ASTM F1762-2007 Standard Practice for Exposing a Membrane Switch to Variation in Atmospheric Pressure《将薄膜开关暴露于变化的大气压下的标准实施规范》.pdf
《ASTM F1762-2007 Standard Practice for Exposing a Membrane Switch to Variation in Atmospheric Pressure《将薄膜开关暴露于变化的大气压下的标准实施规范》.pdf》由会员分享,可在线阅读,更多相关《ASTM F1762-2007 Standard Practice for Exposing a Membrane Switch to Variation in Atmospheric Pressure《将薄膜开关暴露于变化的大气压下的标准实施规范》.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F 1762 07Standard Practice forExposing a Membrane Switch to Variation in AtmosphericPressure1This standard is issued under the fixed designation F 1762; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last
2、revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers a procedure for exposing a mem-brane switch to variations in atmospheric pressure. It can beused to d
3、etermine the effects of pressure variations on chemicaland mechanical properties and functional characteristics of theswitch.2. Terminology2.1 Definitions:2.1.1 circuit resistanceelectrical resistance as measuredbetween two test points whose internal contacts, when heldclosed, complete a circuit.2.1
4、.2 contact closurethe event at which a specified resis-tance is achieved on a membrane switch.2.1.3 membrane switcha momentary switching device inwhich at least one contact is on, or made of, a flexiblesubstrate.2.1.4 specified resistancethe maximum allowable circuitresistance as measured between tw
5、o test points whose internalcontacts, when held closed, complete a circuit.2.1.5 test pointstwo preselected conductive points in acircuit loop, possibly including a switch.3. Significance and Use3.1 Erratic operation or malfunction of a membrane switchresulting from changes in the specified switch c
6、haracteristics,3.2 Rupture, implosion or explosion of seals due to pressurevariations,3.3 Change in physical or chemical properties due to pres-sure differentiations, and3.4 Delaminations of a membrane switch may occur due topressure variations.4. Interferences4.1 Time duration before, during and af
7、ter pressure cycling,4.2 Temperature,4.3 Humidity,4.4 Mounting Method (if applicable).5. Apparatus5.1 Pressure Chamber, a chamber or cabinet capable ofmaintaining a specified pressure. If procedurally required, theapparatus shall be capable of providing pressure variation at aspecified rate.5.2 Moni
8、toring Device, suitable to detect contact closure(that is, ohm meter, etc.).6. Conditioning6.1 Condition all specimens for 72 h at ambient laboratoryconditions immediately prior to exposure, or prior to pressurecycling. This is to enable the specimens to stabilize.7. Procedure7.1 Pretest Setup:7.1.1
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF17622007STANDARDPRACTICEFOREXPOSINGAMEMBRANESWITCHTOVARIATIONINATMOSPHERICPRESSURE 薄膜开关 暴露 变化 大气

链接地址:http://www.mydoc123.com/p-535581.html