DLA MIL-T-9918 C-1989 TOW TARGET AERIAL DART GUNNERY TYPE TDU-10 B AND TDU-10B B《TDU-10 B和TDU-10B B射击型航空箭形弹的拖靶》.pdf
《DLA MIL-T-9918 C-1989 TOW TARGET AERIAL DART GUNNERY TYPE TDU-10 B AND TDU-10B B《TDU-10 B和TDU-10B B射击型航空箭形弹的拖靶》.pdf》由会员分享,可在线阅读,更多相关《DLA MIL-T-9918 C-1989 TOW TARGET AERIAL DART GUNNERY TYPE TDU-10 B AND TDU-10B B《TDU-10 B和TDU-10B B射击型航空箭形弹的拖靶》.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、t f I INCH-POUND I 5 JUNE 1989 SUPERSEDING MI L-T -99 188 27 June 1W3 MILITARY SPECIFICATION TOW TARGET, AERIAL DART, GUNNERY TYPE TDU-1O/B and TDU-lOB/B 1. SCOPE 1.1- This Specification establishes the requirements for manufacture and Government acceptance of the TDU-1O/B and TDU-1OB/B Tow Target,
2、which is used for air-to-air gunnery training of fighter pilots. 2. APPLICABLE DOCUMENTS 2.1 Government documents. .2.1.1 . Specifications, standards, and handbook. The following specifications,. standards and handbooks form a part of this specification to the extent specified herein. Unless otherwi
3、se specified, the issues of these documents shall be those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISSI and supplement thereto, cited in the solicitation. r 1 Beneficial comments (recommendations, additions, deletions) and any pertinent data which m
4、ay be of use in improving this document should be addressed to: Ogden ALC/MMDSA Hill Air Force Base, Utah 84056-5609 by using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. SPECIFICATIONS Federal QQ-S-781 Strapping,
5、 Steel, Flat and Seals AMSC N/A FSC 6920 DISTRIBUTION STATEMENT A: Approved for publ-ic release, distribution is unlimited. THIS DOCUMENT CONTAINS /2 PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-7918C b7 W 7797706 0376418 L = PPP-B- 3
6、5 PPP-T-97 Mi 1 i tary MIL-P- 116 MIL-B-121 MIL-8-131 MIL-P- 17667 MIL-A-83377 STANDARDS Mi 1 i tary MIL-STD-105 MIL-STD-129 MIL-STD-130 MIL-STD-401 MIL-STD-794 MIL-STD-831 MILITARY HANDBOOK Bags, Textile-Shipping, Eiurlap, Cotton and WaterProof Tape, Pressure-Sensitive Adhesive, Filament Reinforced
7、 Preservation-Packaging, Methods of Barrier Material, Qreaseproofed, Waterproofed, Flexible, Heat-Sealed Barrier Materials, Watervaporproof, Flexible, Heat Sealable Paper, Wrapping, Chemically Neutral (Non-Corrosive) Adhesive Bonding for Aerospace Systems, Guidelines for Sampling Procedures and Tabl
8、es for Inspection by Attributes Marking for Shipment and Storage Identification Marking of US Military Property Sandwich Contructions and Core Materials; General Test Methods Parts and Equipment, Procedure for Packaging and Packing of Test Reports, Preparation of MIL-HDBK-106 Multi-Level Continuous
9、Sampling Procedure and Tables for Irispea t i on by Attributes 2.1.2 Other Government documents, drawings, and publications. The following other Government documents, drawings and publications Iorm a part of this specification to the extent specified herein. the issues shall be thoge in effect on th
10、e date of the soiicltation. Unless otherwise specified, DRAW1 NS Air Force 59BQO7 14 5QCQO7 18 59D90724 59D907 11 5QD907 17 5QD9072 1 59D90722 59D90727 59D90728 Lug Adapter Count er We 1 g h t -Adj us t ing Base Assembly-Reflection Rail-Keel Assy Nose Angle Nose Assy Fairing Ref lector Assembly Brid
11、le Assembly I 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-5 9H9 U7 30 Target Assemb 1 y 6 4H3 U 383 Wing Panel, Specification Control Drawing 8 12 1564 Target Assy, Type TDU-lOii/B 8121565 Adapter Assy, Type TDU-lOB/B TRANSPORTATION PACKAGINO O
12、RDER (TPO) Air Force TPO 6920-613-0312 TDU-lU/B Tow Target TDU-lOB/B Tow Target “(Copies of specifications, standards, handbooks, drawings, publications, and other government documents required by contractors in connection with specific acquisition functions should be obtained from the contracting a
13、ctivity or as directed by the contracting activity.)“ 2.3 Order of precedence. In the event of a conflict between the text of this specification and the references cited herein (except for associated detail specifications, specification sheets or MS standards), the text of this specification shall t
14、ake precedence. Nothing in this specification, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained.“ 3. REQUIREMENTS 3.1 Classification of requirements. The requirements for the TDU-1U/B and TDU-lOB/B Tow Target are classified herein as follows: REQ
15、UIREMENTS PARAGRAPHS Preproduction First Art i c 1 e Mat er i al Design and Construction Performance Characteristics Iden t i f i cat i on Workmanship Bridle Strength 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.6 3.2 Preproduction requirements. The preproduction requirements for the TDU-l/B and TDU-lOB/B Tow Targ
16、et are classified herein as follows: REQUIREMENTS PARAGRAPHS Process Spec i f i ca t i on 3.2.1 Testing 3.2.2 and 4.3 Test Report 4.3.6 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-c- - - MIL-T-99LBC 69 W 9999306 0376420 T 3.2.1 Process specific
17、ation. A process specification in accordance with MIL-A-83317 shall be prepared by the contractor covering all details of the wing panel bnding operation. Force for acceptance concurrent with the delivery of the first article wing panels. The acceptance of the process specification does not relieve
18、the Contractor from assuring that the wing panels meet the required performane-e characteristics (see 3.6). This document shall be submitted to the Air 3.2.1.2 Brand names data sheets. All brand names, data sheets. and other required information shall be included ir1 the process specification. All d
19、eviations (during production) to the approved contractors process specification must have prior approval by the cognizant Air Force engineering agency. Such deviation shall be granted only if sufficient test data is submitted to assure the Air Force that no degradation of the target shall occur. Any
20、 documents containing proprietary information and labeled as such, will be handled in accordance with applicable directions for these documents. 3,2.2 Testing. Initial Contractor testing shall consist of peel strength tests. These tests shall determine the peel strength of the adhesive bond between
21、both the facing/core and facing/wood frame of the wing panels. Minimum peel strength requirements are specified in Table I with peel strength testing listed in Table II. Failure to achieve minimum peel strength requirements will preclude first article testing by the Air Force. 3.3 First article. The
22、 contractor shall submit four wing panels, in accordance with 64H30383 and 8121564. to the Air Force for first article testing. The wing shall be representative of the production item and produced using the same material, processes, and equipment that will be used during production. The wing panels
23、will be consumed in testing. Ali fabrication and shipping expenses shall be borne by the prospective contractor. 6.3) See 4.3 and 3.3.1 First article tests. These tests shall consist of detailed inspection of the four wing panels submitted and such additional peel strength tests as deemed necessary
24、by the Air Force to assure that the panels meet specification requirements. 3.3.2 Acceptance or rejection. Acceptance or rejection of the first article panels shall be determined by the Air Force. The Air Force shall furnish a report to the contractor concerning the results of the first article test
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DLAMILT9918C1989TOWTARGETAERIALDARTGUNNERYTYPETDU10BANDTDU10BBTDU10B TDU10BB 射击 航空 箭形弹 拖靶 PDF

链接地址:http://www.mydoc123.com/p-693660.html