ITU-R REPORT M 2115-1-2009 Testing procedures for implementation of dynamic frequency selection《动态频率选择操作的检验程序》.pdf
《ITU-R REPORT M 2115-1-2009 Testing procedures for implementation of dynamic frequency selection《动态频率选择操作的检验程序》.pdf》由会员分享,可在线阅读,更多相关《ITU-R REPORT M 2115-1-2009 Testing procedures for implementation of dynamic frequency selection《动态频率选择操作的检验程序》.pdf(17页珍藏版)》请在麦多课文档分享上搜索。
1、 Report ITU-R M.2115-1(12/2009)Testing procedures for implementation of dynamic frequency selectionM SeriesMobile, radiodetermination, amateurand related satellites servicesii Rep. ITU-R M.2115-1 Foreword The role of the Radiocommunication Sector is to ensure the rational, equitable, efficient and e
2、conomical use of the radio-frequency spectrum by all radiocommunication services, including satellite services, and carry out studies without limit of frequency range on the basis of which Recommendations are adopted. The regulatory and policy functions of the Radiocommunication Sector are performed
3、 by World and Regional Radiocommunication Conferences and Radiocommunication Assemblies supported by Study Groups. Policy on Intellectual Property Right (IPR) ITU-R policy on IPR is described in the Common Patent Policy for ITU-T/ITU-R/ISO/IEC referenced in Annex 1 of Resolution ITU-R 1. Forms to be
4、 used for the submission of patent statements and licensing declarations by patent holders are available from http:/www.itu.int/ITU-R/go/patents/en where the Guidelines for Implementation of the Common Patent Policy for ITU-T/ITU-R/ISO/IEC and the ITU-R patent information database can also be found.
5、 Series of ITU-R Reports (Also available online at http:/www.itu.int/publ/R-REP/en) Series Title BO Satellite delivery BR Recording for production, archival and play-out; film for television BS Broadcasting service (sound) BT Broadcasting service (television) F Fixed service M Mobile, radiodetermina
6、tion, amateur and related satellite services P Radiowave propagation RA Radio astronomy RS Remote sensing systems S Fixed-satellite service SA Space applications and meteorology SF Frequency sharing and coordination between fixed-satellite and fixed service systems SM Spectrum management Note: This
7、ITU-R Report was approved in English by the Study Group under the procedure detailed in Resolution ITU-R 1. Electronic Publication Geneva, 2010 ITU 2010 All rights reserved. No part of this publication may be reproduced, by any means whatsoever, without written permission of ITU. Rep. ITU-R M.2115-1
8、 1 REPORT ITU-R M.2115-1 Testing procedures for implementation of dynamic frequency selection (2007-2009) 1 Introduction Resolution 229 (WRC-03) invites the ITU-R to undertake studies on suitable test methods and procedures for the implementation of dynamic frequency selection (DFS), taking into acc
9、ount practical experience. Currently several administrations and/or standards organizations have developed DFS test methodology. This Report consolidates the DFS test methodology used and findings across several administrations, as shown in several annexes. Information is provided on the test method
10、ologies in place in various administrations and/or regional groups to test compliance with DFS requirements. These procedures may be updated over time, and as technology evolves. As a result, web links are provided (in some cases) to the test methodologies themselves, so that the most up-to-date inf
11、ormation may be obtained. 2 Background The DFS requirements mandated by Resolution 229 (WRC-03) contained in Recommendation ITU-R M.1652 Annex 1 are broken down into three functional areas: detection requirements; operational requirements; response requirements. From a spectrum management view point
12、, testing for these requirements are quite different than the normal field strength or power flux density requirements and a clear description of the methods and process for testing will ease manufacturers ability to show compliance with the administrations rules. Conformance testing provides a mean
13、s to analyse equipment operations against set functional requirements prior to authorization of devices within an administration. To successfully develop conformance test procedures certain descriptions are required to enable manufacturers to develop equipment that will meet or exceed administration
14、 requirements. 3 Equipment setup The test procedures for implementation of DFS in the 5 250-5 350 MHz and 5 470-5 725 MHz bands should include a full description of the equipment used to transmit test waveforms and monitor DFS reactions as prescribed in Recommendation ITU-R M.1652. 2 Rep. ITU-R M.21
15、15-1 4 Test methodology The test procedures for implementation of DFS in the 5 250-5 350 MHz and 5 470-5 725 MHz bands should also include a comprehensive description of the test methodology used for compliance. This should have at a minimum the waveforms to be tested and procedures to be followed d
16、uring testing. 5 Detection requirements There should be a clearly defined detection requirement for each test waveform utilized to ensure that manufacturers and test facilities have a clear understanding of the metric to be applied to each. If multiple requirements will be placed on a data set (i.e.
17、 individual waveform detection requirement with an overall group of waveforms having an additional requirement) these should also be clearly defined. Annex 1 Japan 1 Background In Japan, technical compatibility requirement, including the frequency sharing study and measurement procedures are address
18、ed by the committee formed by the Information and Communications Council (hereinafter “Council”). With regard to RLAN devices in the 5 GHz band, the Council has set up a technical committee on wireless access systems in the 5 GHz band which has undertaken the role of studying technical requirements
19、for such RLAN devices. Based on the Council Report, MIC (Ministry of Internal Affairs and Communications) regulates technical requirements to facilitate development of type acceptance testing procedures. 2 Scope DFS requirements were institutionalized in the 5 250-5 350 MHz band in May 2005 and 5 47
20、0-5 725 MHz band in January 2007. On the same day, the notification of WAS test procedure was published. The Association of Radio Industries and Businesses (ARIB the private standards organization in Japan) published the revision of ARIB Standard T-71 based on IEEE 802.11 CSMA/CA standards and incor
21、porates regulatory requirements including DFS functionality in Japan. DFS requirements in Japan are composed of those given in Recommendation ITU-R M.1652 Annex 1, harmonized international requirements and those for protecting Japans specific radars. 3 Procedures The DFS capability can be verified t
22、hrough the examination of detection probability. It must be repeated many times to obtain accurate test results. It is time consuming and may reflect to the cost impact to WAS devices. Therefore, Japan adopted the method of testing procedures to enable relatively more accurate pass/fail decision und
23、er relatively smaller cycle of testing. These Rep. ITU-R M.2115-1 3 considerations are introduced in following attachment for reference. To achieve further reduction of testing items which conform to DFS function to various kinds of radars, similar radar types are grouped, and random sample testing
24、method within grouped radars was adopted. The latest version of mandated DFS requirements and test procedures in Japan can be obtained from MIC publications Download Area Website (http:/www.tele.soumu.go.jp/e/equ/tech/5ghz.htm). Appendix 1 to Annex 1 An example of DFS test methods and calculation re
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ITURREPORTM211512009TESTINGPROCEDURESFORIMPLEMENTATIONOFDYNAMICFREQUENCYSELECTION 动态 频率 选择 操作 检验 程序 PDF

链接地址:http://www.mydoc123.com/p-792993.html