1、Section 28 WEARING SURFACES 28.1 DESCRIPTION This work shall consist of placing a wearing surface of durable and impervious material on the roadway surface of bridge decks. It also includes the preparation of the sur- faces of either existing or new decks to receive such an overlay of surfacing mate
2、rial. The type and thickness of the wearing surface shall be as designated on the plans. The materials and installation requirements for wearing surfaces of types other than latex modified concrete shall be as specified in the special provisions. Latex modified concrete wearing surfaces shall be fur
3、nished and installed in accordance with these Specifications. 28.2 LATEX MODIFIED CONCRETE TYPE WEARING SURFACE 28.2.1 General All equipment used to prepare the surface and to pro- portion, mix, place and finish the latex concrete shall be subject to approval by the Engineer prior to use. This ap- p
4、roval will be contingent on satisfactory performance and will be rescinded in the event such performance is not being achieved. Equipment shall be on hand sufficiently ahead of the start of construction operations to be exam- ined and approved. Any equipment leaking oil or any other containment onto
5、 the deck shall be immediately removed from the job site until repaired. A technician who is well experienced in the propor- tioning, mixing, placing and finishing of latex modified concrete shall be employed by the Contractor and shall be present and in technical control of the work whenever these
6、operations are underway. The qualifications of this technician which includes a list of projects on which the technician was employed and the technician?s level of re- sponsibility on each shall be submitted to and approved by the Engineer prior to the start of these operations. Approval by the Engi
7、neer of equipment or technicians shall not relieve the Contractor of any responsibility under the contract for the successful completion of the work. If not otherwise shown on the pians, the minimum thickness of latex modified concrete wearing surfaces shall be 1 */4 inches. 28.2.2 Materials 28.2.2.
8、1 Portland Cement Portland cement shall conform to the requirement of Article 8.3.1 of Section 8, ?Concrete Structures,? except that only Types I or II shall be used. 28.2.2.2 Aggregate Aggregate shall conform to the requirements of AASHTO M 6 for fine aggregate and to AASHTO M 80 for coarse aggrega
9、te. Coarse aggregate shall be graded ?/2 inch to No. 4 per AASHTO M 43. 28.2.2.3 Water Water for mixing concrete shall conform to the requirements of Article 8.3.2. 28.2.2.4 Latex Emulsion Formulated latex emulsion admixture shall be a non- hazardous, film forming, polymeric emulsion in water to whi
10、ch all stabilizers have been added at the point of manufacture and shall be homogeneous and uniform in composition. Physical Properties-The latex modifier shall conform to the following requirements: Polymer Type Stabilizers Styrene Butadiene (a) Latex Nonionic Surfactants (b) Portland Cement Compos
11、ition . Polydimethyl Siloxane Percent Solids . 46.0-49.0 Weight per Gallon (lbs at 25C) 8.4 Color . White 679 680 HIGHWAY BRIDGES 28.2.2.4 A Certificate of Compliance signed by the manufac- turer of the latex emulsion certifying that the material con- forms to the above specifications shall be furni
12、shed for each shipment used in the work. Latex admixture to be stored shall be kept in suitable enclosures which will protect it from freezing and from prolonged exposure to temperatures in excess of 85F. Containers of latex admixture may be stored at the bridge site for a period not to exceed 10 da
13、ys. Such stored con- tainers shall be covered completely with suitable insulat- ing blanket material to avoid excessive temperatures. 28.2.2.5 Latex Modified Concrete The latex modified concrete for use on this project shall be a workable mixture and meet the following requirements. Material or Prop
14、erty Concrete Fine Aggregate (Parts by weight) (Note 3) . Coarse Aggregate (Parts by weight) (Note 3) Latex Emulsion Admixture- (Gals /Bag Cement) . . . . . . . . . . . . . . . . . . Air Content of Plastic Mix, Slump,Inches (Notes 1 and 2) . . . . . . . . . . . Cement (Parts by weight) (Note 3). . .
15、 . . . . . 1 2.5 2.0 3.5 % (AASHTO T 152). . . . . . . . . . . . . . . . . 3-6 3-6 NOTES: Following sampling of the discharged, normally mixed material, the commencement of the slump test shall be delayed from 4 to 5 minutes. Water may be added to obtain slump within the pre- scribed limits. The dry
16、 weight ratios are approximate and should produce good workability, but due to gradation changes may be adjusted within limits by the Engi- neer. The parts by weight of sand may be increased by as much as 0.2 if the coarse aggregate is reduced by an equivalent volume. 28.2.3 Surface Preparation 28.2
17、.3.1 New Decks The surfaces of new decks upon which a wearing sur- face overlay is to be placed shall be finished to a rough texture by coarse brooming or other approved methods. After curing of the deck concrete is complete and be- fore placing the overlay, the entire area of the deck surface and t
18、he vertical faces of curbs, concrete parapets, barrier walls, etc., up to a height of 1 inch above the top elevation of the overlay shall be blast cleaned to a bright, clean ap- pearance which is free from laitance, curing compound, dust, dirt, oil, grease, bituminous material, paint, and all foreig
19、n matter. The blast cleaning of an area of the deck shall normally be performed within the 24-hour period preceding placement of the overlay on the area. The blast cleaning may be performed by either wet sandblasting, high pressure water blasting, blasting grits, shrouded dry sandblasting with dust
20、collectors, or other method ap- proved by the Engineer. Water blasting equipment shall operate with a minimum pressure of 3,500 psi. The method used shall be performed so as to conform to ap- plicable air and water pollution regulations and to applic- able safety and health regulations. All debris,
21、including dirty water, resulting from the blast cleaning operations shall be immediately and thoroughly cleaned from the blast-cleaned surfaces and from other areas where debris may have accumulated. The blast cleaned areas shall be protected, as necessary, against contamination prior to placement o
22、f the overlay. Contaminated areas and areas exposed more than 36 hours after cleaning shall be blast cleaned again as directed by the Engineer at the Contrac- tors expense. Just prior to placement of the overlay, all dust and other debris shall be removed by flushing with water or blow- ing with com
23、pressed air. The prepared surface shall then be soaked with clean water for not less than 1 hour prior to the placement of the latex overlay. Before the overlay is applied, all free water shall be blown out and off, and this procedure shall continue until the surface appears dry or barely damp. The
24、air supply system for blast cleaning and blowing shall be equipped with an oil trap in the air line, and pro- visions shall be made to prevent oil or grease contamina- tion of the surface by any equipment prior to placement of the overlay. 28.2.3.2 Existing Decks The surface of existing decks that h
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AASHTOHB17DIVISIONIISEC282002DIVISIONIICONSTRUCTIONWEARINGSURFACES 磨损 表面 PDF

链接地址:http://www.mydoc123.com/p-417595.html