1、Designation: D 7186 05Standard Practice forQuality Assurance Observation of Roof Construction andRepair1This standard is issued under the fixed designation D 7186; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last re
2、vision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers procedures for performing visualmonitoring of roofing construction to:1.1.1 Establish guidelines for qu
3、ality assurance observationpractices; and1.1.2 Define the role and responsibilities of the qualityassurance observer.1.2 This practice pertains to daily, full-time, quality assur-ance observation of roofing projects. This practice is applicableto new construction or reroofing projects involving the
4、instal-lation of a new roof system, the removal of existing roofing andinstallation of a new roof system, or recovering an existingroof. It is also applicable to roofing projects involving repairsor scheduled maintenance to an existing roof.1.3 This practice contains the following information:1.3.1
5、The objectives of the quality assurance process;1.3.2 The responsibilities and qualifications of the individu-al(s) involved in the observations of the roof construction orrepair;1.3.3 Identification and use of the basic tools or equipmentrequired for the visual roof observation process; and1.3.4 Mo
6、nitoring, recording, and reporting procedures.1.4 This practice does not address practices of roof inves-tigation, condition reporting, or analysis of preexisting roofs.1.5 This pracitce does not pertain to quality control pro-cesses or techniques performed by persons or entities repre-senting or un
7、der contract to the roofing contractor. The qualitycontrol process is separate and distinct from the qualityassurance observation process.1.6 Assessment of safe work practices or safety monitoringprocedures followed by the contractor are outside the scope ofthis practice.1.7 This standard does not p
8、urport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2
9、D 1079 Terminology Relating to Roofing, Waterproofing,and Bituminous MaterialsE 631 Terminology of Building Constructions2.2 Other Documents:The Contract DocumentsSpecification Literature or Roof System Installation Re-quirements, supplied by the applicable manufacturer,supplier, or distributor of t
10、he roof system materialARMA/NRCA/SPRI Repair Manual for Low-Slope Mem-brane Roof Systems3,4,5ARMA/NRCA Quality Control Guidelines for the Applica-tion of Built-Up Roofing3,4ARMA/NRCA Quality Control Guidelines for the Applica-tion of Polymer Modified Bitumen Roofing3,4NRCA/SPRI Quality Control Guide
11、lines for theApplicationof Thermoset Single-Ply Roof Membranes4,5NRCA/SPFA Quality Control Guidelines for the Applica-tion of Sprayed Polyurethane Foam Roofing4,6NRCA Roofing 5.3.2 Preexisting property damages, or property or materialdamages that occur during the roof construction process;5.3.3 The
12、condition of the substrate, and substrate prepara-tion, repair, or replacement procedures;5.3.4 The installation and attachment of any base sheets,including the type of fastener or adhesive used, the fasteningpattern and spacing;5.3.5 The installation and attachment of any vapor retardersor air barr
13、iers, including the type of fastener or adhesive used,the fastening pattern and spacing;5.3.6 The installation and attachment of the insulationlayer(s), recover or coverboard materials, including the type offastener or adhesive used, the fastening pattern and spacing;5.3.7 The installation and attac
14、hment of the roof covering orrepair materials which comprise the finished roof system,including the type of fastener or adhesive used, the fasteningpattern and spacing, as well as specific material quantities,temperatures, and measurements appropriate to the type of roofsystem under construction;5.3
15、.8 The installation and detailing of the roof systemflashings at perimeter and roof penetration locations;5.3.9 The installation and detailing of the sheet metalroofing accessories such as, but not limited to counterflashings,coping caps, joint covers, and edge and fascia metals;5.3.10 The installat
16、ion of roof surfacings or coatings;5.3.11 The installation of temporary weather seals at the endof the work day or prior to inclement weather;5.3.12 The installation of any other roof components speci-fied in the project specifications;5.3.13 The weather conditions that occur during the roofassembly
17、 installation;5.3.14 The crew size and foreman, and type of work beingperformed on a given day; and5.3.15 All visitors to the roof and their length of stay.6. Qualifications of the Quality Assurance Observer6.1 Significance of Qualifications:6.1.1 It is necessary that the person(s) performing qualit
18、yobservation of the construction process understand the projectspecifications and the specified roof system. Knowledge ofindustry-accepted good roofing practices is critical to thesuccess of the quality assurance observation process;6.1.2 A record of experience and training shall be main-tained by t
19、he QAO and submitted to the project file. Anoptional, sample form is located in Attachment A;6.1.3 A thorough understanding of the contract documents,specifically the project specifications, construction detail draw-ings, pre-bid and pre-construction conference minutes, and anyaddenda to the roofing
20、 specifications is required; and6.1.4 A thorough understanding of the type of roof systemspecified including knowledge of the manufacturers require-ments is required.6.2 Technical Qualifications of the QAO can be achieved byeither 6.2.1 or 6.2.2:6.2.1 Completion of specialized training or certificat
21、ion inQuality Assurance observation. The training or certificationprogram shall be specific to roofing quality assurance obser-vation and shall be administered by an industry recognizedorganization.6.2.2 Completion of a roof system application programprovided by the roof system manufacturer specifie
22、d.6.2.3 In lieu of the requirements in 6.2.1 and 6.2.2 by either:6.2.3.1 Completion of a minimum of 400 h of experienceperforming quality assurance observation of roofing construc-tion, or 400 h of experience in technical services with roofsystem manufacturers and a minimum of 2000 h of tradeexperie
23、nce in roof construction.6.2.3.2 Completion of a minimum of 400 h of experience inthe generic type of roof system specified either performingD7186052quality assurance observation or roof construction, or technicalservices for a roof system manufacturers. For this purpose, thegeneric roof type catego
24、ries are defined as: Built-Up Roofing,Polymer-Modified Bitumen, Thermoplastic Single-Ply, Ther-moset Single-Ply, Sprayed Polyurethane Foam Based Roofing,Structural Low-Slope Metal Roofing, Steep Slope Roofing,including but not limited to asphalt shingles, slate, tile, ormetal.7. Required Project Doc
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD71862005STANDARDPRACTICEFORQUALITYASSURANCEOBSERVATIONOFROOFCONSTRUCTIONANDREPAIR 屋顶 建造 修理 质量保证

链接地址:http://www.mydoc123.com/p-524755.html