DLA L-P-516 A-1967 PLASTIC SHEET AND PLASTIC ROD THERMOSETTING CAST《铸件热硬化性的塑料层和钻杆》.pdf
《DLA L-P-516 A-1967 PLASTIC SHEET AND PLASTIC ROD THERMOSETTING CAST《铸件热硬化性的塑料层和钻杆》.pdf》由会员分享,可在线阅读,更多相关《DLA L-P-516 A-1967 PLASTIC SHEET AND PLASTIC ROD THERMOSETTING CAST《铸件热硬化性的塑料层和钻杆》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MILSTD-129-Marking for Shipment and Storage, (Copies of Military Specifications and Shndards required by contradora in eonnection with specific pimurement functons should be obtained from the procuring
2、activity or ria directed by the contracting officer.) 3. REQUIREMENTS 3.1 Material, The material shall be cast thermosetting resins so formulated and proceased aa to meet the rquirements of this specification. 3.1.1 Cluritg. The material shall be color- less, transparent, translucent, or opaque, as
3、specified (see 6.2). 3.1.2 Form The material shall be sheets, rods, tubes, or other forms, as specified, with the dimensions specified (see 6.2). 3.1.2.1 Dimensionab tolerance on sheets. 3.1.2,l.l Length and width. The length and width of untrimmed sheets may vary 1 inch over or under the manufactur
4、ers standard size. The length and width of trimmed sheets shall be within plus 0.260, minus 0.000-inch of the nominal size. Meas- urements to determine length and width shall be made at 23 vary from the normal by a value greater than 125 percent of the specified variation. 3S.2.2 Dimemional toleranc
5、e on rods ad tzibes. The tolerance on rods and tubes shall be as follows: Dimension Tolerance Length -t- 1 inch Diameter shall not have any cracks, breaks, bubbles, wrinkles, scratches, dents, or ragged edges; and shall be clean cut. 3.2 Property values. When specimens are tested as specified herein
6、, the values ob- tained from each set of specimens for a specific property, after each conditioning procedure specified in table I, shall be aver- aged, and the results so obtained shall meet the required values specified in table I, 4. QUALITY*ASSURANBE PROVI- SIONS 4.1 Responsibility for inspectio
7、n. Unless otherwise specified in the contract or pur- chase order, the supplier is responsible for the performance of all inspection require- ments as specified herein. Except as other- wise specified, the supplier may utilize his own facilities or any commercial laboratory acceptable to the Governm
8、ent. The Govern- ment reserves the right to perform any of the inspections set forth in the specifica- tion, where such inspections are deemed necessary to assure that supplies and serv- ices conform to prescribed requirements. 42 Sampling for quality conformance in- spection. Sampling for quality c
9、onformance inspection shall be performed in accordance with the provisions set forth in MIL-STD- 105, except where otherwise indicated here- inafter. For purpose of sampling, an in- spection lot for inspection and tes clm not accomplished by specified or required methods or materiais. Any nonconform
10、ing component, component missing, damaged, or otherwise defective, affecting serviceability. Inadequate application of com- ponents such as incomplete closure of case liners, container flaps, loose or inadequate strapping, bulged or distorted containers. Less than specified or indicated quantity. In
11、terior or exterior markings (ae applicable) , omitted, illegible, incorrect, incomplete or not in accordance with contract requirements. Gross or net weight exceeds Specified rqirementa. packaged as specified. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from
12、IHS-,-,-L-P-5LbA 73- 779777q 0007320 3 m 4.3.1.1.4 Impectwn levels an no special conditioning. B-Immersion conditioning in distilled water. E-Temperature conditioning. Des-Desiccation conditioning; cooling over silica gel oy calcium chloride in a desiccator at 23O C. for 16 to 20 hours. 4,4.2,3,2 Fr
13、ocedwes. The conditioning procedure required, with the exception of conditions A and des, shall be indicated by the following combination of symbols: (a) A capital letter specifying the type of conditioning. (b) A number indicating in hours the dura4ion of the conditioning. (e) A number indicating i
14、n degrees cent- grade the conditioning temper- ature. The numbers shall be separated from each other. by a slant mark, and from the capital letter by a dash. A sequence of conditions shall be denoted by the use of a plus ( +) sign betweefi the successve* conditions. * 4.4.2.3.3 Time tolerames. Condi
15、tioning2 time tolerances and additional testing in- formation shall be as specified in table V. 4.43 Apparatus and procedure. The ap- paratus and procedure shall be as specified in the method of test, and as modified hera- in. 4.48.1 Water absorption. The test speci- mens shall be tested in accordan
16、ce with pro- cedure A, immersion in water for 24 hours, except that the conditioning period shall be 48 hours at 50 C. 4.4.3.2 Dielectrzc strength (f lathe). l!he test shaII be made under oil at a frequency Test humidity, Conditioning-time tolerance temperature, Ctmlitioning procedure 1/ D-48/50 f D
17、-%/23 E-48/50 4- dCS -t. D-24/23 (for water absorption). Oven or + 2, -0 hr. E-1/75 1, -0 lir. i I Hot water _- water tolerances -I- + 2, -O hr. + 2, -0 hr. 23“ + 1.1“ C., 50 -t. 4 per- cent RH - 75“ -i- 2“ c. Remarks N Start test 2 minutes after removing specimens from final conditioning bath. stre
18、ngth without removing speciitiens from the oven. Measure fIexural I/ After immersion conditioning, surface water shall be removed by wiping the specimen with a damp cloth, followed by wiping with a dry cloth t Provided by IHSNot for ResaleNo reproduction or networking permitted without license from
19、IHS-,-,-L-P-516a not exceeding 100 cycles per second. The electrodes shall be metal disks 2 inches in diameter and 1 inch in length with the edges rounded to a radius of 1/4 inch. The test specimens shall be disks, 4 inches in di- ameter by 1/8 inch in thickness. 4.4.3.2.1 Short-time test. The volta
20、ge shall be increased uniformly at the rate of 500 volts per second. 4.4.3.2.2 Step-by-step test. The voltage shall be increased by the increments speci- fied in table VI. It shall be held at each step for 1 minute and then changed to the next higher one within 10 seconds. This process shall be cont
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DLALP516A1967PLASTICSHEETANDPLASTICRODTHERMOSETTINGCAST 铸件 化性 塑料 钻杆 PDF

链接地址:http://www.mydoc123.com/p-689449.html