1、ASME AG-1 INTERPRETATIONSI-1ASME AG-1INTERPRETATIONSReplies to Technical InquiriesJune 2012 Through December 2013FOREWORDThis publication includes all of the written replies issued between the indicated dates by the Secretary,speaking for the ASME Committee on Nuclear Air and Gas Treatment Equipment
2、, to inquiries concerninginterpretations of technical aspects of ASME AG-1, Code on Nuclear Air and Gas Treatment.These interpretations were prepared in accordance with the accredited ASME procedures. ASME proce-dures provide for reconsideration of these interpretations when or if additional informa
3、tion is available thatthe inquirer believes might affect the interpretation. Further, persons aggrieved by this interpretation mayappeal to the cognizant ASME Committee or Subcommittee. ASME does not “approve,” “certify,” “rate,”or “endorse” any item, construction, proprietary device, or activity.An
4、 interpretation applies to the edition or addenda stated in the interpretation itself, or, if none is stated,to the latest published edition at the time it is issued. Subsequent revisions to the rules may have supersededthe reply.For detailed instructions on the preparation of technical inquiries, r
5、efer to the Preparation of TechnicalInquiries to the Committee on Nuclear Air and Gas Treatment in Mandatory Appendix I of AG-12015.I-2INTENTIONALLY LEFT BLANKASME AG-1 INTERPRETATIONSI-3Interpretation: 15-1Subject: AWS D1.6 Reference (ASME AG-12009 Edition Through the 2011 Addenda, and allearlier E
6、ditions and Addenda, Section AA, AA-6310, Welding RequirementsParagraph)Date Issued: June 28, 2012File: 11-460Question: Should AA-6310(k)(1) qualifications reference AWS D1.6, Structural Welding Code Stainless Steel?Reply: Yes.Interpretation: 15-2Subject: Ribbon Spacers in a Radial Flow Filter ASME
7、AG-12003 Edition through the 2011Addenda, FK-4130(d) and FK-5130Date Issued: June 28, 2012File: 12-198Question: Does movement of the ribbon spacers intended to serve as spacers to prevent contact betweenthe edge of pleats and the protective screening in a radial flow filter constitute failure of the
8、 qualificationprocess?Reply: Yes.Interpretation: 15-3Subject: Fluid Momentum Loads (FML) in Ductwork and Housings Design (ASME AG-12009Edition Through the 2011 Addenda, and all earlier Editions and Addenda, ArticlesAA-4000, SA-4000, and HA-4000)Date Issued: July 12, 2012File: 10-2105Question: Can CO
9、NAGT clarify the input requirements and analytical methods to quantify fluidmomentum loads (FML) in ductwork and housings design?Reply: The intent was clarified by changes made in the ASME AG-12012 Edition.ASME AG-1 INTERPRETATIONSI-4Interpretation: 15-4Subject: Safety-Related Fans (ASME AG-12003 Ed
10、ition)Date Issued: March 15, 2013File: 13-110Question (1): As per BA-4160, safety-related fans in nuclear power plants shall meet the vibrationlimits for both shop test and field test conditions or for shop test only?Reply (1): Safety-related fans in nuclear power plants shall meet the vibration lim
11、its during shop testsand after installation in accordance with BA-4160.Question (2): As per BA-4160, safety-related fans installed in AHU (air-handling unit) housing, ACU(air-cleaning unit) housing, or cubicle cooler (CC) housing shall meet the vibration limits?Reply (2): Yes. Safety-related fans in
12、stalled in AHU, ACU, or CC housings shall meet the vibrationlimits listed in BA-4160.Interpretation: 15-5Subject: Resistance to Pressure (ASME AG-1b2011 Addenda)Date Issued: August 8, 2013File: 13-1316Question: Shall the rate of airborne water droplets flowing toward the face of the filter under tes
13、t beallowed to fluctuate throughout the duration of the test?Reply: Yes.Interpretation: 15-6Subject: Thermal Loads (ASME AG-12012 Edition, and all earlier Editions and Addenda,Article AA-4000)Date Issued: August 15, 2013File: 11-2159Question (1): Article AA-4000 describes “constraint of free end dis
14、placement loads” as T, but internalthermal loading is not identified. Similarly, Article HA-4000 does not identify internal thermal gradientsas a loading condition. Are internal thermal gradients required to be evaluated for service loads A and Busing the increased allowable permitted for secondary
15、stress?Reply (1): Yes. Table AA-4212 states that thermal loads shall be considered for service loads A andB. Table AA-4321 states that a stress increase is permitted for thermal gradient stresses across the thicknessof the material only. Linear thermal stress (i.e., axial expansion or free end displ
16、acement) is not allowedan increase.Question (2): If the operating temperature is less than 150 F, normal engineering practice is to ignorethermal. If thermal gradient is less than 80 F, does ASME AG-1 require thermal gradients to be evaluatedabove this threshold?Reply (2): Yes.ASME AG-1 INTERPRETATI
17、ONSI-5Interpretation: 15-7Subject: Faceguards (ASME AG-12012 Edition, and all earlier Editions and Addenda)Date Issued: December 3, 2013File: 13-1231Question: Is it acceptable to utilize an expanded diamond-shaped faceguard instead of the 4 4 meshas specified in FC-3140?Reply: Yes. The utilization o
18、f an expanded diamond-shaped faceguard instead of the 4 4 meshfaceguard is compliant based on FC-3210, Alternate Materials, as long as(a) the pattern of the expanded diamond-shaped faceguard provides the intended protection to themedia pack from incidental contact.(b) the strand thickness and width
19、meets the minimum requirements specified in FC-3140.(c) it has been qualified in a filter design, in accordance with Article FC-5000, as required by FC-3210.(d) the faceguard edges shall also be installed such that there are no wires or edges that create a mediapuncture hazard or project from the pe
20、rimeter of the filter. Edges formed when slitting or shearing faceguardsshall be smoothed on both surfaces of the material before installation, or otherwise covered.I-6INTENTIONALLY LEFT BLANKASME AG-1 INTERPRETATIONSI-1ASME AG-1INTERPRETATIONSReplies to Technical InquiriesNovember 2006 Through Marc
21、h 2010FOREWORDThis publication includes all of the written replies issued between the indicated dates by the Secretary,speaking for the ASME Committee on Nuclear Air and Gas Treatment Equipment, to inquiries concerninginterpretations of technical aspects of ASME AG-12009, Code on Nuclear Air and Gas
22、 Treatment.These interpretations were prepared in accordance with the accredited ASME procedures. ASME proce-dures provide for reconsideration of these interpretations when or if additional information is availablewhich the inquirer believes might affect the interpretation. Further, persons aggrieve
23、d by this interpretationmay appeal to the cognizant ASME Committee or Subcommittee. ASME does not “approve,” “certify,”“rate,” or “endorse” any item, construction, proprietary device, or activity.An interpretation applies to the edition or addenda stated in the interpretation itself, or, if none is
24、stated,to the latest published edition and addenda at the time it is issued. Subsequent revisions to the rules mayhave superseded the reply.For detailed instructions on the preparation of technical inquiries, refer to the Preparation of TechnicalInquiries to the Committee on Nuclear Air and Gas Trea
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASMEAG1INTERPRETATIONS2013INTERPRETATIONSTOASMEAG1INCLUDESINTERPRETATIONSJUNE2012THROUGHDECEMBER2013PDF

链接地址:http://www.mydoc123.com/p-456155.html