ASHRAE GUIDELINE 11-2009 Field Testing of HVAC Controls Components《HVAC控制组件现场测试》.pdf
《ASHRAE GUIDELINE 11-2009 Field Testing of HVAC Controls Components《HVAC控制组件现场测试》.pdf》由会员分享,可在线阅读,更多相关《ASHRAE GUIDELINE 11-2009 Field Testing of HVAC Controls Components《HVAC控制组件现场测试》.pdf(30页珍藏版)》请在麦多课文档分享上搜索。
1、ASHRAE GUIDELINEASHRAE Guideline 11-2009Approved by the ASHRAE Standards Committee on July 20, 2009, and by the ASHRAE Board of Directors onJuly 24, 2009. ASHRAE Guidelines are updated on a five-year cycle; the date following the Guideline is the year of approval.The latest edition of an ASHRAE Guid
2、eline may be purchased from ASHRAE Customer Service, 1791 TullieCircle, NE, Atlanta, GA 30329-2305. E-mail: ordersashrae.org. Fax: 404-321-5478. Telephone: 404-636-8400 (worldwide) or toll free 1-800-527-4723 (for orders in US and Canada). Copyright 2009 American Society of Heating, Refrigerating an
3、d Air-Conditioning Engineers, Inc.ISSN 1049-894XAmerican Society of Heating, Refrigeratingand Air-Conditioning Engineers, Inc.1791 Tullie Circle NE, Atlanta, GA 30329www.ashrae.orgField Testing of HVAC Controls ComponentsASHRAE STANDARDS COMMITTEE 20082009Hugh F. Crowther, ChairSteven T. Bushby, Vic
4、e-ChairRobert G. BakerMichael F. BedaDonald L. BrandtPaul W. CabotKenneth W. CooperSamuel D. Cummings, Jr.K. William DeanMartin DieryckxRobert G. DoerrAllan B. FraserNadar R. JayaramanByron W. JonesJay A. KohlerCarol E. MarriottMerle F. McBrideFrank MyersH. Michael NewmanJanice C. PetersonDouglas T.
5、 ReindlLawrence J. SchoenBoggarm S. SettyBodh R. SubherwalWilliam F. WalterMichael W. WoodfordDavid E. Knebel, BOD ExOAndrew K. Persily, COStephanie Reiniche, Manager of StandardsDISCLAIMERASHRAE uses its best efforts to promulgate Standards and Guidelines for the benefit of the public in light of a
6、vailable information andaccepted industry practices. However, ASHRAE does not guarantee, certify, or assure the safety or performance of any products, components,or systems tested, installed, or operated in accordance with ASHRAEs Standards or Guidelines or that any tests conducted under itsStandard
7、s or Guidelines will be nonhazardous or free from risk.ASHRAE INDUSTRIAL ADVERTISING POLICY ON STANDARDSASHRAE Standards and Guidelines are established to assist industry and the public by offering a uniform method of testing for ratingpurposes, by suggesting safe practices in designing and installi
8、ng equipment, by providing proper definitions of this equipment, and by providingother information that may serve to guide the industry. The creation of ASHRAE Standards and Guidelines is determined by the need for them,and conformance to them is completely voluntary.In referring to this Standard or
9、 Guideline and in marking of equipment and in advertising, no claim shall be made, either stated or implied,that the product has been approved by ASHRAE.ASHRAE Guideline Project Committee 11Cognizant TC: TC 7.7, Testing and BalancingSPLS Liaison: Byron W. JonesCarl N. Lawson, Chair* Mark C. Hegberg*
10、David E. Bornside* Richard D. Hermans*Barry B. Bridges* Gerald J. Kettler*Chad B. Dorgan* John P. Kettler*Denotes members of voting status when the document was approved for publicationSPECIAL NOTEThis Guideline was developed under the auspices of the American Society of Heating, Refrigerating and A
11、ir-Conditioning Engineers(ASHRAE). ASHRAE Guidelines are developed under a review process, identifying a guideline for the design, testing, application, or evaluationof a specific product, concept, or practice. As a guideline it is not definitive but encompasses areas where there may be a variety of
12、 approaches,none of which must be precisely correct. ASHRAE Guidelines are written to assist professionals in the area of concern and expertise ofASHRAEs Technical Committees and Task Groups.ASHRAE Guidelines are prepared by project committees appointed specifically for the purpose of writing Guidel
13、ines. The projectcommittee chair and vice-chair must be members of ASHRAE; while other committee members may or may not be ASHRAE members, allmust be technically qualified in the subject area of the Guideline.Development of ASHRAE Guidelines follows procedures similar to those for ASHRAE Standards e
14、xcept that (a) committee balance isdesired but not required, (b) an effort is made to achieve consensus but consensus is not required, (c) Guidelines are not appealable, and(d) Guidelines are not submitted to ANSI for approval.The Manager of Standards of ASHRAE should be contacted for:a. interpretat
15、ion of the contents of this Guideline,b. participation in the next review of the Guideline,c. offering constructive criticism for improving the Guideline, ord. permission to reprint portions of the Guideline.CONTENTSASHRAE Guideline 11-2009Field Testing of HVAC Controls ComponentsSECTION PAGEForewor
16、d. 21 Purpose 22 Scope . 23 Definitions. 24 General Format for Testing 25 Device TestingBasic Requirements 36 System Component Testing . 157 Sequence of Operation. 218 Problem Solving/Critical Testing. 229 Documentation . 2310 References . 23Annex ATest Forms 23Annex BTuning PI Controllers. 26NOTEWh
17、en addenda, interpretations, or errata to this guideline have been approved, they can be downloaded free of charge from the ASHRAE Web site at www.ashrae.org/technology. Copyright 2009 American Society of Heating,Refrigerating and Air-Conditioning Engineers, Inc.1791 Tullie Circle NEAtlanta, GA 3032
18、9www.ashrae.orgAll rights reserved.2 ASHRAE Guideline 11-2009(This foreword is not a part of this guideline. It is merelyinformative and does not contain requirements necessaryfor conformance to the guideline.)FOREWORDThis guideline is intended to supplement several relatedASHRAE guidelines and stan
19、dards, including ASHRAE Stan-dard 111-2008, Measurement, Testing, Adjusting, and Balanc-ing of Building HVAC Systems; ASHRAE Guideline 0-2005,The Commissioning Process; and ASHRAE Guideline 1.1-2007, HVAC repeatability and stability testing (TIER 2);and diagnostic quantitative testing (TIER 3).Note:
20、 Unless specified by the designer that tier 2 or tier 3requirements are necessary for basic system verification, tier 1is the normal expected level to be performed.TIER 1: Installation Verification and Basic Perfor-mance Testing. Design, submittals, and installation of devicesand sub-systems are exa
21、mined to assure proper sizing, selec-tion and installation of a device or system. Sensor outputsignals (temperature, pressure, flow, humidity, etc.) aremeasured with a calibrated instrument to determine the accu-racy of the installed device or system and to verify simpleresponse under normal operati
22、ng conditions. Sensors arechecked at or near normal operating conditions. Sequence andproper operation of system components are checked forcorrect direction of travel and full-required travel range inexpected modes of operation.TIER 2: Repeatability and Stability Testing. Thestability and repeatabil
23、ity of the device or system aremeasured against a calibrated standard. Sensitivity and accu-racy may be checked over the entire sensing range of thedevice. The required accuracy, the number and location of testASHRAE Guideline 11-2009 3points, and the number of cycles may be specified by thedesigner
24、.TIER 3: Diagnostic Quantitative Testing. This requiresperformance tests or simulations that provide system anddevice performance curves, time constants, hysteresis curves,and other related response criteria to provide diagnostic infor-mation. Some systems that are not performing as intendedmay requ
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASHRAEGUIDELINE112009FIELDTESTINGOFHVACCONTROLSCOMPONENTSHVAC 控制 组件 现场 测试 PDF

链接地址:http://www.mydoc123.com/p-454871.html