GMW GMW16579-2012 Material and Process Testing Requirements for Press Hardened Steel and Stamping Suppliers Issue 2 English.pdf
《GMW GMW16579-2012 Material and Process Testing Requirements for Press Hardened Steel and Stamping Suppliers Issue 2 English.pdf》由会员分享,可在线阅读,更多相关《GMW GMW16579-2012 Material and Process Testing Requirements for Press Hardened Steel and Stamping Suppliers Issue 2 English.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、 WORLDWIDE ENGINEERING STANDARDS Material Specification GMW16579 Material and Process Testing Requirements for Press Hardened Steel and Stamping Suppliers Copyright 2012 General Motors Company All Rights Reserved May 2012 Originating Department: North American Engineering Standards Page 1 of 7 1 Sco
2、pe This document describes the minimum process and internal testing requirements for producers of hot stamped parts. 1.1 Material Description. Hot stamping, or press hardening as it is also known, utilizes a steel of high hardenability such as 22MnB5 that is heated to convert the microstructure to a
3、ustenite followed by stamping in a water cooled die to produce the proper part shape and to simultaneously quench the steel to create a martensite rich microstructure. Parts produced to this specification will have a uniform hardness and a microstructure consisting of essentially 100% tempered marte
4、nsite along with small amounts of bainite. 1.2 Symbols. Not applicable. 1.3 Typical Applications. Typical parts covered by this specification are those that require extremely high strength and are generally critical to passenger safety, side impact and provide passenger protection in the case of veh
5、icle roll over. These parts are found throughout the body structure and closures, with typical applications including door beams, B Pillar reinforcements, floor reinforcements and upper body roof rails. 2 References Note: Only the latest approved standards are applicable unless otherwise specified.
6、2.1 External Standards/Specifications. AIAG CQI-9 ASTM E140 ASTM E-8 2.2 GM Standards/Specifications. GMW3059 GMW14400 GMW3335 2.3 Additional References. Best Practice BODYSTR-33. The supplier shall work with the GM responsible engineer to comprehend this requirement. Statement of Requirements (SOR)
7、 Appendix N. TMC003 Material Safety Data Sheet guidance documents (available at ). 3 Requirements 3.1 Requirements on Test Specimens. Not applicable. 3.2 Marking. All parts shall be marked as shown in the SOR Appendix N and the Best Practice BODYSTR-33. 3.3 General Requirements. All sheet parts prod
8、uced to this specification shall be manufactured by approved suppliers to GM and will be shown as being approved to GMW14400. Approved suppliers are listed in the MATSPC system and can be provided by your GM Global Purchasing Supply Chain buyer. A change in steel suppliers is considered a significan
9、t process change and the stamping supplier will be required to update their Production Part Approval Process (PPAP) status before production begins. 3.3.1 GM must be notified prior to any steel supplier change. If a zinc based coating is specified (pure zinc or a zinc alloy) the source that produces
10、 the stamping is required to test and re-qualify to a PPAP Level 3. The stamping supplier will consult with Product Engineering and Materials Engineering when evaluating potential process and supplier changes. Copyright General Motors Company Provided by IHS under license with General Motors Company
11、Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW16579 Copyright 2012 General Motors Company All Rights Reserved May 2012 Page 2 of 7 3.3.2 Suppliers of hot stamped parts to GM are required to verify that incoming steels meet al
12、l specified material requirements. This shall include, but not be limited to: steel thickness, mechanical properties after heat treatment, coating weight and coating type (for coated products), bend test (parallel and transverse to rolling direction) and any other requirements determined by GM and/o
13、r the released part drawing/math data. The supplier is responsible to ensure that the steel, the heat treatment and stamping process, die cooling, post form trimming, etc., are capable of producing parts that meet all specified requirements. 3.4 Supplier Audits. Suppliers shall develop a Heat Treatm
14、ent Assessment Plan consistent with the requirements of Automotive Industry Action Group (AIAG) standard CQI-9. General Motors shall perform assessment audits to ensure suppliers are in conformance to these requirements. Completion of the CQI-9 audit is required before a hot stamper can be placed on
15、 the GM Approved Source List and supply parts to General Motors. Failure to be in compliance with the CQI-9 Audit standards shall result in removal from the opportunity to bid on future business and may result in the loss of current business. 3.5 Initial Part Verification Requirements. Suppliers sha
16、ll develop a verification plan for all parts they are awarded. This verification plan is to be developed before parts are used on any vehicle builds unless authorized by GM and the releasing engineer. This verification plan shall include control of initial production until the process is determined
17、to be in control by GM. Once the process is determined to be in control, a process control plan must be developed to ensure lot to lot consistency of all parts supplied to GM. Suppliers shall work with GM to determine the required testing frequency of each test, however, it is not required that each
18、 test be performed on every lot of material sent to GM. This testing shall include, at a minimum; mechanical properties, hardness (both Rockwell and Vickers microhardness as appropriate), part thickness profile, microstructure, coating thickness and thickness of coating alloys. 3.6 Supplier On-Site
19、Testing Requirements. Suppliers providing Press Hardened Steel (PHS) parts to General Motors are required to have on-site testing capability to perform part evaluations to ensure conformance to specification requirements and to monitor quality of parts as they are produced. The laboratory shall have
20、 operator(s) that have adequate training to perform such tests and operators shall be available to perform testing consistent with their quality plans during all shifts where parts are being produced. At a minimum, suppliers are required to be able to perform tests 3.6.1 thru 3.6.5. 3.6.1 Microstruc
21、tural Evaluation. Suppliers shall have the proper equipment to section, mount, polish, etch and microscopically examine samples with a metallurgical microscope to determine the phases present in test samples. 3.6.2 Hardness Testing. Suppliers shall have the capability to perform Rockwell and Vickers
22、 microhardness hardness testing. 3.6.3 Mechanical Properties. Suppliers shall have the capability to perform mechanical property testing with full size and sub size tensile bars following GMW3335 tensile testing requirements. 3.6.4 Photomicrographs. Photomicrographs of microstructures and microhardn
23、ess across sample parts. 3.6.5 Coating and Surface. Thickness testing, including part thickness, coating thickness and thickness of each alloy coating layer (coated parts), including the steel/coating interface layer. On uncoated steels, decarburization shall also be measured and reported. 3.7 Verif
24、ication Test Requirements. The supplier shall perform the following tests on production representative parts in order to validate their process. The sampling plan and number of parts to be tested will be established by Supplier Quality. The supplier shall keep samples from the bend test for examinat
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMWGMW165792012MATERIALANDPROCESSTESTINGREQUIREMENTSFORPRESSHARDENEDSTEELANDSTAMPINGSUPPLIERSISSUE2ENGLISHPDF

链接地址:http://www.mydoc123.com/p-757792.html