1、 STD-BSI BS EN q5510-5-L-ENGL 1778 m Zb24bb9 Ob98051 309 = BRITISH STANDARD Guide for procurement of power station equipment - Part 5-1: Steam turbines * * r.n The European standard EN 455105.11998 has the status of a British Standard ICs 27.040; 27.100 NO COPYING WITHOUT BSI PERMISSION EXCEPT AS PE
2、RMITTED BY COPYRIGHT LAW BS EN 455 10-5-1: 1998 BS EN 45510-5-1:1998 National foreword This British Standard is the English language version of EN 4551051:1998. The TJK participation in its preparation was entmstd to Technid Committee E/-120, Power engineerjng steering committee, which has the respo
3、nsibility to: - aid enquirers to understand the tea, - present to the responsible internationaVEwpean committee any enquiries on the interpretation, or proposais for change, and keep the UK interests informed; - monitor related international and European developments and promulgate them in the UK. A
4、 list of organizations represented on this committee cm be obtained on request to its secretay. Cross-references The British Standards which implement international or European pubhations referred to in this document may be found in the BSI Standards Catalogue under the section entitied “Internation
5、ai Standards Correspondence Index”, or by using the “Find” facility of the BSI Standards Electronic Catalogue. A British standard does not purport to include all the necessary provisions of a contra - back-pressure turbine whose exhaust wiii be used for process heating; - condensing turbine whose ex
6、haust is directly connected to a condenser ; - mixed pressure turbine; - regenerative cycle turbine; - extraction turbine; - combined cycle turbine. This Guide for procurement of steam turbines has been prepared to be used with the existing European sht:?:L 9 c! EN 600451, it should, therefore, be r
7、ead in ad -mm and complementary to the European SidY G?ld. The equipment covered by this Guide is defined by its function mther thun design type. Dterefn-e, the guidance to the specmation is stated in ormunce temzs mULer than being sp Th.is Guide does not determine the type of specification (e.g. de
8、tuil - any allocation of responsrities which are determined by the contract. This Guide cloes not prescribe the arrangement of the 3cumts in the enquiru. NOTE As a comprehensive European environmental policy is st under prepamtion, this Guide does not address the environmental implications of the eq
9、uipment. 2 Nonnative references This Guctive ref- are cited in the agqmpriate piaces in the text and the publications are listed maW. For dated wfmes, subsequent amendments to or ?-ak - geological e.g. seismic conditions and charactemstics of subsoil (e.g. caverns, gliding, load bearing capability o
10、f subsoils; - geographic e.g. elevation, influence of local topography and structures; - hydrological e.g.jlooding and tides. O BSI 1998 STD*BSI BS EN q55LO-5-L-ENGL 1778 Lb2Libb7 Ob78058 7b3 Page 6 EN 45510-6-1:1998 4.3 EquZpment task The speciftcation should describe in general temzs the function,
11、 tusk or role of the equipment to be purchased, e.g. whether it .is part of a nao power gmting plant, a modvication to an existing power genemting plant or repucernent equipment. where appropriate, the specmation should define the function and the known limitations, if any, in the equipment connecte
12、d to that which .is being supplied so that the equipment may avoid imposing adverse conditions or the supplier my suggest mdifkatiom to connected equipment which would ensure satiyfactory operation. 4.4 Equipment to be purchased The specification may define the equipment type m arrangernent to be pu
13、rchased. For example the purchaser may specisr: a) the turbine type, e.g. reheat or non-reheat; b) method of load variation, e.g. constant pressure or sliding pressure operation. The specification may - control safe and protection system); - lubricating system(s); - rotor bearings; - g-; - couplings
14、; - mounting system(s); - enclosures and ventilation system; - driven equipment; - pumps. E.3 Description of maintenance operations The supplier should clearly describe the amount of dismantling required for each operation except when this is done at the manufacturers works, for example: - inspectio
15、n of turbine blading; - inspection of major shafts and discs including blade attachments. E.4 Location of maintenance operations The supplier should state where maintenance operations on major integral components will be performed, for example: - in position in the unic - in the manufacturers shop;
16、- at the site of installation; - at a repair centre. If operations are to be performed at a repair centre, the supplier should state if exchange or lease components are offered E.6 Operation and maintenance training requirements The supplier, if requested, should provide information on training faci
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- EN45510511998ENGUIDEFORPROCUREMENTOFPOWERSTATIONEQUIPMENTPART51STEAMTURBINES 发电站 设备 采购 指南 51 部分 蒸汽 涡轮

链接地址:http://www.mydoc123.com/p-716565.html