DOT 49 CFR PART 234-2010 GRADE CROSSING SIGNAL SYSTEM SAFETY AND STATE ACTION PLANS.pdf
《DOT 49 CFR PART 234-2010 GRADE CROSSING SIGNAL SYSTEM SAFETY AND STATE ACTION PLANS.pdf》由会员分享,可在线阅读,更多相关《DOT 49 CFR PART 234-2010 GRADE CROSSING SIGNAL SYSTEM SAFETY AND STATE ACTION PLANS.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、647 Federal Railroad Administration, DOT Pt. 234 penalty not to exceed $100,000 per viola-tion may be assessed. Each day a viola-tion continues shall constitute a sepa-rate offense. See appendix A to this part for a statement of agency civil penalty policy. 63 FR 11623, Mar. 10, 1998, as amended at
2、69 FR 30595, May 28, 2004; 72 FR 51197, Sept. 6, 2007; 73 FR 79703, Dec. 30, 2008 233.13 Criminal penalty. Whoever knowingly and willfully (a) Makes, causes to be made, or par-ticipates in the making of a false entry in reports required to be filed by this part; or (b) Files a false report or other
3、docu-ment required to be filed by this part is subject to a $5,000 fine and 2 years im-prisonment as prescribed by 49 U.S.C. 522(a) and section 209(e) of the Federal Railroad Safety Act of 1970, as amend-ed (45 U.S.C. 438(e). APPENDIX A TO PART 233SCHEDULE OF CIVIL PENALTIES1Section Violation Willfu
4、l viola-tion 233.5 Accidents resulting from signal failure $2,500 $5,000 233.7 Signal failure reports . 5,000 7,500 233.9 Annual reports 1,000 2,000 1A penalty may be assessed against an individual only for a willful violation. The Administrator reserves the right to assess a penalty of up to $100,0
5、00 for any violation where circumstances warrant. See 49 CFR part 209, appendix A. 53 FR 52936, Dec. 29, 1988, as amended at 63 FR 11623, Mar. 10, 1998; 69 FR 30595, May 28, 2004; 73 FR 79704, Dec. 30, 2008 PART 234GRADE CROSSING SIG-NAL SYSTEM SAFETY AND STATE ACTION PLANS Subpart AGeneral Sec. 234
6、.1 Scope. 234.3 Application. 234.5 Definitions. 234.6 Penalties. Subpart BReports and Plans 234.7 Accidents involving grade crossing sig-nal failure. 234.9 Grade crossing signal system failure reports. 234.11 State highway-rail grade crossing ac-tion plans. Subpart CResponse to Reports of Warning Sy
7、stem Malfunction 234.101 Employee notification rules. 234.103 Timely response to report of mal-function. 234.105 Activation failure. 234.106 Partial activation. 234.107 False activation. 234.109 Recordkeeping. Subpart DMaintenance, Inspection, and Testing MAINTENANCE STANDARDS 234.201 Location of pl
8、ans. 234.203 Control circuits. 234.205 Operating characteristics of warning system apparatus. 234.207 Adjustment, repair, or replacement of component. 234.209 Interference with normal func-tioning of system. 234.211 Security of warning system appa-ratus. 234.213 Grounds. 234.215 Standby power system
9、. 234.217 Flashing light units. 234.219 Gate arm lights and light cable. 234.221 Lamp voltage. 234.223 Gate arm. 234.225 Activation of warning system. 234.227 Train detection apparatus. 234.229 Shunting sensitivity. 234.231 Fouling wires. 234.233 Rail joints. 234.235 Insulated rail joints. 234.237 R
10、everse switch cut-out circuit. 234.239 Tagging of wires and interference of wires or tags with signal apparatus. 234.241 Protection of insulated wire; splice in underground wire. 234.243 Wire on pole line and aerial cable. 234.245 Signs. VerDate Mar2010 09:47 Dec 14, 2010 Jkt 220215 PO 00000 Frm 006
11、57 Fmt 8010 Sfmt 8010 Y:SGML220215.XXX 220215jdjones on DSK8KYBLC1PROD with CFRProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-648 49 CFR Ch. II (10110 Edition) 234.1 INSPECTIONS AND TESTS 234.247 Purpose of inspections and tests; re-moval from servi
12、ce of relay or device failing to meet test requirements. 234.249 Ground tests. 234.251 Standby power. 234.253 Flashing light units and lamp volt-age. 234.255 Gate arm and gate mechanism. 234.257 Warning system operation. 234.259 Warning time. 234.261 Highway traffic signal pre-emption. 234.263 Relay
13、s. 234.265 Timing relays and timing devices. 234.267 Insulation resistance tests, wires in trunking and cables. 234.269 Cut-out circuits. 234.271 Insulated rail joints, bond wires, and track connections. 234.273 Results of inspections and tests. REQUIREMENTS FOR PROCESSOR-BASED SYSTEMS 234.275 Proce
14、ssor-based systems. APPENDIX A TO PART 234SCHEDULE OF CIVIL PENALTIES APPENDIX B TO PART 234ALTERNATE METH-ODS OF PROTECTION UNDER 49 CFR 234.105(C), 234.106, AND 234.107(C). AUTHORITY: 49 U.S.C. 20103, 20107; 28 U.S.C. 2461, note; Pub. L. 110432, Div. A, 202; and 49 CFR 1.49. SOURCE: 61 FR 31806, J
15、une 20, 1996, unless otherwise noted. Subpart AGeneral 234.1 Scope. This part imposes minimum mainte-nance, inspection, and testing stand-ards for highway-rail grade crossing warning systems. This part also pre-scribes standards for the reporting of failures of such systems and prescribes minimum ac
16、tions railroads must take when such warning systems malfunc-tion. This part also requires particular identified States to develop State high-way-rail grade crossing action plans. This part does not restrict a railroad or a State from adopting and enforcing additional or more stringent require-ments
17、not inconsistent with this part. 75 FR 36558, June 28, 2010 234.3 Application. With the exception of 234.11, this part applies to all railroads except: (a) A railroad that exclusively oper-ates freight trains only on track which is not part of the general railroad sys-tem of transportation; (b) Rapi
18、d transit operations within an urban area that are not connected to the general railroad system of trans-portation; and (c) A railroad that operates passenger trains only on track inside an installa-tion that is insular; i.e., its operations are limited to a separate enclave in such a way that there
19、 is no reasonable expectation that the safety of the pub-licexcept a business guest, a licensee of the railroad or an affiliated entity, or a trespasserwould be affected by the operation. An operation will not be considered insular if one or more of the following exists on its line: (1) A public hig
20、hway-rail crossing that is in use; (2) An at-grade rail crossing that is in use; (3) A bridge over a public road or wa-ters used for commercial navigation; or (4) A common corridor with a rail-road, i.e., its operations are within 30 feet of those of any railroad. 75 FR 36558, June 28, 2010 234.5 De
21、finitions. As used in this part: Activation failure means the failure of an active highway-rail grade crossing warning system to indicate the ap-proach of a train at least 20 seconds prior to the trains arrival at the cross-ing, or to indicate the presence of a train occupying the crossing, unless t
22、he crossing is provided with an alter-native means of active warning to highway users of approaching trains. (This failure indicates to the motorist that it is safe to proceed across the railroad tracks when, in fact, it is not safe to do so.) A grade crossing signal system does not indicate the app
23、roach of a train within the meaning of this paragraph ifmore than 50% of the flashing lights (not gate arm lights) on any approach lane to the crossing are not functioning as intended, or in the case of an approach lane for which two or more pairs of flashing lights are pro-vided, there is not at le
24、ast one flashing light pair operating as intended. Back lights on the far side of the crossing are not considered in making these de-terminations. VerDate Mar2010 09:47 Dec 14, 2010 Jkt 220215 PO 00000 Frm 00658 Fmt 8010 Sfmt 8010 Y:SGML220215.XXX 220215jdjones on DSK8KYBLC1PROD with CFRProvided by
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DOT49CFRPART2342010GRADECROSSINGSIGNALSYSTEMSAFETYANDSTATEACTIONPLANSPDF

链接地址:http://www.mydoc123.com/p-702093.html