ASTM C1701 C1701M-2017 Standard Test Method for Infiltration Rate of In Place Pervious Concrete《就地透水混凝土入渗率的标准试验方法》.pdf
《ASTM C1701 C1701M-2017 Standard Test Method for Infiltration Rate of In Place Pervious Concrete《就地透水混凝土入渗率的标准试验方法》.pdf》由会员分享,可在线阅读,更多相关《ASTM C1701 C1701M-2017 Standard Test Method for Infiltration Rate of In Place Pervious Concrete《就地透水混凝土入渗率的标准试验方法》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C1701/C1701M 09C1701/C1701M 17Standard Test Method forInfiltration Rate of In Place Pervious Concrete1This standard is issued under the fixed designation C1701/C1701M; the number immediately following the designation indicates theyear of original adoption or, in the case of revision, th
2、e year of last revision. A number in parentheses indicates the year of lastreapproval. A superscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope Scope*1.1 This test method covers the determination of the field water infiltration rate of in place pervious c
3、oncrete.1.2 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in eachsystem may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from thetwo systems may result in non-confor
4、mance with the standard.1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibilityof the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatorylimitations prior
5、to use.1.4 The text of this standard references notes that provide explanatory material. These notes shall not be considered asrequirements of the standard.1.5 This international standard was developed in accordance with internationally recognized principles on standardizationestablished in the Deci
6、sion on Principles for the Development of International Standards, Guides and Recommendations issuedby the World Trade Organization Technical Barriers to Trade (TBT) Committee.2. Referenced Documents2.1 ASTM Standards:2C125 Terminology Relating to Concrete and Concrete AggregatesC920 Specification f
7、or Elastomeric Joint Sealants2.2 Other StandardsFederal Specification A-A-3110 (TT-P-1536A) Plumbing Fixture Setting Compound33. Terminology3.1 Definitions:3.1.1 The terms used in this test method are defined in Terminology C125.4. Summary of Test Method4.1 An infiltration ring is temporarily sealed
8、 to the surface of a pervious pavement. After prewetting the test location, a givenmass of water is introduced into the ring and the time for the water to infiltrate the pavement is recorded. The infiltration rate iscalculated in accordance with 9.1.5. Significance and Use5.1 Tests performed at the
9、same location across a span of years may be used to detect a reduction of infiltration rate of thepervious concrete, thereby identifying the need for remediation.5.2 The infiltration rate obtained by this method is valid only for the localized area of the pavement where the test is conducted.To dete
10、rmine the infiltration rate of the entire pervious pavement multiple locations must be tested and the results averaged.1 This test method is under the jurisdiction of ASTM Committee C09 on Concrete and Concrete Aggregates and is the direct responsibility of Subcommittee C09.49 onPervious Concrete.Cu
11、rrent edition approved Aug. 1, 2009March 1, 2017. Published September 2009April 2017. DOI: 10.1520/C1701_C1701M-09.Originally approved in 2009. Last previousedition approved in 2009 as C1701/C1701M 09 .DOI: 10.1520/C1701_C1701M-17.2 For referencedASTM standards, visit theASTM website, www.astm.org,
12、or contactASTM Customer Service at serviceastm.org. For Annual Book of ASTM Standardsvolume information, refer to the standards Document Summary page on the ASTM website.3 http:/This document is not an ASTM standard and is intended only to provide the user of an ASTM standard an indication of what c
13、hanges have been made to the previous version. Becauseit may not be technically possible to adequately depict all changes accurately, ASTM recommends that users consult prior editions as appropriate. In all cases only the current versionof the standard as published by ASTM is to be considered the of
14、ficial document.*A Summary of Changes section appears at the end of this standardCopyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States15.3 The field infiltration rate is typically established by the design engineer of record and is a functi
15、on of the design precipitationevent.5.4 This test method does not measure the influence on in-place infiltration rate due to sealing of voids near the bottom of thepervious concrete slab. Visual inspection of concrete cores is the best approach for determining sealing of voids near the bottomof the
16、pervious concrete slab.6. Apparatus6.1 Infiltration RingA cylindrical ring, open at both ends (See Fig. 1). The ring shall be watertight, sufficiently rigid to retainits form when filled with water, and shall have a diameter of 300 6 10 mm 12.0 6 0.5 in. with a minimum height of 50 mm2.0 in. The bot
17、tom edge of the ring shall be even. The inner surface of the ring shall be marked or scored with two lines at adistance of 10 and 15 mm 0.40 and 0.60 in. from the bottom of the ring. Measure and record the inner diameter of the ring tothe nearest 1 mm 0.05 in.NOTE 1Ring materials that have been foun
18、d to be suitable include steel, aluminum, rigid plastic, and PVC.6.2 BalanceA balance or scale accurate to 10 g 0.02 lb.6.3 ContainerAcylindrical container typically made of plastic having a volume of at least 20 L 5 gal, and from which watermay be easily poured at a controlled rate into the infiltr
19、ation ring.6.4 Stop WatchAccurate to 0.1 s.6.5 Plumbers Putty (Non-Hardening)Meeting Specification C920 or Federal Specification A-A-3110.6.6 WaterPotable water.7. Test Locations7.1 Perform tests at multiple locations at a site as requested by the purchaser of testing services. Unless otherwise spec
20、ified, usethe following to determine the number of tests to perform:7.1.1 Three test locations for areas up to 2,500 m2 25,000 ft2.7.1.2 Add one test location for each additional 1,000 m2 10,000 ft2 or fraction thereof.7.2 Provide at least 1 m 3 ft clear distance between test locations, unless at le
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC1701C1701M2017STANDARDTESTMETHODFORINFILTRATIONRATEOFINPLACEPERVIOUSCONCRETE 就地 透水 混凝土 入渗 标准 试验

链接地址:http://www.mydoc123.com/p-465578.html