SANS 10120-5 DM-1981 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section DM E.pdf
《SANS 10120-5 DM-1981 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section DM E.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-5 DM-1981 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section DM E.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. Clause SABS 0120 : Part 5 Section DM-1981 Earthworks (roads . subgrade) PART 5 : CONTRACT ADMlNlSTRATlON SECTlON DM CONTENTS START OF CONSTRUCTION Cneral
4、 IMMBUIATFAY AFlXR THE HANDING OVER OF THE SITE . Six-Paas Roller Compaction . DURING CONSTRUCTLON Administration (Precautions to Minimize lle Dimensions of cuts . Disposal of surplus or unsuitable malerial Most economical use of material . In-place treatment Methods of Construction Drainage of rock
5、 cuts Placing Watering and mixing Addition of fine material to side slopes o Compaciion of rock fills . . Widening of side fills Compaction specified by numher oE passes . QUALITY CONTROL AND OTHER CONSIDERATlONS . Page Number aye) . . rock fi S. 1 . 1 1s I S 2 . 2 P 2 . 2 SABS 0120 : Part 5 Section
6、 DM-1981 Earthworks (roads, subgrade) SABS 1200 DM : EARTHWORKS (ROADS, SUBGRADE) NOTE: The clause numher(s) given at the heginning or after the heading oE a clause ia/are, unlhss otherwise stated. the numher(s) of the relevant clause(s) of SABS 1200 DM. START OF CONSTRUCTION GENERAL. For the purpos
7、es of this part of the code contract administration starts with instructions to the contractor to commence work as set out in Subclause 4.1 of Section 0. IMMEDIATELY AFPER THE HANDING OVER OF THE SITE SIX-PASS ROLLER COMPACTION (Subclause 5.2.3.3 and see also Subclause 1.1.1 of Section DM of Part 3
8、of the code). Where the preliminary testing has not been adequate, trial compaction runs should be made. at the earliest possible opportunity during conatruction, on each type of material encountered. DURING CONSTRUCTION ADMINISTRATION (PRECAUTIONS TO MINIMIZE DELAYS) Dimension8 nf Cuts (Subclause 5
9、.2.2.1). The contractor should, immediately after the nature of the material heing excavated has been disclosed, ask the engineer for instructions regarding the slope of the sides of cuttings and the depth to which cuttinge are to be taken. A similar request should be made regarding the dimensions o
10、f any cuts and regarding any in-place treatment that may be required below the level of the top of the subgrade, if possible before the excavation reaches the designated finished levels. Disposal of Surplus or Unsuitable Material (Subclause 5.2.2.5). The engineer may require that surplus material be
11、 used to widen fills or flatten slopes or for any other similar purpose. Such decisions should be given early to enahle the contractor to organize efficiently. Most Economical Use of Material (Suhclause 5.2.2.3(c). Economy in the use of material is not necessarily associated with the lowest contract
12、 price (for the engineer), or the highest profit margin (for the contractor). Such economy is the most economical use of available material to achieve the quality of construction required by the employer. The decision on how this should be achieved may be a matter of opinion. The engineer. represent
13、ing the employer, must decide. The contractor may resort to arhttration if he does not like the decision. In-Place Treatment (Subclause 5.2.3.3(b). The engineer should take drainage problems into account before ordering work that will disturb an existing road-bed. METHODS OF CONSTRUCTION Drainage of
14、 Rock Cuts (Suhclauae 5.2.3.1). In the interests of the contractor and of the quality of the finished work, any hollows in rock cuts should be linked for the purpose of drainage. Placing (Subclause 5.2.4.2). Where material can generally be broken down to a maximm sise of 150 mm, the thickness of the
15、 layer should not exceed 200 m after compaction except that. in the case of cohesionless sands, layer thicknesses of up to 400 m may be employed provided that the specified densities are attained over the full depth of compaction. Where, after the removal of grossly oversize material, the remaining
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101205DM1981CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART5CONTRACTADMINISTRATIONSECTIONDMEPDF

链接地址:http://www.mydoc123.com/p-1028596.html