ETSI ES 205 200-2-2-2018 Access Terminals Transmission and Multiplexing (ATTM) Energy management Global KPIs Operational infrastructures Part 2 Specific requirements Sub-part 2 Fix.pdf
《ETSI ES 205 200-2-2-2018 Access Terminals Transmission and Multiplexing (ATTM) Energy management Global KPIs Operational infrastructures Part 2 Specific requirements Sub-part 2 Fix.pdf》由会员分享,可在线阅读,更多相关《ETSI ES 205 200-2-2-2018 Access Terminals Transmission and Multiplexing (ATTM) Energy management Global KPIs Operational infrastructures Part 2 Specific requirements Sub-part 2 Fix.pdf(23页珍藏版)》请在麦多课文档分享上搜索。
1、 ETSI ES 205 200-2-2 V1.1.1 (2018-05) Access, Terminals, Transmission and Multiplexing (ATTM); Energy management; Global KPIs; Operational infrastructures; Part 2: Specific requirements; Sub-part 2: Fixed broadband access networks ETSI STANDARD ETSI ETSI ES 205 200-2-2 V1.1.1 (2018-05) 2 Reference D
2、ES/ATTM-02026 Keywords broadband, energy efficiency ETSI 650 Route des Lucioles F-06921 Sophia Antipolis Cedex - FRANCE Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16 Siret N 348 623 562 00017 - NAF 742 C Association but non lucratif enregistre la Sous-Prfecture de Grasse (06) N 7803/88 Important no
3、tice The present document can be downloaded from: http:/www.etsi.org/standards-search The present document may be made available in electronic versions and/or in print. The content of any electronic and/or print versions of the present document shall not be modified without the prior written authori
4、zation of ETSI. In case of any existing or perceived difference in contents between such versions and/or in print, the only prevailing document is the print of the Portable Document Format (PDF) version kept on a specific network drive within ETSI Secretariat. Users of the present document should be
5、 aware that the document may be subject to revision or change of status. Information on the current status of this and other ETSI documents is available at https:/portal.etsi.org/TB/ETSIDeliverableStatus.aspx If you find errors in the present document, please send your comment to one of the followin
6、g services: https:/portal.etsi.org/People/CommiteeSupportStaff.aspx Copyright Notification No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm except as authorized by written permission of ETSI. The content of the PDF vers
7、ion shall not be modified without the written authorization of ETSI. The copyright and the foregoing restriction extend to reproduction in all media. ETSI 2018. All rights reserved. DECTTM, PLUGTESTSTM, UMTSTMand the ETSI logo are trademarks of ETSI registered for the benefit of its Members. 3GPPTM
8、and LTETMare trademarks of ETSI registered for the benefit of its Members and of the 3GPP Organizational Partners. oneM2M logo is protected for the benefit of its Members. GSMand the GSM logo are trademarks registered and owned by the GSM Association. ETSI ETSI ES 205 200-2-2 V1.1.1 (2018-05) 3 Cont
9、ents Intellectual Property Rights 5g3Foreword . 5g3Modal verbs terminology 6g3Introduction 6g31 Scope 7g32 References 7g32.1 Normative references . 7g32.2 Informative references 7g33 Definitions, symbols and abbreviations . 8g33.1 Definitions 8g33.2 Symbols 9g33.3 Abbreviations . 9g34 System definit
10、ion and boundaries 10g34.1 Fixed access networks 10g34.2 Topology 12g35 Mapping to the objectives of ETSI ES 205 200-1 13g35.1 Energy consumption . 13g35.2 Task effectiveness 14g35.3 Energy re-use 14g35.4 Renewable energy 14g36 Global operational KPIs . 14g36.1 General . 14g36.2 Scale . 14g36.3 Evol
11、ution 15g36.4 Formulae. 15g36.4.1 KPIEM15g36.4.1.1 Formula . 15g36.4.1.2 Definitions of symbols 15g36.4.1.3 Measurement procedures 16g36.4.1.4 Criteria 16g36.4.2 KPIEC16g36.4.2.1 Formula . 16g36.4.2.2 Definitions of terms. 16g36.4.2.3 Measurement points 16g36.4.2.4 Measurement procedures 17g36.4.2.5
12、 Criteria 17g36.4.3 KPITE. 17g36.4.3.1 Formula . 17g36.4.3.2 Definitions of terms. 17g36.4.3.3 Measurement points 17g36.4.3.4 Measurement procedures 18g36.4.3.5 Criteria 18g36.4.4 KPIREN. 18g36.4.4.1 Formula . 18g36.4.4.2 Definitions of terms. 18g36.4.4.3 Measurement points 18g36.4.4.4 Measurement p
13、rocedures 18g36.4.4.5 Criteria 18g36.5 Weighting factors . 19g36.5.1 Renewable energy (WREN) . 19g3ETSI ETSI ES 205 200-2-2 V1.1.1 (2018-05) 4 Annex A (informative): Concepts: Energy management, sustainability and Key Performance Indicators 20g3A.1 Energy management and sustainability concepts . 20g
14、3A.2 The status of Key Performance Indicators (KPIs) 21g3A.2.1 Technical KPIs . 21g3A.2.2 Objective KPIs . 21g3A.2.3 Global KPIs 22g3A.2.4 Summary 22g3History 23g3ETSI ETSI ES 205 200-2-2 V1.1.1 (2018-05) 5 Intellectual Property Rights Essential patents IPRs essential or potentially essential to nor
15、mative deliverables may have been declared to ETSI. The information pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found in ETSI SR 000 314: “Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETS
16、I in respect of ETSI standards“, which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web server (https:/ipr.etsi.org/). Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee can be given as to the exis
17、tence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become, essential to the present document. Trademarks The present document may include trademarks and/or tradenames which are asserted and/or registered by their owners. ETSI cl
18、aims no ownership of these except for any which are indicated as being the property of ETSI, and conveys no right to use or reproduce any trademark and/or tradename. Mention of those trademarks in the present document does not constitute an endorsement by ETSI of products, services or organizations
19、associated with those trademarks. Foreword This ETSI Standard (ES) has been produced by ETSI Technical Committee Access, Terminals, Transmission and Multiplexing (ATTM). The present document is part 2, sub-part 2 of a multi-part deliverable covering operational energy management and sustainability o
20、f broadband deployment, as identified below: Part 1: “General requirements“. Part 2: “Specific requirements“: Sub-part 1: “Data centres“; Sub-part 2: “Fixed broadband access networks“; Sub-part 3: “Mobile access networks“; Sub-part 4: “Cable Access Networks“. Part 3: “Global KPIs of ICT sites“; Part
21、 4: “Monitoring of sustainability“. NOTE 1: Additional documents are in development by ETSI Technical Committee Access, Terminals, Transmission and Multiplexing (ATTM) which include: square4 ETSI ES 205 200-1-1: “Energy management: Global KPIs: Operational infrastructures: Guidance“ (see NWIP DES/AT
22、TM-02025). square4 ETSI ES 205 200-3: “Monitoring of other environmental viability aspects of sustainability“ (see NWIP DES/ATTM-02027). NOTE 2: A further document is under consideration in ETSI Technical Committee CABLE to address “cable access networks“. ETSI ETSI ES 205 200-2-2 V1.1.1 (2018-05) 6
23、 Modal verbs terminology In the present document “shall“, “shall not“, “should“, “should not“, “may“, “need not“, “will“, “will not“, “can“ and “cannot“ are to be interpreted as described in clause 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of provisions). “must“ and “must not“
24、are NOT allowed in ETSI deliverables except when used in direct citation. Introduction Energy costs continue to increase, a trend that will continue in the future, while broadband penetration is introducing new active equipment to the network architecture. In this context, and to reflect other envir
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ETSIES205200222018ACCESSTERMINALSTRANSMISSIONANDMULTIPLEXINGATTMENERGYMANAGEMENTGLOBALKPISOPERATIONALINFRASTRUCTURESPART2SPECIFICREQUIREMENTSSUBPART2FIXPDF

链接地址:http://www.mydoc123.com/p-731240.html