1、*USACE / NAVFAC / AFCESA / NASA UFGS-31 11 00 (August 2008)-Preparing Activity: USACE SupersedingUFGS-31 11 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 31 - EARTHWORKSECTION 31 11 00CLEARING AND GRUBBIN
2、G08/08PART 1 GENERAL1.1 SUBMITTALS1.2 DELIVERY, STORAGE, AND HANDLINGPART 2 PRODUCTS2.1 TREE WOUND PAINT2.2 HERBICIDEPART 3 EXECUTION3.1 PROTECTION3.1.1 Roads and Walks3.1.2 Trees, Shrubs, and Existing Facilities3.1.3 Utility Lines3.2 CLEARING3.3 TREE REMOVAL3.4 PRUNING3.5 GRUBBING3.6 DISPOSAL OF MA
3、TERIALS3.6.1 Saleable Timber3.6.2 Nonsaleable Materials- End of Section Table of Contents -SECTION 31 11 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-31 11 00 (August 2008)-Preparing Activity: USACE Su
4、persedingUFGS-31 11 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 31 11 00CLEARING AND GRUBBING08/08*NOTE: This guide specification covers the requirements for clearing and grubbing.Edit this guide specification for project specif
5、ic requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification ar
6、e welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*
7、NOTE: When this specification is used for hazardous waste site remediations, define what materials generated from clearing, grubbing, and tree removal are contaminated and what materials are non-contaminated. The decision on how to define contaminated and non-contaminated materials must be made by t
8、he appropriate regulatory authorities and documented in the design analysis.The following information must be shown on the project drawings:1. Limits of clearing2. Limits of grubbingSECTION 31 11 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,
9、-,-3. Trees and shrubs to remain in area to be cleared4. Trees to be removed in areas which are not to be cleared5. Describe size, density, and type of trees to be cleared and grubbed.*1.1 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edi
10、t the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only
11、 delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up
12、to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in th
13、e District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army p
14、rojects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Go
15、vernment. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-03 Product DataNonsaleable Materials; G; G, _Written permission to dispose of such products on private property shall be filed with the Contracting Officer.SECTION 31 11 00 Page 3Provided by IHSNot for ResaleN
16、o reproduction or networking permitted without license from IHS-,-,-SD-04 SamplesTree wound paintHerbicideSamples in cans with manufacturers label.1.2 DELIVERY, STORAGE, AND HANDLINGDeliver materials to store at the site, and handle in a manner which will maintain the materials in their original man
17、ufactured or fabricated condition until ready for use.PART 2 PRODUCTS2.1 TREE WOUND PAINTBituminous based paint of standard manufacture specially formulated for tree wounds.2.2 HERBICIDE*NOTE: Specify by generic name. Spraying of herbicides should be prohibited near vegetation to be saved; if deemed
18、 necessary, this may be made more controllable by careful selection of herbicides. Recommended types and rate of coverage should be obtained from recognized authorities. When grubbing is included as part of the contract, delete requirements for herbicides.*_. Comply with Federal Insecticide, Fungici
19、de, and Rodenticide Act (Title 7 U.S.C. Section 136) for requirements on Contractors licensing, certification and record keeping. Contact the command Pest Control Coordinator prior to starting work.PART 3 EXECUTION3.1 PROTECTION3.1.1 Roads and WalksKeep roads and walks free of dirt and debris at all
20、 times.3.1.2 Trees, Shrubs, and Existing FacilitiesProtection shall be in accordance with Section 01 57 19.00 20, TEMPORARY ENVIRONMENTAL CONTROLS. Trees and vegetation to be left standing shall be protected from damage incident to clearing, grubbing, and construction operations by the erection of b
21、arriers or by such other means as the circumstances require.3.1.3 Utility LinesProtect existing utility lines that are indicated to remain from damage. Notify the Contracting Officer immediately of damage to or an encounter SECTION 31 11 00 Page 4Provided by IHSNot for ResaleNo reproduction or netwo
22、rking permitted without license from IHS-,-,-with an unknown existing utility line. The Contractor shall be responsible for the repairs of damage to existing utility lines that are indicated or made known to the Contractor prior to start of clearing and grubbing operations. When utility lines which
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3111002008CLEARINGANDGRUBBING 清理 除根 PDF

链接地址:http://www.mydoc123.com/p-449686.html