1、22 SUBCHAPTER BPROCEDURAL RULES PART 11GENERAL RULEMAKING PROCEDURES Subpart ARulemaking Procedures Sec. 11.1 To what does this part apply? DEFINITION OF TERMS 11.3 What is an advance notice of proposed rulemaking? 11.5 What is a notice of proposed rule-making? 11.7 What is a supplemental notice of
2、pro-posed rulemaking? 11.9 What is a final rule? 11.11 What is a final rule with request for comments? 11.13 What is a direct final rule? 11.15 What is a petition for exemption? 11.17 What is a petition for rulemaking? 11.19 What is a special condition? GENERAL 11.21 What are the most common kinds o
3、f rulemaking actions for which FAA fol-lows the Administrative Procedure Act? 11.23 Does FAA follow the same procedures in issuing all types of rules? 11.25 How does FAA issue rules? 11.27 Are there other ways FAA collects specific rulemaking recommendations before we issue an NPRM? 11.29 May FAA ch
4、ange its regulations with-out first issuing an ANPRM or NPRM? 11.31 How does FAA process direct final rules? 11.33 How can I track FAAs rulemaking ac-tivities? 11.35 Does FAA include sensitive security information and proprietary information in the Federal Docket Management Sys-tem (FDMS)? 11.37 Whe
5、re can I find information about an Airworthiness Directive, an airspace des-ignation, or a petition handled in a re-gion? 11.38 What public comment procedures does FAA follow for Special Conditions? 11.39 How may I participate in FAAs rule-making process? 11.40 Can I get more information about a rul
6、emaking? WRITTEN COMMENTS 11.41 Who may file comments? 11.43 What information must I put in my written comments? 11.45 Where and when do I file my com-ments? 11.47 May I ask for more time to file my comments? PUBLIC MEETINGS AND OTHER PROCEEDINGS 11.51 May I request that FAA hold a public meeting on
7、 a rulemaking action? 11.53 What takes place at a public meeting? PETITIONS FOR RULEMAKING AND FOR EXEMPTIONS 11.61 May I ask FAA to adopt, amend, or re-peal a regulation, or grant relief from the requirements of a current regula-tion? 11.63 How and to whom do I submit my peti-tion for rulemaking or
8、 petition for ex-emption? 11.71 What information must I include in my petition for rulemaking? 11.73 How does FAA process petitions for rulemaking? 11.75 Does FAA invite public comment on petitions for rulemaking? 11.77 Is there any additional information I must include in my petition for desig-nati
9、ng airspace? 11.81 What information must I include in my petition for an exemption? 11.83 How can I operate under an exemption outside the United States? 11.85 Does FAA invite public comment on petitions for exemption? 11.87 Are there circumstances in which FAA may decide not to publish a summary of
10、 my petition for exemption? 11.89 How much time do I have to submit comments to FAA on a petition for ex-emption? 11.91 How does FAA inform me of its deci-sion on my petition for exemption? 11.101 May I ask FAA to reconsider my peti-tion for rulemaking or petition for ex-emption if it is denied? 11.
11、103 What exemption relief may be avail-able to federal, state, and local govern-ments when operating aircraft that are not public aircraft? Subpart BPaperwork Reduction Act Control Numbers 11.201 Office of Management and Budget (OMB) control numbers assigned under the Paperwork Reduction Act. APPEND
12、IX 1 TO PART 11ORAL COMMUNICA-TIONS WITH THE PUBLIC DURING RULE-MAKING AUTHORITY: 49 U.S.C. 106(g), 40101, 40103, 40105, 40109, 40113, 44110, 44502, 4470144702, 44711, and 46102. SOURCE: Docket No. 19996622, 65 FR 50863, Aug. 21, 2000, unless otherwise noted. EDITORIAL NOTE: Nomenclature changes to
13、part 11 appear at 61 FR 18052, April 24, 1996. VerDate Mar2010 14:10 Mar 01, 2011 Jkt 223043 PO 00000 Frm 00032 Fmt 8010 Sfmt 8010 Y:SGML223043.XXX 223043wwoods2 on DSK1DXX6B1PROD with CFRProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-23 Federal Avi
14、ation Administration, DOT 11.19 Subpart ARulemaking Procedures 11.1 To what does this part apply? This part applies to the issuance, amendment, and repeal of any regula-tion for which FAA (we) follows pub-lic rulemaking procedures under the Administrative Procedure Act (APA) (5 U.S.C. 553). DEFINITI
15、ON OF TERMS 11.3 What is an advance notice of proposed rulemaking? An advance notice of proposed rule-making (ANPRM) tells the public that FAA is considering an area for rule-making and requests written com-ments on the appropriate scope of the rulemaking or on specific topics. An advance notice of
16、proposed rulemaking may or may not include the text of po-tential changes to a regulation. 11.5 What is a notice of proposed rulemaking? A notice of proposed rulemaking (NPRM) proposes FAAs specific regu-latory changes for public comment and contains supporting information. It in-cludes proposed reg
17、ulatory text. 11.7 What is a supplemental notice of proposed rulemaking? On occasion, FAA may decide that it needs more information on an issue, or that we should take a different ap-proach than we proposed. Also, we may want to follow a commenters sugges-tion that goes beyond the scope of the origi
18、nal proposed rule. In these cases, FAA may issue a supplemental notice of proposed rulemaking (SNPRM) to give the public an opportunity to com-ment further or to give us more infor-mation. 11.9 What is a final rule? A final rule sets out new or revised requirements and their effective date. It also
19、may remove requirements. When preceded by an NPRM, a final rule will also identify significant sub-stantive issues raised by commenters in response to the NPRM and will give the agencys response. 11.11 What is a final rule with re-quest for comments? A final rule with request for com-ment is a rule
20、that the FAA issues in final (with an effective date) that in-vites public comment on the rule. We usually do this when we have not first issued an ANPRM or NPRM, because we have found that doing so would be impracticable, unnecessary, or con-trary to the public interest. We give our reasons for our
21、 determination in the preamble. The comment period often ends after the effective date of the rule. A final rule not preceded by an ANPRM or NPRM is commonly called an immediately adopted final rule. We invite comments on these rules only if we think that we will re-ceive useful information. For exa
22、mple, we would not invite comments when we are just making an editorial clarifica-tion or correction. 11.13 What is a direct final rule? A direct final rule is a type of final rule with request for comments. Our reason for issuing a direct final rule without an NPRM is that we would not expect to re
23、ceive any adverse com-ments, and so an NPRM is unnecessary. However, to be certain that we are cor-rect, we set the comment period to end before the effective date. If we receive an adverse comment or notice of intent to file an adverse comment, we then withdraw the final rule before it be-comes eff
24、ective and may issue an NPRM. 11.15 What is a petition for exemp-tion? A petition for exemption is a request to FAA by an individual or entity ask-ing for relief from the requirements of a current regulation. 11.17 What is a petition for rule-making? A petition for rulemaking is a re-quest to FAA by
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FAA14CFRPART112011GENERALRULEMAKINGPROCEDURES 一般 立法 规程 PDF

链接地址:http://www.mydoc123.com/p-744427.html