ASCE 67-17-2017 Schedule Delay Analysis.pdf
《ASCE 67-17-2017 Schedule Delay Analysis.pdf》由会员分享,可在线阅读,更多相关《ASCE 67-17-2017 Schedule Delay Analysis.pdf(34页珍藏版)》请在麦多课文档分享上搜索。
1、ASCE STANDARDANSI/ASCE/CI67-17Schedule Delay AnalysisASCE STANDARD ANSI/ASCE/CI67-17Schedule DelayAnalysisPUBLISHED BY THE AMERICAN SOCIETY OF CIVIL ENGINEERSLibrary of Congress Cataloging-in-Publication DataNames: American Society of Civil Engineers, author.Title: Schedule delay analysis.Descriptio
2、n: Reston, Virginia : American Society of Civil Engineers, 2017 | “ASCESTANDARD ANSI/ASCE/CI 67-17.” | Includes bibliographical references and index.Identiers: LCCN 2017023374 | ISBN 9780784414361 (soft cover : alk. paper) | ISBN9780784480861 (PDF)Subjects: LCSH: BuildingSuperintendenceStandards. |
3、Production schedulingStandards.Classication: LCC TH438.4.A44 2017 | DDC 692dc23 LC record available at https:/lccn.loc.gov/2017023374Published by American Society of Civil Engineers1801 Alexander Bell DriveReston, Virginia, 20191-4382www.asce.org/bookstore | ascelibrary.orgThis standard was develope
4、d by a consensus standards development process that has beenaccredited by the American National Standards Institute (ANSI). Accreditation by ANSI, avoluntary accreditation body representing public and private sector standards developmentorganizations in the United States and abroad, signies that the
5、 standards developmentprocess used by ASCE has met the ANSI requirements for openness, balance, consensus, anddue process.While ASCEs process is designed to promote standards that reect a fair and reasonedconsensus among all interested participants, while preserving the public health, safety, andwel
6、fare that is paramount to its mission, it has not made an independent assessment of anddoes not warrant the accuracy, completeness, suitability, or utility of any information,apparatus, product, or process discussed herein. ASCE does not intend, nor shouldanyone interpret, ASCEs standards to replace
7、 the sound judgment of a competentprofessional, having knowledge and experience in the appropriate eld(s) of practice, norto substitute for the standard of care required of such professionals in interpreting andapplying the contents of this standard.ASCE has no authority to enforce compliance with i
8、ts standards and does not undertake tocertify products for compliance or to render any professional services to any person or entity.ASCE disclaims any and all liability for any personal injury, property damage, nancial loss,or other damages of any nature whatsoever, including without limitation any
9、 direct, indirect,special, exemplary, or consequential damages, resulting from any persons use of, or relianceon, this standard. Any individual who relies on this standard assumes full responsibility forsuch use.ASCE and American Society of Civil EngineersRegistered in U.S. Patent and TrademarkOfce.
10、Photocopies and permissions. Permission to photocopy or reproduce material from ASCEpublications can be requested by sending an e-mail to permissionsasce.org or by locatinga title in ASCEs Civil Engineering Database (http:/cedb.asce.org) or ASCE Library(http:/ascelibrary.org) and using the “Permissi
11、ons” link.Errata: Errata, if any, can be found at https:/doi.org/10.1061/9780784414361.Copyright 2017 by the American Society of Civil Engineers.All Rights Reserved.ISBN 978-0-7844-1436-1 (soft cover)ISBN 978-0-7844-8086-1 (PDF)Manufactured in the United States of America.24 23 22 21 20 19 18 17 1 2
12、 3 4 5ASCE STANDARDSIn 2014, the Board of Direction approved revisions to the ASCERules for Standards Committees to govern the writing andmaintenance of standards developed by ASCE. All such stan-dards are developed by a consensus standards process managedby the ASCE Codes and Standards Committee (C
13、SC). Theconsensus process includes balloting by a balanced standardscommittee and reviewing during a public comment period. Allstandards are updated or reafrmed by the same process everyve to ten years. Requests for formal interpretations shall beprocessed in accordance with Section 7 of ASCE Rules
14、forStandards Committees, which are available at www.asce.org.Errata, addenda, supplements, and interpretations, if any, for thisstandard can also be found at www.asce.org.The form of this Standard reects the goals of the ScheduleDelay Analysis Standards Committee of the ConstructionInstitute of ASCE
15、. The provisions of this document are writtenin permissive language and, as such, offer to the user a series ofoptions or instructions but do not prescribe a specic course ofaction. Signicant judgment is left to the user of this document.This standard has been prepared in accordance with recog-nized
16、 engineering principles and should not be used without theusers competent knowledge for a given application. The publi-cation of this standard by ASCE is not intended to warrant thatthe information contained therein is suitable for any general orspecic use, and ASCE takes no position respecting the
17、validityof patent rights. The user is advised that the determination ofpatent rights or risk of infringement is entirely their ownresponsibility.A complete list of currently available standards is available inthe ASCE Library (http:/ascelibrary.org/page/books/s-standards).iiiThis page intentionally
18、left blankCONTENTSACKNOWLEDGMENTS . vii1 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 SCOPE 33 DEFINITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54 CRITICA
19、L PATH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74.1 Because the Critical Path Is Dynamic, Delays Should Be Evaluated Based on the Critical Path DuringEach Delay. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
20、. . . . . . . . . . . . . . 74.2 Contemporaneous Schedules Should Be Maintained to Reect Actual Performance, the Plan to Completethe Work, and Delay, Should It Occur . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74.3 Delay Must Be Critical to the Current Adjusted Completi
21、on Date for Consideration of aTime Extension . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74.4 Delay Should Generally Be Measured by the Change to the Scheduled Completion Date Caused bythe Delay. . . . . . . . . . . . . . . . . . . . . . . . . .
22、. . . . . . . . . . . . . . . . . . . . . . . . . . . 74.5 Excusable Delays Are Typically Events Outside the Contractors Control and Entitle the Contractor to aTime Extension . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84.6 In Situations Where th
23、e Completion Date Is Adjusted Properly for Change Orders and the Contractor Is BehindSchedule, OwnerDelays that Occur Thereafter ona Separate Path May Have a Mitigating Effecton Assessmentof Damages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
24、 84.7 For a Delay to Be Compensable, It Should Be the Sole Cause of Delay . . . . . . . . . . . . . . . . . . . 85 FLOAT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 95.1 Activities with Float Are Not Critical. . . . . . . . . .
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASCE67172017SCHEDULEDELAYANALYSISPDF
