1、*USACE / NAVFAC / AFCESA / NASA UFGS-31 10 00 (August 2008)-Preparing Activity: USACE (CW) SupersedingUFGS-31 10 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 31 - EARTHWORKSECTION 31 10 00CLEARING FOR CI
2、VIL WORKS08/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Clearing (Timber and Structure)1.1.1.1 Payment1.1.1.2 Unit of Measure1.2 DEFINITIONS1.2.1 Trees1.2.2 Brush1.2.3 Structures1.3 PROJECT/SITE CONDITIONS1.3.1 Aesthetics and Pollution Control1.3.1.1 Ground Areas1.3.1.2 Construction Roads1.3.2 Existing Con
3、ditions1.3.2.1 Boundaries1.3.2.2 Cemeteries1.3.2.3 Markings of Zones1.3.2.4 Zones1.3.2.5 Fences1.3.2.6 StructuresPART 2 PRODUCTS (Not Applicable)PART 3 EXECUTION3.1 CLEARING REQUIREMENTS3.1.1 Brush3.1.2 Zone 13.1.3 Zone 23.1.4 Equipment3.2 DISPOSAL OF MATERIAL3.2.1 General3.2.2 Burning3.2.3 BurialSE
4、CTION 31 10 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.2.4 Removal from Site3.3 DEBRIS3.4 MARKETABLE MATERIALS3.5 LOCATIONS- End of Section Table of Contents -SECTION 31 10 00 Page 2Provided by IHSNot for ResaleNo reproduction or netw
5、orking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-31 10 00 (August 2008)-Preparing Activity: USACE (CW) SupersedingUFGS-31 10 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 31 10 00CLEARING FOR CIVI
6、L WORKS08/08*NOTE: This guide specification covers the requirements for furnishing all labor and equipment and performing all work required for clearing and disposal of trees, stumps, clearing fences, buildings, and other structures and disposal of debris, trash, and materials resulting from clearin
7、g operations.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are pr
8、esent.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be
9、submitted as a Criteria Change Request (CCR).This guide specification has been prepared for use in reservoir clearing operations. It has two alternates, one which is concerned with the clearing of timber lands and the other one deals with the removal of man-made structures, debris, etc.*PART 1 GENER
10、AL1.1 UNIT PRICES*NOTE: If Section 01 22 00.00 10 MEASUREMENT AND PAYMENT is included in the project specifications, SECTION 31 10 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-this paragraph title (UNIT PRICES) should be deleted from this
11、 section and the remaining appropriately edited subparagraphs below should be inserted into Section 01 22 00.00 10.No paragraph covering partial payment has been included in this guide specification. If partial payment is to be made, it should be addressed in the contract at the appropriate place (e
12、.g., Section 01 22 00.00 10 MEASUREMENT AND PAYMENT. One method, which has been used, is described here in general terms and may be incorporated when necessary. To estimate the value of work completed during each period, the zones are divided into the class of clearing involved. Class A clearing inc
13、ludes, as nearly as can be determined from aerial photographs or other means, all the wooded area with the exception of scattered trees, fringe growth along roads and fences, etc. Class B clearing contains all of the open, cultivated or pasture lands and those relatively open areas containing scatte
14、red trees, fringe growth along roads and fences, etc. The numbers of hectares (acreages) in each class should be estimated in advance and tabulated under the partial payment clause of the specification and thenceforth not be subject to change even if it is discovered that the original classification
15、 may have been in error. The most difficult class is arbitrarily assigned ninety work units for clearing, disposal, and clean-up. The number of work units in the other classes are estimated by comparison with the base class. The final estimate might be as follows:Class A, Zone 1 _ hectares (acres) x
16、 60 = _ work unitsClass B, Zone 1 _ hectares (acres) x 15 = _ work unitsClass A, Zone 2 _ hectares (acres) x 90 = _ work unitsClass B, Zone 2 _ hectares (acres) x 25 = _ work unitsTotal work units = _The value of a work unit is determined by dividing the contract price by the above total. The value
17、of the work completed during any period will be determined by multiplying the number of hectares (acres) of the various classes completed in each zone, as estimated by the Contracting Officer by planimetering areas from Government progress maps, by the work units in that class, totaling these figure
18、s and multiplying this total by the value of an individual unit as determined above. The estimate of the Contracting Officer will be final. For the purpose of apportioning the classes of work completed during any period, the felling and decking ready for burning or removal is considered as 50 percen
19、t of the work required and the removal and/or burning and clean-up will be considered as the remaining 50 percent.SECTION 31 10 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*1.1.1 Clearing (Timber and Structure)1.1.1.1 PaymentPayment will
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3110002008CLEARINGFORCIVILWORKS 用于 土木工程 清理 PDF

链接地址:http://www.mydoc123.com/p-449685.html