1、*USACE / NAVFAC / AFCESA / NASA UFGS-31 05 21 (August 2008)-Preparing Activity: USACE SupersedingUFGS-31 05 21 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 31 - EARTHWORKSECTION 31 05 21GEOGRID SOIL REINFOR
2、CEMENT08/08PART 1 GENERAL1.1 MEASUREMENT AND PAYMENT1.2 REFERENCES1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.5 DELIVERY, STORAGE, AND HANDLING1.5.1 Labeling1.5.2 Handling1.5.3 StoragePART 2 PRODUCTS2.1 GEOGRID REINFORCEMENT2.1.1 Geogrid Reinforcement Properties2.1.1.1 Allowable Strength2.1.1.2 Interface F
3、riction Testing2.2 SPLICESPART 3 EXECUTION3.1 INSTALLATION3.1.1 Subgrade Preparation3.1.2 Anchor Trench3.1.3 Placement3.1.4 Overlaps and Fasteners3.1.5 Splices3.1.6 Penetrations3.2 COVER SOIL PLACEMENT3.3 OVERSIGHT3.4 CONFORMANCE TESTING- End of Section Table of Contents -SECTION 31 05 21 Page 1Prov
4、ided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-31 05 21 (August 2008)-Preparing Activity: USACE SupersedingUFGS-31 05 21 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated
5、July 2008*SECTION 31 05 21GEOGRID SOIL REINFORCEMENT08/08*NOTE: This guide specification covers the requirements for geogrid reinforcement to enhance the veneer soil stability for landfill liners and covers.Edit this guide specification for project specific requirements by adding, deleting, or revis
6、ing text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the techn
7、ical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: Geometric requirements such as slope le
8、ngth, and construction limits should be shown on the drawings.*1.1 MEASUREMENT AND PAYMENTThe unit of measurement for soil slope reinforcement will be square meters (SM) yards (SY). Overlaps for splices (if allowed) and for the Contractors convenience will not be measured for payment. Payment will b
9、e made at the respective unit price listed on the bidding schedule. Payment will be full compensation for furnishing all material, labor, equipment, supplies and incidentals to complete the work.SECTION 31 05 21 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without licen
10、se from IHS-,-,-1.2 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizar
11、ds Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from t
12、his section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.ASTM INTERNATIONAL (
13、ASTM)ASTM D 4355 (2007) Deterioration of Geotextiles from Exposure to Light, Moisture and Heat in a Xenon-Arc Type ApparatusASTM D 4595 (2005) Tensile Properties of Geotextiles by the Wide-Width Strip MethodASTM D 4873 (2002) Identification, Storage, and Handling of Geosynthetic Rolls and SamplesAST
14、M D 5262 (2007) Evaluating the Unconfined Tension Creep Behavior of GeosyntheticsASTM D 5321 (2002) Determining the Coefficient of Soil and Geosynthetic or Geosynthetic and Geosynthetic Friction by the Direct Shear MethodGEOSYNTHETIC INSTITUTE (GSI)GSI GRI GG1 (1987; R 1988) Geogrid Rib Tensile Stre
15、ngthGSI GRI GG4a (1991) Determination of the Long-Term Design Strength of Stiff GeogridsGSI GRI GG4b (1991) Determination of the Long-Term Design Strength of Flexible GeogridsGSI GRI GG5 (1991) Test Method for Geogrid PulloutSECTION 31 05 21 Page 3Provided by IHSNot for ResaleNo reproduction or netw
16、orking permitted without license from IHS-,-,-GSI GRI GG6 (1996) Grip Types for Use in Wide Width Testing of Geotextiles and Geogrids1.3 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals
17、required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not
18、 complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be
19、 used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for R
20、esident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submitt
21、als with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval. information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. Submit the following in accordance with S
22、ection 01 33 00 SUBMITTAL PROCEDURES:SD-02 Shop DrawingsInstallation; G; G, _Geogrid layout plan along with anchorage and joint details. Sequencing and construction procedures. Proposed geogrid layout a minimum of 7 days prior to geogrid placement.SD-03 Product DataAllowable StrengthSECTION 31 05 21
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3105212008GEOGRIDSOILREINFORCEMENT 土工 格栅 挡土墙 PDF

链接地址:http://www.mydoc123.com/p-449683.html