SAE USCAR-6-1999 STANDARD FOR D C BRUSH MOTOR - HVAC BLOWERS《D C 整流式电动机标准 HVAC鼓风机》.pdf
《SAE USCAR-6-1999 STANDARD FOR D C BRUSH MOTOR - HVAC BLOWERS《D C 整流式电动机标准 HVAC鼓风机》.pdf》由会员分享,可在线阅读,更多相关《SAE USCAR-6-1999 STANDARD FOR D C BRUSH MOTOR - HVAC BLOWERS《D C 整流式电动机标准 HVAC鼓风机》.pdf(28页珍藏版)》请在麦多课文档分享上搜索。
1、STANDARD FOR D.C. BRUSH MOTOR HVAC BLOWERSThe research data, analysis, conclusion, opinions and other contents of this document are solely the product of the authors. Neither the Society of Automotive Engineers, Inc. (SAE) nor the United States Council for Automotive Research (USCAR) certifies the c
2、ompliance of any products with the requirements of nor makes any representations as to the accuracy of the contents of this document nor to its applicability for purpose. It is the sole responsibility of the user of this document to determine whether or not it is applicable for their purposes.Copyri
3、ght 1999, USCARAll rights reserved. Printed in U.S.A.Issued February 1999SAE/USCAR-6QUESTIONS REGARDING THIS DOCUMENT: (724) 772-8545 FAX (724) 776-0243TO PLACE A DOCUMENT ORDER: (724) 776-4970 FAX (724) 776-0790SAE WEB ADDRESS: http:/www sae orgSUMMARY OF CONTENTS1.0 SCOPE2.0 REFERENCE DOCUMENTS AN
4、DDEFINITIONS2.1 Applicable Drawings/Specifications2.2 Application Specific Requirements2.3 Test Categories3.0 OUTLINE4.0 GENERAL REQUIREMENTS4.1 Record Retention4.2 Sample Documentation4.3 Hazardous Material Control4.4 Materials and ProcessStandards4.5 Default Test Conditions4.6 Equipment4.7 Measure
5、ment Resolution4.8 Equipment Calibration4.9 Customer Notification of Non-conformance4.10 General Endurance Objective4.11 Design Verification4.12 Production Validation4.13 Failure Mode and Effect Analysis (FMEA)4.14 Quality Control4.15 Jury Evaluation5.0 PERFORMANCE REQUIREMENTS/TESTS5.1 Motor Perfor
6、mance5.2 Noise5.3 Demagnetization5.4 Axial Force5.5 Electromagnetic Compatibility6.0 ENVIRONMENTAL REQUIREMENTS/TESTS6.1 Random Vibration6.2 High Temperature Soak6.3 Salt Spray6.4 Dust7.0 DURABILITY REQUIREMENTS/TESTS7.1 Endurance8.0 RELIABILITY REQUIREMENTS/TESTS8.1 Production Validation TestingReq
7、uirements8.2 In-Process Validation TestingRequirements9.0 ELECTRICAL CONNECTORREQUIREMENTSAPPENDICESA DESIGN VERIFICATION TESTSB NEW AND CARRY-OVER PRODUCTIONVALIDATION TESTSC IN-PROCESS VALID ATION TESTSD LESSONS LEARNEDE GLOSSARY OF TERMSSAE/USCAR-6 ISSUED FEBRUARY 1999STANDARD FOR D.C. BRUSH MOTO
8、R - HVAC BLOWERS-2-1.0 SCOPEThis standard sets forth the performance and durability requirements for 12-volt, D.C. brush-typeelectric motors used for automobile Heating, Ventilation, and Air Conditioning (HVAC) blowersand outlines Production Validation and Continuing Conformance testing.2.0 REFERENC
9、E DOCUMENTS AND DEFINITIONSRequirement Hierarchy In the event there is a conflict between this standard, and any drawings/specifications, prioritize requirements as follows:1st - Applicable drawing(s)2nd - Application Specific Requirements3rd - USCAR standard4th - Other related standards or specific
10、ations2.1 Applicable Drawings/SpecificationsThe applicable drawings/specifications for the HVAC motor shall contain or reference the following:All dimensional requirementsPerformance requirements/conditionsSupplier part numberDirection of RotationPositive terminal identificationReference to applicab
11、le portions of this and other standardsThe typical mating connector and terminalsFederal Motor Vehicle Safety Standard (FMVSS) RequirementsWherever possible the applicable electrical connector should be used in conducting the test sequences contained in this document to simulate actual in-vehicle co
12、nditions.The circuitry shall be terminated using connectors that comply with SAE/USCAR-2, Standard for Automotive Electrical Connection Systems, and the SAE/USCAR-12, Wiring Component Design Guidelines.2.2 Application Specific RequirementsThe application specific requirements shall identify the para
13、meters that differ from the general specifications in this document. The application specific requirements may or may not be an integral part of the applicable drawings.SAE/USCAR-6 ISSUED FEBRUARY 1999STANDARD FOR D.C. BRUSH MOTOR - HVAC BLOWERS-3-2.3 Test Categories2.3.1 Design Verification TestsDe
14、sign Verification tests are frequently used to evaluate specific areas of the design. They are a tool for evaluating design alternatives, proposed improvements, cost reduction proposals, or determining root causes of field problems.2.3.2 Production Validation TestsProduction Validation tests are the
15、 acceptance tests for production part approval.2.3.3 In-Process Validation (Continuing Conformance)TestsIn-process Validation tests are tests to ensure continuing conformance of production samples to the specified requirements.3.0 OUTLINEThis engineering standard is a supplement to the released moto
16、r drawings/specifications and any applicable HVAC subsystem drawings/specifications. Details of test procedures are provided where necessary. Tests in each section shall be performed in the stated sequence. A glossary of terms and details for selected test fixtures and equipment are provided in this
17、 standard.4.0 GENERAL REQUIREMENTS4.1 Record RetentionRecord retention shall comply with PPAP and QS-9000.4.2 Sample DocumentationEngineering test samples shall be identified by part number, serial number, and motor build dateunless otherwise noted.4.2.1 Required Data PackageThe required data packag
18、e for the appropriate level of submission is to be included with the sample submission to the customer. The data package shall include the applicable test data for each performance parameter, and the serial number of each part in the submission.4.2.2 Design Verification SamplesDesign Verification sa
19、mples are prototype motors representing the production intent design.Sample sizes are given in Appendix A.SAE/USCAR-6 ISSUED FEBRUARY 1999STANDARD FOR D.C. BRUSH MOTOR - HVAC BLOWERS-4-4.2.3 Production Validation SamplesProduction Validation samples are defined as motors taken from a 300-unit minimu
20、m production run generated from production tools and processed before the first volume shipment. Sample sizes are given in Appendix B.4.2.4 In-Process Validation (Continuing Conformance) SamplesIn-Process Validation samples are motors randomly selected for inspection from lots that have been subject
21、ed to all normal high volume production processing, including final packaging.An inspection lot is defined as the total number of motors of a given basic design produced in one shift. An inspection lot may be divided into two or four sublots at the suppliers option.Each sublot shall be inspected in
22、accordance with the Continuing Conformance tests described in Appendix C.If variations of a basic motor design (termination, finish, etc.) are produced in a lot (or sublot), the sample size will remain the same but shall include as many of the variations as possible.In-Process Validation samples are
23、 also subject to certain reliability tests. See Appendix C.4.3 Safety/Environmental RequirementsWhen required, products and processes used by suppliers to manufacture products shall conform to employee and consumer health, employee safety, and environmental requirements contained in the customers dr
24、awings/specification.4.4 Materials and Process StandardsSuppliers are expected to subscribe to appropriate Materials and Process Standards that are called out by the customer. The supplier shall not change any material or process requirements subsequent to Design Verification approval without the wr
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SAEUSCAR61999STANDARDFORDCBRUSHMOTORHVACBLOWERSDC 整流 电动机 标准 HVAC 鼓风机 PDF

链接地址:http://www.mydoc123.com/p-1028411.html