1、ARMY REGULATION AIR FORCE REGULATION NO. 415-30 NO. 93-10 W 3515789 032Lb 985 W c-3q-01 *AR 415-30 *AFR 93-10 DEPA.RTMENTS OF THE ARMY AND THE AIR FORCE WASHINGTON, DC, 15 Muy 1979 SPECIAL CIVIL ENGINEERING TROOP CONSTRUCTION AND ENGINEERING SUPPORT OF THE AIR FORCE OVERSEAS This revision replaces a
2、 joint regulation on the employment of US Army Engineers in support of the US Air Force overseas. It describes service respomibilites in accordance with DOD Directive 1315.6, dated 26 August 1978. Army users of this regulation will not implement interim changes unless the change document has been au
3、thenticated by the Adjutant General. (Interim changes expire 1 year supplemental guidance of the unified commands; and the thea- ters standards of construction. The require- ments for Army troop construction support of the Air Force contained in joint operations plans are expressed by the Air Force
4、component com- mander in a time-phased sequence for: i. Assistance in air base emergency re- pair and force beddown that exceeds Air Forces capability . 2. Repair or restoration to air bases be- yond emergency repair and base development. (b) The Army component commander will 3 2325 Provided by IHSN
5、ot for ResaleNo reproduction or networking permitted without license from IHS-,-,-W 3515789 0329719 694 = AR 415-30lAFR 93-10 determine the number and types of troop units, the type and amount of special construction ma- teriel, and the materiel storage and quartering assets needed to provide the re
6、quired support. (c) The support requirements stated in (u) and (b) above are to be integrated into the Theater Civil Engineering Support Plan by the unified commands. The data base maintained for civil engineering support planning will contain total service capability, resources, and require- ments
7、at each base complex. b. Submission of requirements. Unified and specified commanders will integrate and submit their requirements as the Civil Engineering Support Plan (app 5, annex D) of the OPLAN in accordance with the Joint Operation Planning System (JOPS). The Department of the Air Force will a
8、ssist in consolidating its require- ments and making them available to the De- partment of the Army for planning and justify- ing its force structure and materiel program. The Departments of the Army and Air Force will jointly review the contingency wartime re- quirements for military troop construc
9、tion and engineering support of the Air Force at least an- nually. 1 I c. Action on requirements. (i) Department of the Army will- (a) Ensure that there are resources to support the Air Force in annual programs. (b) Provide the number of troop units, by type, in the Active Army and Reserve compo- ne
10、nts of the Army. (Units will be clearly desig- nated in the Army troop program.) (c) Provide the construction materiel to satisfy mutually agreed on requirements. (d) Procure and store the necessary con- struction equipment and materials to ensure that they are available. Normally, the Army will es-
11、 tablish operational projects in accordance with (e) Provide the Air Force with a listing of troop units and materiel programed to support its requirements. (2) Department of the Air Force will assist Army in justifying necessary troop units and support the Army in procuring materiel to meet Air For
12、ce stated requirements. AR 710-1. 9. Peacetime operations. Under peacetime op erations, the Army may support the Air Force by providing troop units to- a. Construct new facilities or restore existing facilities as mutually agreed. b. Reinforce Air Force elements in tests, exercises, and joint traini
13、ng. 10. Budgeting and funding. u. Air Force. The Air Force will budget and fund for Air Force peacetime military construction projects to be done by Army troop units using the policies and procedures in AFR-172-1. b. Army. The Army will budget for the number of troop units needed for Air Force sup-
14、port using the policies and procedures in AR 1-1. c. Intersemice support. Supplies and services provided by one Department to the other under this regulation will be budgeted and funded ac- cording to applicable statutes, Departmental regulations, and interservice agreements (DOD 4000.19M, AR 37-27,
15、 AR 37-19fAFR 172-3, and others). 4 2356 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3535789 0329920 306 AR 415-30IAFR 93-10 APPENDIX A EMPLOYMENT OF ENGINEERING FORCES A-1. Base development. Prompt beddown of deploying units is important in intr
16、oducing these units to theater air bases. Rapidly expanding air bases will require the minimum facilities essential for combat air operations. Selected existing facilities will have to be either expanded or new facilities erected. a. Air Force. The Air Force role in hase development is expedient for
17、ce beddown. During mobilization, Air Force civil engineering resources deploy to meet mission requirements. The types of work for these forces include, but are not limited to- . (1) Revetting of unsheltered aircraft. (2) Bomb dump expansions with matting and earth berm. (3) Erection of fuel bladders
18、. (4) Erection of prepackaged kits for munitions, avionics, and maintenance (5) Site preparation for mobile control towers and communication vans. (6) Erection of Air Force bare base assets. (7) Installation of portable generators (8) Wiring of perimeter security lighting. facilities. This work woul
19、d continue until completed or pre-empted by war damage. 6. Army. The Army role in base development is all work other than force beddown. The Army will- (1) Acquire, repair, improve, expand, restore, and construct installations and facilities to support existing and deploying Air Force units at locat
20、ions named by the theater commander. (2) Restore and construct facilities such as supply depots, POL systems, pavements, parking areas, buildings, and roads conforming to theater standards of construction (JCS Pub 3). A-2. Early war damage repair. The amount of war damage may exceed the immediate re
21、pair capahility of Joint Army and Air Force engineering resources. Air base commanders will prioritize the work. a. Air Force. Air Force engineers will- (1) Initially make rapid runway repairs. Runway damage may be repaired with aluminum matting or other expedient repair techniques. The requirement
22、is to make a minimum operating strip and meandering taxiway from shelters for assigned and transient aircraft. (2) Make only rapid minimum emergency repair to critical command posts and communications, aircraft, and weapons maintenance facilities. Emergency repairs made to facilities will be expedie
23、nt. Repairs are to cover holes with plywood, shore weakened buildings, secure breaks in utility lines, eliminate live electrical wires, reroute utility lines above ground, and fH roofs, walls, and floors. Repair and restoration beyond these are Army responsibilities. A- 1 Provided by IHSNot for Resa
24、leNo reproduction or networking permitted without license from IHS-,-,-m 3515789 0329921 2Y2 m I AR 415-30lAFR 93-10 6. Army. The Army will- (1) Make emergency repairs of war damages if they exceedAir Forces (2) Repair and restore airfield pavements and other damaged facilities. (3) Reconstruct or r
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYAR415301979TROOPCONSTRUCTIONANDENGINEERINGSUPPORTOFTHEAIRFORCEOVERSEAS 海外 空军 队伍建设 工程 支持 PDF

链接地址:http://www.mydoc123.com/p-440433.html