DLA MIL-M-24350 B (2)-1992 MONITORS REVERSE POWER AND POWER-SENSING ELECTRICAL POWER (NAVAL SHIPBOARD USE) (METRIC)《逆功率监控器和电功率感应(军舰用)(米制)》.pdf
《DLA MIL-M-24350 B (2)-1992 MONITORS REVERSE POWER AND POWER-SENSING ELECTRICAL POWER (NAVAL SHIPBOARD USE) (METRIC)《逆功率监控器和电功率感应(军舰用)(米制)》.pdf》由会员分享,可在线阅读,更多相关《DLA MIL-M-24350 B (2)-1992 MONITORS REVERSE POWER AND POWER-SENSING ELECTRICAL POWER (NAVAL SHIPBOARD USE) (METRIC)《逆功率监控器和电功率感应(军舰用)(米制)》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-M-24350B (2) 57 0 7999906 0523072 4 AMENDMENT 2 16 ADril 1992 SUPERSEDING AMENDMENT 1 5 January 1990 MILITARY SPECIFICATION MONITORS, REVERSE POWER AND POWER-SENSING, ELECTRICAL POWER (NAVAL SHIPBOARD USE) (METRIC) This amendment forms a part of MIL-M-24350B(SH), dated 31 July 1989, and is appro
2、ved for use by the Naval Sea Systems Command, Department of the Navy and is available for use by all Departments and Agencies of the Department of Defense. PAGE 3 * 3.1: Delete and substitute: “3.1 First article. When specified (see 6.2), a sample shall be subjected to first article inspection (see
3、6.6) in accordance with 4.4.“ a PAGE 9 * 4.2: Delete and substitute: “4.2 Classification of inspections. The inspection requirements specified herein are classified as follows: (a) First article inspection (see 4.4). (b) Comparison inspection (see 4.5). (c) Quality conformance inspection (see 4.6).!
4、 . * 4.4 and 4.4.1: Delete and substitute: “4.4 First article inspection. First article inspection shall be performed on one monitor of each type. examination and tests specified in table II.“ First article inspection shall consist of the * 4.5, line 2: Following “table II“ add “(see 6.31“. a AMSC N
5、/A FSC 5925 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. .- 1 of 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I MIL-M-24350B (2) 59 H 9999906 0523073 b = . tC 9*-a MIL-M-24350B(SH) AMENDMENT 2 qomp.ar - ison
6、PAGE 10 Table II: Delete and substitute: Quality conformance TAHLE II. First article. comDarison.and quality conformance inspections. X - Test X - General examination Effectiveness of enclosure Creepage and c le ar anc e Insulation resistance Wiring Warm-up Temperature rise Sensing Trip recovery Ove
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DLAMILM24350B21992MONITORSREVERSEPOWERANDPOWERSENSINGELECTRICALPOWERNAVALSHIPBOARDUSEMETRIC 功率 监控器 电功率

链接地址:http://www.mydoc123.com/p-691552.html