1、 STANDARD ANSI/ISA77.14.01-2010 Fossil Fuel Power Plant Steam Turbine Controls Approved 10 November 2010ANSI/ISA77.14.01-2010 Fossil Fuel Power Plant Steam Turbine Controls ISBN: 978-1-936007-67-7 Copyright 2010 by ISA. All rights reserved. Not for resale. Printed in the United States of America. No
2、 part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise), without the prior written permission of the Publisher.Copyright 2010 ISA. All rights reserved. 3 ANSI/ISA77.14.01-20
3、10 Preface This preface, as well as all footnotes and annexes, is included for information purposes and is not part of ANSI/ISA77.14.01-2010. The standards referenced within this document may contain provisions, which, through reference in this text, constitute requirements of this document. At the
4、time of publication, the editions indicated were valid. All standards are subject to revision, and parties to agreements based on this document are encouraged to investigate the possibility of applying the most recent editions of the standards indicated within this document. Members of IEC and ISO m
5、aintain registers of currently valid International Standards. ANSI maintains registers of currently valid U.S. National Standards. This document has been prepared as part of the service of ISA, The International Society of Automation, toward a goal of uniformity in the field of instrumentation. To b
6、e of real value, this document should not be static but should be subject to periodic review. Toward this end, the Society welcomes all comments and criticisms and asks that they be addressed to the Secretary, Standards and Practices Board; ISA; 67 Alexander Drive; P. O. Box 12277; Research Triangle
7、 Park, NC, 27709; Telephone (919) 549-8411; Fax (919) 549-8288; E-mail: standardsisa.org. The ISA Standards and Practices Department is aware of the growing need for attention to the metric system of units in general, and the International System of Units (SI) in particular, in the preparation of in
8、strumentation standards. The Department is further aware of the benefits to USA users of ISA standards of incorporating suitable references to the SI (and the metric system) in their business and professional dealings with other countries. Toward this end, this Department will endeavor to introduce
9、SI-acceptable metric units in all new and revised standards, recommended practices, and technical reports to the greatest extent possible. Standard for Use of the International System of Units (SI): The Modern Metric System, published by the American Society for Testing one or more valve(s) opening
10、following another. See partial arc. 3.27. Shall and should: The word “SHALL” is to be understood as a REQUIREMENT; the word “SHOULD” as a STRONG RECOMMENDATION. 3.28. Single-valve mode: Control valves opening simultaneously. See full arc. 3.29. Speed control: Closed-loop control of turbine speed (RP
11、M) before synchronization. 3.30. Speed droop: The ratio of the percentage speed change to the resulting percentage valve-position change. Speed droop is inversely proportional to the steady-state gain of the speed controller. 3.31. Stop valve: A valve or set of valves used to shut off steam flow to
12、the turbine during turbine shutdown. The stop valves are tripped closed by the turbine protection system. In some applications, these valves are used to regulate steam flow during startup. 3.32. Synchronization: The process of matching frequency, phase, and voltage between the turbine generator and
13、the utility grid to allow proper breaker closure. 3.33. Turbine control system (TCS): Decision-making equipment with its associated power supplies, control processor(s), I/O hardware, and sensing devices that monitor and control the turbine. 3.34. Throttle pressure: See inlet pressure. 3.35. Throttl
14、e valve: See stop valve. 3.36. Trip: An action where all of the steam turbine valves are closed as quickly as possible. This can occur as a result of an emergency condition or as part of a normal shutdown. 3.37. Valve position limiter: See load limiter. Copyright 2010 ISA. All rights reserved. ANSI/
15、ISA77.14.01-2010 12 3.38. Valve position control: A control mode in which the load demand is directly translated into valve position demand without closed loop load feedback within the turbine controller. However, some turbine valve actuators may require a closed loop positioning system. 4. Design r
16、equirements 4.1. Instrumentation Process-sensing devices (see Figure 4.Error! No text of specified style in document.1 - Turbine instrumentation) should be installed as close as practical to the source of the measurement with appropriate design to prevent excessive vibration and temperature and to p
17、rovide access for periodic maintenance. Separate isolation valves and impulse lines should be run to each pressure-sensing device used for control. Figure 4.Error! No text of specified style in document.1 - Turbine instrumentation (typical) ST101HPGeneratorIPJT101ST102ST103Re-heaterLPHStopValveZT101
18、HControlValveZT102PT102PT101CondenserReheatStop ValveZT103InterceptValveZT1044.1.1. Speed sensing A minimum of three speed-sensing devices (probes) shall be used for speed control (ST-101, 102, 103). At least one of these speed probes shall be capable of reading turning-gear speed. An additional ins
19、talled spare-speed probe should be supplied. When the backup overspeed trip system is an electronic design (refer to section 4.2), the speed probes used by the turbine control system shall be independent of those used by a backup electronic overspeed trip system. 4.1.2. Valve position Feedback shall
20、 be instrumented for all valves controlled by the turbine control system: stop (ZT101), control (ZT102), reheat stop (ZT103), and intercept valves (ZT104). LVDTs or similar measurement devices shall be used for modulating valves. Limit switches are acceptable for valves whose position is not modulat
21、ed. Copyright 2010 ISA. All rights reserved. 13 ANSI/ISA77.14.01-2010 4.1.3. Steam pressures Inlet-pressure transmitter (PT-101). First-stage pressure transmitter (PT-102). 4.1.4. Generator Megawatt transducer (JT-101). Generator breaker status 4.1.5. Turbine trip status Typically a pressure signal
22、on the trip oil header. 4.2. Overspeed trip system Two independent turbine overspeed trip systems shall be provided: The primary system shall be within the turbine control system; the backup system shall be either a mechanical overspeed trip device or an electronic overspeed trip system as defined b
23、y the American Petroleum Institute standard, API 670. The backup overspeed trip system shall be capable of tripping the turbine without the involvement of the turbine control system. Speed sensing devices (probes) used by the turbine control system shall be independent of those used by a backup elec
24、tronic overspeed trip system. The turbine control system and the electronic overspeed trip system, when utilized as the backup system for the overspeed trip function, shall perform the trip function through independent solenoids. A multi-toothed surface for speed sensing shall be provided integral w
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ANSIISA7714012010FOSSILFUELPOWERPLANTSTEAMTURBINECONTROLS 矿物 燃料 电池 汽轮机 控制 装置 PDF

链接地址:http://www.mydoc123.com/p-436979.html