ASTM E882-1987(2003) Standard Guide for Accountability and Quality Control in the Chemical Analysis Laboratory《在化学分析实验室中的职责和质量控制》.pdf
《ASTM E882-1987(2003) Standard Guide for Accountability and Quality Control in the Chemical Analysis Laboratory《在化学分析实验室中的职责和质量控制》.pdf》由会员分享,可在线阅读,更多相关《ASTM E882-1987(2003) Standard Guide for Accountability and Quality Control in the Chemical Analysis Laboratory《在化学分析实验室中的职责和质量控制》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: E 882 87 (Reapproved 2003)Standard Guide forAccountability and Quality Control in the ChemicalAnalysis Laboratory1This standard is issued under the fixed designation E 882; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revisio
2、n, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This guide covers the essential aspects of an account-ability and quality control program for a chemic
3、al analysislaboratory. The reasons for establishing and operating such aprogram are discussed.2. Referenced Documents2.1 ASTM Standards:MNL 7 Manual on Presentation of Data and Control ChartAnalysis22.2 ANSI Document:ANSI/ASQC A1 Definitions, Symbols, Formulas, andTables for Control Charts33. Signif
4、icance and Use3.1 An accountability and quality control system is estab-lished by laboratory management to improve the quality of itsresults. It provides documented records which serve to assureusers of the laboratorys services that a specified level ofprecision is achieved in the routine performanc
5、e of its mea-surements and that the data reported were obtained from thesamples submitted. The system also provides for: early warn-ing to analysts when methods or equipment begin to develop abias or show deterioration of precision; the protection andretrievability of data (results); traceability an
6、d control ofsamples as they are processed through the laboratory; goodcommunication of sample information between submitters,analysts, and supervision; and information on sample process-ing history. This guide describes such a system. Other account-ability and quality control programs can be develop
7、ed. Suchprograms can be equivalent to the program in this guide if theyprovide all of the benefits mentioned above.4. Accountability4.1 Accountability means assurance that the results reportedrefer directly to the samples submitted.4.2 Prior to submitting samples to the laboratory, the pro-spective
8、user should consult with laboratory personnel con-cerning his needs and the capability of the laboratory to satisfythem. It is the responsibility of the originator of the samples toselect and identify proper samples for submission to thelaboratory, to decide what information is required (especially,
9、to define the use to be made of the information), and, afterconsulting with laboratory personnel, to submit the samples insuitable containers, properly labeled, and accompanied bywritten instructions identifying the samples, their nature, andthe information sought through chemical analysis. This sho
10、uldbe done formally, using a well-defined document for informa-tion transfer to initiate work in the laboratory.4.3 Laboratory management establishes a written account-ability system to be used throughout the laboratory at all times.This implies traceability and documentation of all reportedresults
11、through the laboratory back to the submitted sample.This system should have the following general characteristics:4.3.1 Each nonroutine job submitted by a user of thelaboratorys services is assigned an internal laboratory identi-fication number (ID), which is used to correlate all samples,work, time
12、 and cost accounting, consultation, and reports andother paperwork associated with that job. The final report thatis returned to the originator will always bear the number (ID)for future reference. Moreover, it is convenient for laboratorydata to be filed according to sequential ID numbers. Forexamp
13、le, “86/0428” might identify the associated work as the428th request submitted in the year 1986. The Data Recordshould provide all data generated during the analyses, names ofpersons performing the analyses, dates the analyses wereperformed, and any unusual occurrences that happened duringthe analys
14、es. Accountability for production control samples isnormally maintained separately from the nonroutine recordsbecause results from production control samples are usuallyreported on routine report forms, the samples being identifiedwith the day, shift, run, or lot from which they were taken.1This gui
15、de is under the jurisdiction of ASTM Committee E01 on AnalyticalChemistry for Metals, Ores, and Related Materials and is the direct responsibility ofSubcommittee E01.22 on Statistics and Quality Control.Current edition approved Oct. 1, 2003. Published November 2003. Originallyapproved in 1982. Last
16、previous edition approved in 1998 as E 882 98.2ASTM Manual Series, ASTM, 6th Edition, 1990.3Available from American National Standards Institute (ANSI), 25 W. 43rd St.,4th Floor, New York, NY 10036.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, U
17、nited States.4.3.2 Each sample, specimen, sample site, or other uniquepiece of material or container identified as a separate sample bythe originator should be assigned a sequential item number(NN) for internal laboratory use. As soon as the samples areaccepted by the laboratory, laboratory personne
18、l will markeach sample or sample container with its own laboratorysample number (ID-NN) in such manner that the label is notlikely to become separated from its sample or renderedunreadable during its residence in the laboratory. For example,the fifth sample on the above-mentioned request might beide
19、ntified as “86/0428-05.”4.3.3 All laboratory work records, intermediate samplecontainers, data, and reports for a specific sample will beidentified by the same laboratory identification and itemnumber to avoid any opportunity for samples or data to be lostor intermixed within or between jobs.4.3.4 T
20、he first and last steps in the accountability procedureare functions of technical supervision. Before any work isperformed, the compatibility of the work requested with thephysical condition of the samples and the capabilities of thelaboratory must be verified. When the analysts have completedtheir
21、work, the results must be reviewed to be certain that allinformation requested has been determined and that the workhas been performed with the required care and precision. Inthis latter regard, quality control procedures prove invaluableboth to the analysts performing the work and the reviewingsupe
22、rvisor. The supervisor also verifies that the results arecalculated in units that are most meaningful to the submitterand that the units and basis on which the results are calculatedare clearly stated.4.3.5 Except for the most routine work, the original ana-lysts data book, a serial listing of labor
23、atory identificationnumbers and descriptions, and a copy of each job report sheetare retained in the laboratorys records for the periods of timeestablished by laboratory policy. Intermediate calculations andsamples are normally discarded after the submitter has had areasonable opportunity to submit
24、questions concerning theresults and request return of his samples. In some cases,customer specifications may dictate the records that must beretained and the retention times for both analytical records andlaboratory samples.5. Quality Control5.1 Quality control of analytical methods provides theinfo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME88219872003STANDARDGUIDEFORACCOUNTABILITYANDQUALITYCONTROLINTHECHEMICALANALYSISLABORATORY 化学分析 实验室

链接地址:http://www.mydoc123.com/p-533720.html