, as a matter of urgency, the appropriate regulatory studies to develop procedures for application in cases where the power limits referred to in considering a) are exceeded at an operational earth station; d) that the existing provisions in the RR (including th
5、e provisions of Section V of RR Article 15) apply to the resolution of interference, including cases where non-GSO systems exceed the limits referred to in considering a); e) that the RR Article 15 Section VI procedures, which also apply, are general and provide no time lines or specific guidance on
6、 the steps to be taken by administrations or the Radiocommunication Bureau (Bureau); f) that an ITU-R Recommendation containing a set of guidelines in an Annex to it could provide more structure, if need be, for cases where non-GSO systems exceed the limits referred to in considering a); g) that Rec
7、ommendation ITU-R S.1527 contains a methodology for the identification of non-GSO satellites causing interference into an operating GSO earth station; h) that Recommendation ITU-R S.1558 contains methodologies for measuring epfdcaused by a non-GSO space station to verify compliance with operational
8、epfdlimits; j) that Recommendation ITU-R S.1592 contains a methodology to assess compliance of non-GSO FSS satellite systems with the additional operational limits on epfdin RR Article 22; k) that Recommendation ITU-R S.1554 contains a methodology for determining the overall accuracy of epfdmeasurem
9、ents, 2 Rec. ITU-R S.1672 noting a) that under the RR a non-GSO system in the FSS that is subject to the limits in RR Nos. 22.5C, 22.5D and 22.5F and which radiates epfdinto any operating GSO FSS earth station at levels in excess of the operational or additional operational limits given in RR Tables
10、 22-4A, 22-4A1, 22-4B and 22-4C is, unless otherwise agreed between concerned administrations, considered to be in violation of its obligations under RR No. 22.2, recommends 1 that the relevant ITU-R Recommendations referred to in considering g), h), j) and k) should be used by administrations in de
11、termining whether non-GSO systems exceed the limits referred to in considering a); 2 that in addition to applying the relevant provisions of RR Article 15 the set of guidelines given in Annex 1 could be used by administrations, with assistance from the Bureau if necessary, to resolve cases where non
12、-GSO systems exceed the limits referred to in considering a). Annex 1 Guidelines for use in the event of non-compliance with single-entry operational and/or additional operational limits in Section II of RR Article 22 1 In securing the expeditious elimination of epfdinterference from non-GSO systems
13、 in the FSS at levels above the operational epfdlimits given in RR Tables 22-4A, 22-4B and 22-4C and/or the additional operational epfdlimits given in RR Table 22-4A1 (excess epfdinterference), due consideration should be given to all factors involved, including the relevant technical and operationa
14、l factors. 2 Administrations should cooperate in the detection and elimination of excess epfdinterference. 3 Where practicable, and subject to agreement between the administrations concerned, the case of excess epfdinterference may be dealt with directly between their operating organizations. 4 When
15、 a case of interference exceeding an operational epfdlimit to an assignment in a GSO satellite network is established (for example using Recommendation ITU-R S.1558) by the operator of an earth station associated with the GSO satellite network and such excess epfdinterference cannot be accepted by t
16、he affected administration, the affected administration should first attempt to identify the source of the excess epfdinterference. Recommendation ITU-R S.1527 may be employed for this purpose. When a case of interference exceeding an additional operational limit mask to a frequency assignment in a
17、GSO satellite network is identified and such excess epfdinterference cannot be accepted by the affected administration, the affected administration should take steps to compute the excess interference using the published parameters of the non-GSO system concerned. Software as specified in Recommenda
18、tion ITU-R S.1592 may be employed to this end. Rec. ITU-R S.1672 3 The term “affected administration” means the administration on whose territory the receiving earth station associated with the GSO satellite network is located or its designee. 5 In the event that an affected administration referred
19、to in 4 has difficulty in determining the source, or characteristics of excess operational epfdinterference: a) It may send a request for cooperation to any administration which has submitted to the Bureau complete advance publication, coordination, or notification information, as appropriate, for n
20、on-GSO FSS systems with overlapping frequency assignments that have been brought into use in the frequency bands subject to the limits referred to in 1, providing all relevant details in a report of non-compliance with single-entry operational and/or additional operational epfdlimits in Section II o
21、f RR Article 22 utilizing the form provided in Appendix 1 to this Annex. A copy of any such request, including the report of non-compliance with single-entry operational and additional operational epfdlimits in Section II of RR Article 22, may be sent to the Bureau. b) It may request the assistance
22、of the Bureau to identify the administrations referred to in 5 a). It is anticipated that, upon receipt of such a request for assistance, the Bureau would promptly communicate to the requesting administration the list of administrations which have submitted to the Bureau complete advance publication
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ITURS16722003GUIDELINESTOBEUSEDINTHEEVENTOFNONCOMPLIANCEWITHSINGLEENTRYOPERATIONALANDORADDITIONALOPERATIONALLIMITSINSECTIONIIOFARTICLE22OFTHERADIORPDF

链接地址:http://www.mydoc123.com/p-793525.html