GMKOREA EDS-T-5245-2011 Jet Horn High-Pressure Headlamp Washing Plant.pdf
《GMKOREA EDS-T-5245-2011 Jet Horn High-Pressure Headlamp Washing Plant.pdf》由会员分享,可在线阅读,更多相关《GMKOREA EDS-T-5245-2011 Jet Horn High-Pressure Headlamp Washing Plant.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、 ENGINEERING STANDARDS General Specification SUPERCEDED EDS-T-5245 Jet Horn High-Pressure Headlamp Washing Plant This standard may be applied only for current projects. It is Superceded for all future projects and replaced by GMW16642. Copyright 2011 General Motors Company All Rights Reserved Septem
2、ber 2011 Originating Department: GM Korea Engineering Standards Page 1 of 3 Version : 3 1 Introduction Note: Nothing in this standard supersedes applicable laws and regulations. Note: In the event of conflict between the Korean and English language, the Korean language shall take precedence. 1.1 Pur
3、pose and Scope. This test specification defines the test conditions for the jet horn of the high - pressure headlamp washing plant. 2 References Note: Only the latest approved standards are applicable unless otherwise specified. 2.1 External Standards/Specifications. SMS 2983E 2.2 GM Standards/Speci
4、fications. EDS-T-7408 EDS-T-7410 EDS-T-7668 EDS-T-7669 EDS-T-7670 EDS-T-7671 EDS-T-7672 EDS-T-7673 EDS-T-7677 EDS-T-7678 GMW3059 2.3 Additional References. None 3 Test Preparation and Evaluation 3.1 Resources. 3.1.1 Calibration. The test facilities and equipment shall be in good working order and sh
5、all have a valid calibration label. 3.1.2 Alternatives. Alternative test facilities and equipment may also be used. However, all measuring variables as specified in this standard shall be determined correctly with respect to their physical definition. 3.1.3 Equipment. For the performance of the rele
6、ase test following devices and equipments are require: 3.1.3.1 Pump (to 600 KPa), Hoses, Pressure Gauge (to 600 KPa) stopwatch, Test Beaker. 3.1.3.2 Ex-protected temperature cabinet and return - air furnace. (-40) E to +120 E ). 3.1.3.3 Serial high - pressure pump, power supply, switch clock with nu
7、merator. 3.1.3.4 Agitator for the test of the vibrating strength. 3.1.3.5 Material - testing instrument to EDS-T-7408, EDS-T-7410, EDS-T-7673, EDS-T-7669, EDS-T-7677, EDS-T-7670, EDS-T-7671, EDS-T-7672, EDS-T-7678, and EDS-T-7668. 3.1.3.6 All devices and instruments must be so constructed that their
8、 accuracy is better than the tolerances allowed for the test. 3.1.4 Test Piece. For the performance of a test according to this specification 12 pairs of sample (on the right and left) are requisite, which are to be delivered with a works test certificate. 3.2 Conditions. GM KOREA ENGINEERING STANDA
9、RDS EDS-T-5245 Copyright 2011 General Motors Company All Rights Reserved September 2011 Page 2 of 3 Version : 3 3.2.1 Test Conditions. Deviations from the requirements of this standard shall have been agreed upon. Such requirements shall be specified on component drawings, test certificates, reports
10、, etc. 3.3 Safety. This standard may involve hazardous materials, operations, and equipment. This standard does not propose to address all the safety problems associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and deter
11、mine the applicability of regulatory limitations prior to use. 3.4 Documentation. Samples of components or material released to this standard shall be tested for conformity with the requirements of this standard and approved by the responsible GM Department prior to the start of delivery of producti
12、on level components or materials. Any change to the component or material, e.g., design, function, properties, manufacturing process and/or location of manufacture requires a new release of the product. It is the sole responsibility of the supplier to provide the customer, unsolicited, with document
13、ation of any change or modification to the product/process, and to apply for a new release. If not otherwise agreed to, the entire verification test shall be repeated and documented by the supplier prior to start of delivery of the modified or changed product. In some cases, a shorter test can be ag
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMKOREAEDST52452011JETHORNHIGHPRESSUREHEADLAMPWASHINGPLANTPDF

链接地址:http://www.mydoc123.com/p-757134.html