GMKOREA EDS-T-7416-2008 RUBBER HOSE TEST PROCEDURE.pdf
《GMKOREA EDS-T-7416-2008 RUBBER HOSE TEST PROCEDURE.pdf》由会员分享,可在线阅读,更多相关《GMKOREA EDS-T-7416-2008 RUBBER HOSE TEST PROCEDURE.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、GM DAEWOO Auto & Technology EDS Engineering, GM DAEWOO Auto & Technology Standards RUBBER HOSE TEST PROCEDURE Do Not Use on New Programs. Being Replaced by GMW14329 EDS-T-7416 ISSUED DATE: 1987. 09. 18 REVISED DATE: 2008. 10. 23 VERSION: 4 (Superceded) EDS-T-7416RUBBER HOSE TEST PROCEDURE PAGE: 1/5
2、ISSUED DATE: 1987. 09. 18 REVISED DATE: 2008. 10. 23 VERSION: 4 GM DAEWOO Auto & Technology Note: This standard may be applied only for current project (incl. T250 Program). It is Superceded for all future projects and replaced by GMW14329. 1. PURPOSE This standard specifies the method of durability
3、 test of water hose used in a cooling system of an internal combustion engine and a heating system of passenger cars. 2. TEST APPARATUS 2.1. Heating chamber It shall have a volume of about lm3 and heating capacity of 13kw. It shall be furnished with a temperature control (range +200, accuracy 0.1%)
4、and temperature sensor to keep the temperature in the chamber up to +200. 2.2. Air circulating ventilator A ventilator shall be installed on the top of chamber and an air duct shall be installed at the back of the chamber to inhale the air at the chamber top and to feed it to the chamber bottom. 2.3
5、. Vibrating device A geared motor shall be installed on the chamber top, and a chain driving system shall be connected to the chamber back and an eccentric vibrator to the chamber inside to apply vibration of frequency of 200+/-20 rpm to the sample through a circle of 20mm diameter. 2.4. Reservoir t
6、ank A reservoir tank shall mix water and antifreeze 50 to 50 in a 30N of volume and shall include motor & pump to circulate cooling water through the line. 2.5. Pressure tank A piston type pressure tank shall be able to apply pressure on line by air by forming a closed circuit in circulating line to
7、 force cooling water circulate in pump. 2.6. Pressure gage Two pressure gages with range of 10 bar shall be installed at each inlet and outlet of a sample. 2.7. Level gage & solenoid valve A level sight gage to continuously monitor the circulating and breathing conditions of cooling water in the lin
8、e pumped by a water pump and 3 solenoid valves to make a sample line into a closed circuit in the complete circulating condition shall be installed. 3. TEST PREPARATION EDS-T-7416RUBBER HOSE TEST PROCEDURE PAGE: 2/5 ISSUED DATE: 1987. 09. 18 REVISED DATE: 2008. 10. 23 VERSION: 4 GM DAEWOO Auto & Tec
9、hnology 3.1. The hose shall be attached to the jig & fixture with clamps without being extended or compressed. 3.2. Test length 3.2.1. Cooling water hose (For Radiator) (1) The connected test sample shall have the same length and condition as in the vehicle condition. (2) A 3 way cooling water hose
10、shall be installed in the vehicle condition and one side of the branch line shall be sealed by a dummy plug and tied with a strip not to sway. 3.2.2. Heater hose (including a pre-heating hose of carburetor) (1) In case of a straight hose with same inside diameter and different lengths, it shall be t
11、ested by being cut into 200mm pieces. Schematic No. 1 Test set up for straight hoses Test length 200mm (2) In case of a hose bow, it shall be tested with one side being straight by more than 60mm and the other 20mm respectively centering on the center of curvature of bowed portion. Schematic No. 2 T
12、est set up for hose bows EDS-T-7416RUBBER HOSE TEST PROCEDURE PAGE: 3/5 ISSUED DATE: 1987. 09. 18 REVISED DATE: 2008. 10. 23 VERSION: 4 GM DAEWOO Auto & Technology (3) In case of a hose bow other than in (2), i.e., when there are several bows or the length of straight part does not meet 60mm/200mm c
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMKOREAEDST74162008RUBBERHOSETESTPROCEDUREPDF

链接地址:http://www.mydoc123.com/p-757281.html