BS EN 14587-3-2012 Railway applications Track Flash butt welding of rails Welding in association with crossing construction《轨道交通 轨道 钢轨的闪光对接焊 与交叉建设相关的焊接》.pdf
《BS EN 14587-3-2012 Railway applications Track Flash butt welding of rails Welding in association with crossing construction《轨道交通 轨道 钢轨的闪光对接焊 与交叉建设相关的焊接》.pdf》由会员分享,可在线阅读,更多相关《BS EN 14587-3-2012 Railway applications Track Flash butt welding of rails Welding in association with crossing construction《轨道交通 轨道 钢轨的闪光对接焊 与交叉建设相关的焊接》.pdf(46页珍藏版)》请在麦多课文档分享上搜索。
1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI Standards PublicationBS EN 14587-3:2012Railway applications Track Flash butt welding of railsPart 3: Welding in association with crossingconstructionBS EN 14587-3:2012 BRITISH STANDARDNational forewo
2、rdThis British Standard is the UK implementation of EN 14587-3:2012. The UK participation in its preparation was entrusted to TechnicalCommittee RAE/2, Railway Applications - Track.A list of organizations represented on this committee can beobtained on request to its secretary.This publication does
3、not purport to include all the necessaryprovisions of a contract. Users are responsible for its correctapplication. The British Standards Institution 2012. Published by BSI StandardsLimited 2012 ISBN 978 0 580 65807 5 ICS 25.160.10; 93.100 Compliance with a British Standard cannot confer immunity fr
4、omlegal obligations.This British Standard was published under the authority of theStandards Policy and Strategy Committee on 31 October 2012. Amendments issued since publicationDate T e x t a f f e c t e dBS EN 14587-3:2012EUROPEAN STANDARD NORME EUROPENNE EUROPISCHE NORM EN 14587-3 September 2012 I
5、CS 25.160.10; 93.100 English Version Railway applications - Track - Flash butt welding of rails - Part 3: Welding in association with crossing construction Applications ferroviaires - Voie - Soudage des rails par tincelage - Partie 3: Soudure associe la fabrication des coeurs de voie Bahnanwendungen
6、 - Oberbau - Abbrennstumpfschweien von Schienen - Teil 3: Schweien im Zusammenhang mit Herzstckkonstruktionen This European Standard was approved by CEN on 6 July 2012. CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European S
7、tandard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC Management Centre or to any CEN member. This European Standard exists in three official versions (Eng
8、lish, French, German). A version in any other language made by translation under the responsibility of a CEN member into its own language and notified to the CEN-CENELEC Management Centre has the same status as the official versions. CEN members are the national standards bodies of Austria, Belgium,
9、 Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerlan
10、d, Turkey and United Kingdom. EUROPEAN COMMITTEE FOR STANDARDIZATION COMIT EUROPEN DE NORMALISATION EUROPISCHES KOMITEE FR NORMUNG Management Centre: Avenue Marnix 17, B-1000 Brussels 2012 CEN All rights of exploitation in any form and by any means reserved worldwide for CEN national Members. Ref. N
11、o. EN 14587-3:2012: EBS EN 14587-3:2012EN 14587-3:2012 (E) 2 Contents Page Foreword 4Introduction .51 Scope 62 Normative references 63 Terms and definitions .64 Information to be supplied for approval of procedure.84.1 By the purchaser84.2 By the manufacturer 85 Approval of the manufacturer 85.1 Gen
12、eral 85.2 Welding procedure 85.3 Operators 95.4 Supervision 95.5 Weld Inspection .95.6 Equipment 95.7 Quality assurance 96 Requirements for the welding process .96.1 General 96.2 Workpiece preparation 96.3 Clamping force 106.4 Initial burn-off 106.5 Preheating . 106.6 Final flashing . 106.7 Upsettin
13、g . 106.8 Post-weld treatment 116.8.1 Before unclamping . 116.8.2 After removal from machine 116.9 Welding parameters . 116.10 Removal of upset and correction of weld alignment 117 Profile finishing of the weld . 118 Weld geometry and dimensions 128.1 General . 128.2 Alignment and flatness across th
14、e weld 128.3 Foot dimensions . 139 Weld identification 1310 Procedure approval 1310.1 General . 1310.2 Test weld specimen preparation . 1410.3 Number of specimens 1410.4 Approval tests . 1410.4.1 General . 1410.4.2 Weld geometry and dimensions 1410.4.3 Visual inspection 1410.4.4 Surface finish 1410.
15、4.5 Liquid penetrant testing and magnetic particle testing 1410.4.6 Internal soundness . 1510.4.7 Bend testing 1510.4.8 Fatigue testing 1510.4.9 Macro-examination . 15BS EN 14587-3:2012EN 14587-3:2012 (E) 3 10.4.10 Micro-examination . 1610.4.11 Hardness testing 1610.5 Test result report . 1710.6 Val
16、idity of approval 1711 Approval of other rail profiles or grades . 1711.1 General 1711.2 Sample preparation . 1711.3 Approval tests 1711.4 Test result report . 1812 Track trials 1812.1 General 1812.2 Track trial test result report 1813 Weld production following procedure approval . 1813.1 Weld produ
17、ction 1813.2 Weld parameter monitoring 1813.3 Visual inspections . 1813.4 Weld geometry and dimensions 1913.5 Liquid penetrant testing and magnetic particle testing . 1913.6 Internal soundness 1913.7 Bend Testing 1913.7.1 General 1913.7.2 Additional test requirements 1913.7.3 Bend test procedure 191
18、3.7.4 Interpretation of results 2013.7.5 Retesting 2013.7.6 Documentation . 20Annex A (informative) Example of Flat spot and Bright spot . 21Annex B (normative) Bend test requirements 22Annex C (normative) Test weld fracture faces Recording of defects . 24Annex D (normative) Fatigue test method for
19、flash butt welds . 26D.1 Scope 26D.2 Test equipment 26D.3 Calibration procedure . 28D.3.1 General 28D.3.2 Test piece . 28D.3.3 Test piece preparation 28D.3.4 Instrumentation 28D.3.5 Procedure . 28D.4 Fatigue test method . 32D.4.1 General 32D.4.2 Staircase testing method 32D.4.3 Example of the data a
20、nalysis of a fatigue strength determination by the staircase method 35D.4.4 Past-the-post testing method . 35Annex E (normative) Macro-examination and micro-examination. 37E.1 Macro examination 37E.2 Micro examination . 37Annex F (normative) Hardness testing . 39Annex G (normative) Ultrasonic testin
21、g non-austenitic materials . 40G.1 Reference line (DAC) generation Reference block . 40G.2 Reference line (DAC) generation and acceptance criteria 40Bibliography 42BS EN 14587-3:2012EN 14587-3:2012 (E) 4 Foreword This document (EN 14587-3:2012) has been prepared by Technical Committee CEN/TC 256 “Ra
22、ilway applications”, the secretariat of which is held by DIN. This European Standard shall be given the status of a national standard, either by publication of an identical text or by endorsement, at the latest by March 2013, and conflicting national standards shall be withdrawn at the latest by Mar
23、ch 2013. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. CEN and/or CENELEC shall not be held responsible for identifying any or all such patent rights. This document has been prepared under a mandate given to CEN by the European
24、Commission and the European Free Trade Association. This document is one of a series of three parts of the EN 14587 “Railway applications Track Flash butt welding of rails”. The list of parts is as follows: Part 1: New R220, R260, R260Mn and R350HT grade rails in a fixed plant Part 2: New R220, R260
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BSEN1458732012RAILWAYAPPLICATIONSTRACKFLASHBUTTWELDINGOFRAILSWELDINGINASSOCIATIONWITHCROSSINGCONSTRUCTION