ASTM A254-1997(2007) Standard Specification for Copper-Brazed Steel Tubing《铜焊钢管规格的标准规范》.pdf
《ASTM A254-1997(2007) Standard Specification for Copper-Brazed Steel Tubing《铜焊钢管规格的标准规范》.pdf》由会员分享,可在线阅读,更多相关《ASTM A254-1997(2007) Standard Specification for Copper-Brazed Steel Tubing《铜焊钢管规格的标准规范》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: A 254 97 (Reapproved 2007)Standard Specification forCopper-Brazed Steel Tubing1This standard is issued under the fixed designation A 254; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A num
2、ber in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.This standard has been approved for use by agencies of the Department of Defense.1. Scope1.1 This specification covers double-wall, copper-brazedstee
3、l tubing suitable for general engineering uses, particularlyin the automotive, refrigeration, and stove industries for fuellines, brake lines, oil lines, heating and cooling units, and thelike.1.2 The values stated in inch-pound units are to be regardedas the standard.2. Referenced Documents2.1 ASTM
4、 Standards:2A 370 Test Methods and Definitions for Mechanical Testingof Steel ProductsE30 Test Methods for Chemical Analysis of Steel, CastIron, Open-Hearth Iron, and Wrought Iron3E59 Practice for Sampling Steel and Iron for Determinationof Chemical Composition32.2 Society of Automotive Engineers St
5、andard:J 533 Flares for Tubing43. Ordering Information3.1 Orders for material under this specification shouldinclude the following, as required to describe the desiredmaterial adequately:3.1.1 Quantity (feet, metres),3.1.2 Name of material (copper-brazed steel tubing),3.1.3 Type, where necessary (se
6、e Fig. 1) (normally the typeis not specified),3.1.4 Size (outside diameter and wall thickness; normallyinside diameter should not be specified),3.1.5 Length (specific or random),3.1.6 Inside surface cleanliness where required (see Section8),3.1.7 External coating, where required (see Section 7 andSu
7、pplementary Requirement S2), and3.1.8 Special or supplementary requirements or exceptionsto specification.4. Manufacture4.1 The steel may be made by any process.4.2 If a specific type of melting is required by the purchaser,it shall be as stated on the purchase order.4.3 The primary melting may inco
8、rporate separate degas-sing or refining and may be followed by secondary melting,such as electroslag remelting or vacuum-arc remelting. Ifsecondary melting is employed, the heat shall be defined as allof the ingots remelted from a single primary heat.4.4 Steel may be cast in ingots or may be strand
9、cast. Whensteel of different grades is sequentially strand cast, identifica-tion of the resultant transition material is required. Theproducer shall remove the transition material by an establishedprocedure that positively separates the grades.4.5 The tubing shall be made by rolling steel strip into
10、 theform of tubing and subsequently copper brazing in a reducingatmosphere.4.6 Tubing shall be constructed as shown in Fig. 1.4.7 Tubing shall be suitably tested after brazing by themanufacturer to ensure freedom from leaks and detrimentalflaws.5. Chemical Composition5.1 The steel shall conform to t
11、he requirements as tochemical composition prescribed in Table 1.5.2 Heat AnalysisAn analysis of each heat of steel shallbe made by the steel manufacturer to determine the percentagesof the elements specified. If secondary melting processes areemployed, the heat analysis shall be obtained from one1Th
12、is specification is under the jurisdiction of ASTM Committee A01 on Steel,Stainless Steel and Related Alloys and is the direct responsibility of SubcommitteeA01.09 on Carbon Steel Tubular Products.Current edition approved Nov. 1, 2007. Published January 2008. Originallyapproved in 1944. Last previou
13、s edition approved in 2002 as A 254 97(2002).2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Withdrawn.4Avai
14、lable from American Society of Mechanical Engineers (ASME), ASMEInternational Headquarters, Three Park Ave., New York, NY 10016-5990, http:/www.asme.org.Single-Strip Type Double-Strip TypeFIG. 1 Brazed Tubing, Double-Wall, 360-deg Brazed Construction1Copyright ASTM International, 100 Barr Harbor Dri
15、ve, PO Box C700, West Conshohocken, PA 19428-2959, United States.remelted ingot or the product of one remelted ingot of eachprimary melt. The chemical composition thus determined, orthat determined from a product analysis made by the tubularproduct manufacturer shall conform to the requirements spec
16、i-fied.5.3 Product AnalysisTubing of this quality is commonlyproduced in rimmed or capped steel which is characterized bya lack of uniformity in its chemical composition. For thisreason, rejection for product analysis is not appropriate unlessmisapplication is clearly indicated.5.4 Methods of Analys
17、isMethods described in Test Meth-ods E30shall be used for referee purposes. Due allowanceshall be made for the presence of copper brazing metal.5.5 Samples for Product AnalysisExcept for spectro-graphic analysis, samples shall be taken in accordance withPractice E59.6. Mechanical Requirements Mechan
18、ical Requirements6.1 Tension TestTensile properties of tubing as manufac-tured (prior to cold working) shall conform to the requirementsspecified in Table 2.6.1.1 The specimens and tension tests required shall bemade in accordance with Test Methods and Definitions A 370.6.1.2 Specimens shall be test
19、ed at room temperature.6.1.3 Test specimens shall be taken from the ends offinished tubes prior to upsetting, swaging, expanding, or otherforming operations, or being cut to length. They shall besmooth on the ends and free from burrs and flaws.6.1.4 If any test specimen shows flaws or defective mach
20、in-ing, it may be discarded and another specimen substituted.6.1.5 The yield strength shall be determined as that corre-sponding to a permanent offset of 0.2 % of the gage length ofthe specimen, or a total extension of 0.5 % of the gage lengthunder load.6.1.6 If the percentage of elongation of any t
21、est specimen isless than that specified and any part of the fracture is more than34 in. (19.0 mm) from the center of the gage length, asindicated by scribe marks on the specimen before testing, aretest shall be allowed.6.2 Flattening TestA section of tubing, not less than 212in. (64 mm) in length, s
22、hall stand being flattened betweenparallel plates until the inside walls are in contact withoutcracking or otherwise showing flaws.6.3 Expansion TestA section of tubing approximately 4in. (100 mm) in length shall stand being expanded over atapered mandrel having a slope of 1 in 10 until the outsided
23、iameter at the expanded end is increased 20 % withoutcracking or otherwise showing flaws. (Prior to the expansiontest, tubing shall be cut off square, edge crowned, anddeburred. It shall be held firmly and squarely in the die, andpunch must be guided on the axis of the tubing.)6.4 Bend TestThe finis
24、hed tubing shall stand bending on acenterline radius equal to three times the tubing outsidediameter without kinking, cracking, or developing other flawswhere proper bending fixtures are used.6.5 Pressure Proof TestsEach tube shall be capable ofwithstanding, without bursting or leaking, either of th
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMA25419972007STANDARDSPECIFICATIONFORCOPPERBRAZEDSTEELTUBING 铜焊 钢管 规格 标准规范 PDF

链接地址:http://www.mydoc123.com/p-457831.html