ETSI TR 118 501-2015 oneM2M Use Case collection (V1 0 0)《oneM2M使用案例收集 (V1 0 0)》.pdf
《ETSI TR 118 501-2015 oneM2M Use Case collection (V1 0 0)《oneM2M使用案例收集 (V1 0 0)》.pdf》由会员分享,可在线阅读,更多相关《ETSI TR 118 501-2015 oneM2M Use Case collection (V1 0 0)《oneM2M使用案例收集 (V1 0 0)》.pdf(149页珍藏版)》请在麦多课文档分享上搜索。
1、 ETSI TR 118 501 V1.0.0 (2015-05) oneM2M Use Case collection TECHNICAL REPORT ETSI ETSI TR 118 501 V1.0.0 (2015-05) 2 Reference DTR/oneM2M-000001 Keywords IoT, M2M, use case ETSI 650 Route des Lucioles F-06921 Sophia Antipolis Cedex - FRANCE Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16 Siret N 348
2、 623 562 00017 - NAF 742 C Association but non lucratif enregistre la Sous-Prfecture de Grasse (06) N 7803/88 Important notice The present document can be downloaded from: http:/www.etsi.org/standards-search The present document may be made available in electronic versions and/or in print. The conte
3、nt of any electronic and/or print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any existing or perceived difference in contents between such versions and/or in print, the only prevailing document is the print of the Portable Docum
4、ent Format (PDF) version kept on a specific network drive within ETSI Secretariat. Users of the present document should be aware that the document may be subject to revision or change of status. Information on the current status of this and other ETSI documents is available at http:/portal.etsi.org/
5、tb/status/status.asp If you find errors in the present document, please send your comment to one of the following services: https:/portal.etsi.org/People/CommiteeSupportStaff.aspx Copyright Notification No part may be reproduced or utilized in any form or by any means, electronic or mechanical, incl
6、uding photocopying and microfilm except as authorized by written permission of ETSI. The content of the PDF version shall not be modified without the written authorization of ETSI. The copyright and the foregoing restriction extend to reproduction in all media. European Telecommunications Standards
7、Institute 2015. All rights reserved. DECTTM, PLUGTESTSTM, UMTSTMand the ETSI logo are Trade Marks of ETSI registered for the benefit of its Members. 3GPPTM and LTE are Trade Marks of ETSI registered for the benefit of its Members and of the 3GPP Organizational Partners. GSM and the GSM logo are Trad
8、e Marks registered and owned by the GSM Association. ETSI ETSI TR 118 501 V1.0.0 (2015-05) 3 Contents Intellectual Property Rights 10g3Foreword . 10g31 Scope 11g32 References 12g32.1 Normative references . 12g32.2 Informative references 12g33 Abbreviations . 13g34 Conventions 15g35 Energy Use Cases
9、. 15g35.1 Wide area Energy related measurement/control system for advanced transmission and distribution automation 15g35.1.1 Description 15g35.1.2 Source . 16g35.1.3 Actors 16g35.1.4 Pre-conditions . 16g35.1.5 Triggers . 16g35.1.6 Normal Flow . 17g35.1.7 Alternative flow 18g35.1.8 Post-conditions .
10、 18g35.1.9 High Level Illustration 19g35.1.10 Potential Requirements . 19g35.2 Analytics Use Case for M2M . 20g35.2.1 Description 20g35.2.2 Source . 22g35.2.3 Actors 22g35.2.4 Pre-conditions . 22g35.2.5 Triggers . 22g35.2.6 Normal Flow . 23g35.2.7 Alternative Flow 1 23g35.2.8 Post-conditions . 23g35
11、.2.9 High Level Illustration 23g35.2.9.1 Concrete Example Oil and Gas . 24g35.2.10 Potential requirements 25g35.3 Smart Meter Reading 26g35.3.1 Description 26g35.3.2 Source . 26g35.3.3 Actors 26g35.3.4 Pre-conditions . 26g35.3.5 Triggers . 26g35.3.6 Normal Flow . 26g35.3.7 Alternative flow 29g35.3.8
12、 Post-conditions . 29g35.3.9 High Level Illustration 29g35.3.10 Potential Requirements . 29g35.4 Environmental Monitoring of Remote Locations to Determine Hydropower 29g35.4.1 Description 29g35.4.2 Source . 30g35.4.3 Actors 30g35.4.4 Pre-conditions . 30g35.4.5 Triggers . 30g35.4.6 Normal Flow . 31g3
13、5.4.7 Alternative flow 31g35.4.8 Post-conditions . 31g35.4.9 High Level Illustration 32g35.4.10 Potential Requirements . 32g3ETSI ETSI TR 118 501 V1.0.0 (2015-05) 4 5.5 Oil and Gas Pipeline Cellular/Satellite Gateway 32g35.5.1 Description 32g35.5.2 Source . 33g35.5.3 Actors 33g35.5.4 Pre-conditions
14、. 33g35.5.5 Triggers . 33g35.5.6 Normal Flow . 33g35.5.7 Alternative flow 34g35.5.8 Post-conditions . 37g35.5.9 High Level Illustration 37g35.5.10 Potential Requirements . 38g36 Enterprise Use Cases 40g36.1 Smart Building . 40g36.1.1 Description 40g36.1.2 Source . 40g36.1.3 Actors 40g36.1.4 Pre-cond
15、itions . 40g36.1.5 Triggers . 40g36.1.6 Normal Flow . 41g36.1.7 Alternative flow 42g36.1.8 Post-conditions . 42g36.1.9 High Level Illustration 42g36.1.10 Potential Requirements . 42g37 Healthcare Use Cases . 43g37.1 M2M Healthcare Gateway . 43g37.1.1 Description 43g37.1.2 Source . 43g37.1.3 Actors 4
16、3g37.1.4 Pre-conditions . 43g37.1.5 Triggers . 44g37.1.6 Normal Flow . 44g37.1.7 Alternative flow 46g37.1.8 Post-conditions . 51g37.1.9 High Level Illustration 52g37.1.10 Potential Requirements . 54g37.2 Use Case on Wellness Services 55g37.2.1 Description 55g37.2.2 Source . 56g37.2.3 Actors 56g37.2.
17、4 Pre-conditions . 56g37.2.5 Triggers . 56g37.2.6 Normal Flow . 56g37.2.7 Alternative flow 57g37.2.8 Post-conditions . 58g37.2.9 High Level Illustration 58g37.2.10 Potential Requirements . 58g37.3 Secure remote patient care and monitoring 58g37.3.1 Description 58g37.3.2 Source . 60g37.3.3 Actors 60g
18、37.3.4 Pre-conditions . 61g37.3.5 Triggers . 61g37.3.6 Normal Flow . 61g37.3.7 Alternative flow 62g37.3.7.1 Alternative flow No 1 62g37.3.7.2 Alternative flow No 2 62g37.3.7.3 Alternative flow No 3 63g37.3.8 Post-conditions . 63g37.3.8.1 Normal flow 63g37.3.8.2 Alternative flow No 3 63g3ETSI ETSI TR
19、 118 501 V1.0.0 (2015-05) 5 7.3.9 High Level Illustration 63g37.3.10 Potential requirements 63g38 Public Services Use Cases 64g38.1 Street Light Automation . 64g38.1.1 Description 64g38.1.2 Source . 65g38.1.3 Actors 65g38.1.4 Pre-conditions . 65g38.1.5 Triggers . 65g38.1.6 Normal Flow . 65g38.1.7 Al
20、ternative flow 69g38.1.8 Post-conditions . 69g38.1.9 High Level Illustration 70g38.1.10 Potential Requirements . 70g38.2 Use Case on Devices, Virtual Devices and Things 71g38.2.1 Description 71g38.2.2 Source . 72g38.2.3 Actors 72g38.2.4 Pre-conditions . 72g38.2.5 Triggers . 72g38.2.6 Normal Flow . 7
21、2g38.2.7 Alternative flow 73g38.2.8 Post-conditions . 73g38.2.9 High Level Illustration 73g38.2.10 Potential Requirements . 73g38.3 Car/Bicycle Sharing Services . 73g38.3.1 Description 73g38.3.2 Source . 74g38.3.3 Actors 74g38.3.4 Pre-conditions . 74g38.3.5 Triggers . 74g38.3.6 Normal Flow . 74g38.3
22、.7 Alternative flow 78g38.3.8 Post-conditions . 78g38.3.9 High Level Illustration 79g38.3.10 Potential Requirements . 79g38.4 Smart Parking . 79g38.4.1 Description 79g38.4.2 Source . 79g38.4.3 Actors 80g38.4.4 Pre-conditions . 80g38.4.5 Triggers . 80g38.4.6 Normal Flow . 80g38.4.7 Alternative flow 8
23、2g38.4.8 Post-conditions . 83g38.4.9 High Level Illustration 84g38.4.10 Potential Requirements . 84g38.5 Information Delivery service in the devastated area 84g38.5.1 Description 84g38.5.2 Source . 85g38.5.3 Actors 85g38.5.4 Pre-conditions . 85g38.5.5 Triggers . 85g38.5.6 Normal Flow . 85g38.5.7 Alt
24、ernative flow 86g38.5.8 Post-conditions . 86g38.5.9 High Level Illustration 87g38.5.10 Potential Requirements . 87g39 Residential Use Cases 88g39.1 Home Energy Management 88g3ETSI ETSI TR 118 501 V1.0.0 (2015-05) 6 9.1.1 Description 88g39.1.2 Source . 88g39.1.3 Actors 88g39.1.4 Pre-conditions . 89g3
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ETSITR1185012015ONEM2MUSECASECOLLECTIONV100ONEM2M 使用 案例 收集 V100PDF

链接地址:http://www.mydoc123.com/p-736518.html