欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    SANS 10120-5 DM-1981 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section DM E.pdf

    • 资源ID:1028596       资源大小:300.45KB        全文页数:5页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    SANS 10120-5 DM-1981 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section DM E.pdf

    1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA

    2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any

    3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. Clause SABS 0120 : Part 5 Section DM-1981 Earthworks (roads . subgrade) PART 5 : CONTRACT ADMlNlSTRATlON SECTlON DM CONTENTS START OF CONSTRUCTION Cneral

    4、 IMMBUIATFAY AFlXR THE HANDING OVER OF THE SITE . Six-Paas Roller Compaction . DURING CONSTRUCTLON Administration (Precautions to Minimize lle Dimensions of cuts . Disposal of surplus or unsuitable malerial Most economical use of material . In-place treatment Methods of Construction Drainage of rock

    5、 cuts Placing Watering and mixing Addition of fine material to side slopes o Compaciion of rock fills . . Widening of side fills Compaction specified by numher oE passes . QUALITY CONTROL AND OTHER CONSIDERATlONS . Page Number aye) . . rock fi S. 1 . 1 1s I S 2 . 2 P 2 . 2 SABS 0120 : Part 5 Section

    6、 DM-1981 Earthworks (roads, subgrade) SABS 1200 DM : EARTHWORKS (ROADS, SUBGRADE) NOTE: The clause numher(s) given at the heginning or after the heading oE a clause ia/are, unlhss otherwise stated. the numher(s) of the relevant clause(s) of SABS 1200 DM. START OF CONSTRUCTION GENERAL. For the purpos

    7、es of this part of the code contract administration starts with instructions to the contractor to commence work as set out in Subclause 4.1 of Section 0. IMMEDIATELY AFPER THE HANDING OVER OF THE SITE SIX-PASS ROLLER COMPACTION (Subclause 5.2.3.3 and see also Subclause 1.1.1 of Section DM of Part 3

    8、of the code). Where the preliminary testing has not been adequate, trial compaction runs should be made. at the earliest possible opportunity during conatruction, on each type of material encountered. DURING CONSTRUCTION ADMINISTRATION (PRECAUTIONS TO MINIMIZE DELAYS) Dimension8 nf Cuts (Subclause 5

    9、.2.2.1). The contractor should, immediately after the nature of the material heing excavated has been disclosed, ask the engineer for instructions regarding the slope of the sides of cuttings and the depth to which cuttinge are to be taken. A similar request should be made regarding the dimensions o

    10、f any cuts and regarding any in-place treatment that may be required below the level of the top of the subgrade, if possible before the excavation reaches the designated finished levels. Disposal of Surplus or Unsuitable Material (Subclause 5.2.2.5). The engineer may require that surplus material be

    11、 used to widen fills or flatten slopes or for any other similar purpose. Such decisions should be given early to enahle the contractor to organize efficiently. Most Economical Use of Material (Suhclause 5.2.2.3(c). Economy in the use of material is not necessarily associated with the lowest contract

    12、 price (for the engineer), or the highest profit margin (for the contractor). Such economy is the most economical use of available material to achieve the quality of construction required by the employer. The decision on how this should be achieved may be a matter of opinion. The engineer. represent

    13、ing the employer, must decide. The contractor may resort to arhttration if he does not like the decision. In-Place Treatment (Subclause 5.2.3.3(b). The engineer should take drainage problems into account before ordering work that will disturb an existing road-bed. METHODS OF CONSTRUCTION Drainage of

    14、 Rock Cuts (Suhclauae 5.2.3.1). In the interests of the contractor and of the quality of the finished work, any hollows in rock cuts should be linked for the purpose of drainage. Placing (Subclause 5.2.4.2). Where material can generally be broken down to a maximm sise of 150 mm, the thickness of the

    15、 layer should not exceed 200 m after compaction except that. in the case of cohesionless sands, layer thicknesses of up to 400 m may be employed provided that the specified densities are attained over the full depth of compaction. Where, after the removal of grossly oversize material, the remaining

    16、material cannot be reduced in size to 150 mm or less, the thickness of the layer should be auch that the maximum dimension of any particle does not exceed two-thirds of the thickness of the completed layer. Before he allows thicker layers than those specified above to be constructed, the engineer sh

    17、ould satiafy himselZ that the specified densities can be obtained through- out the full depth oE each layer and that the layers will be uniformly compacted by means of the equipment that the contractor proposes to use. Watering. and Mixing (Subclause 5.2.4.2(e). The required amount of water should b

    18、e spplied by repeated passes of tank trucks with distributors of approved pattern and capacity, or by sprinkler irrigation equipment. and should be thoroughly mixed with the material in the layer concerned by oieana of disc harrovs, ploughs, motor graders. or other suitable machines. Addition of Fin

    19、e Material To Side Slopes of Rock Fills (Subclause 5.2.4.3(c). The contractor should establish, in advance, whether it will be necessary to add fine material to the side slopes of rock fills and, if necessary. he should add the fine material as the fill is being constructed. May 1981 Approved by the

    20、 COUNCIL OF THE SOUTH AFRICAN BUREAU OF STANDARDS SABS 0120 : Part 5 Section DM-1981 Earthworks (roads, subgrade) Compaction of Rock Fills (Subclause 5.2,4.2(d) a) Depending on the nature of the material, a number oE combinations of roller mass. number of passes, and width of vibratory roller should

    21、 produce adequate compaction with a satisfactory lock. b) Studies of compaction processes have shown that because of many interdependent factors such as area of application, speed of operation, methods of generating vibrations. and variations in grading, moisture content, and pore pressure of the ma

    22、terial being compacted, there is no simple way of determining compaction potential from machine data. Nonelheless. the data set out in (c) and (d) below will provide some guidance for the contractor and the engineer particularly if the data are used in the light of the experience of the parties carr

    23、ying out the work. c) h order that a satisfactory “lock“ should be achieved the type of vibratory roller used. the operating speed, the number of passes, and the thickness of the layer should be such as to satisfy the following formula: - 1200 (minimum) h xv where Pe = total static and dynamic force

    24、 per metre of width exerted by the vibratory roller at the operating frequency given by manufacturer, kN/m n - number of passes required h - thickness of layer, m v - roller speed. m/s Operating frequencies should be limited to 1100 - 1800 vibrations per mintite and the value of the ratio Pe/h shoul

    25、d be at least 120 kN/rnZ. d) Because values of Pe and v are not always readily available. the following table, which is based on data from various manufacturers of vibrating rollers. may be useful in indicating the number of passes of various rollers required for a layer of thickness 750 mm. Widenin

    26、g of Side Fills (Subclause 5.2.4.1(b). In general, the widening of side fills should be restricted to Fills of depth not exceeding 1,5 m. However, where the engineer find8 it necessary, in order to dispose of material that has unexpectedly become available or surplus, to order that addi- tional mate

    27、rial be tipped over the side of an exfsting fill without further shaping and finishing, he should also order that the existing slope be benched prior to tipping and he should be prepared to pay under Subclause 8.2.4.4 of SABS 1200 DM for such benching. Compaction specified by Number of Passes Number

    28、 of passes for a 750 mm layer StatLc mass of roller, t General (See Subclause 3.2.1 of Part 2 of Section DM of the code). While it is not the intention that water be applied to the road-bed by the contractor when compaction is specified by number of passes, and while no rigid control of moisture wil

    29、l be exercised during compaction, the contractor should nevertheless satisfy the engineer that every endeavour is being made to take full advantage of favourable soil moisture conditions during the rainy season and, as far as is possible, to carry out such compaction when theroad-bedis neither exces

    30、sively dry nor excessively wet. Total applied force, kN Verifying of output of vibratory roller (See Subclause 3.2.1 of Part 2 of Section DM of the code) a) Vibratory roller. As verification in the field of the dynamic load and frequency of a vibratory roller is not practical and the engineer has on

    31、ly the data provided by the manufacturer to rely on, neither the static load in kilonewtons per metre of roller nor the dynamtc load in cycles per minute have been speciEied in PSDM 1.1.2, as set out in Subclause 3.2.1 of Part 2 of Section DM of the code. QUALITY CONTROL AND OTHER CONSIDERATIONS The relevant recommendations of SABS 0157) should be applied to the subgrade for urban and industrial roads. -. 1) Quality management systems.


    注意事项

    本文(SANS 10120-5 DM-1981 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section DM E.pdf)为本站会员(testyield361)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开