1、Public Lessons Learned Entry: 6456 Lesson Info: Lesson Number: 6456 Lesson Date: 2011-6-29 Submitting Organization: KSC Submitted by: Matthew Craycraft Subject: Atmospheric Revitalization and Pressure Control System (ARPCS) Abstract: This lesson learned provides a summary of ground operations lesson
2、s learned for the Space Shuttle Atmospheric Revitalization and Pressure Control System compiled in June 2011. Lessons learned topics covered include: composite overwrap pressure vessel stress rupture failure mode, O2/N2 flow sensor problems, ground support equipment pressure distribution unit calibr
3、ation, negative pressure relief valve failure to reseat, fire bottle quantity verification, test requirements, latching valves and position indication, and cabin leak checks. Description of Driving Event: The recommendations that follow are relative to ARPCS processing problems. At the start of the
4、Shuttle Program, certification for composite overwrapped pressure vessels (COPVs) was based on an age life tanks assumed leak before burst, and reliability assumed to be greater than 0.9999 (less than 1 in 10,000 failures). The Johnson Space Center (JSC) initiated a test program to verify age on Kev
5、lar overwrap. In 2004-2005, mid-life re-certification was performed. The NASA Engineering and Safety Center (NESC) found errors in the calculation of the stress ratio based on the Lawrence Livermore National Laboratorys (LLNL) COPV test program. In 2005-2006, a study to assess true reliability of CO
6、PVs in the Orbiter fleet began. Space Shuttle Columbias tanks (found intact) were dissected, inspected, and tested to gain data points. White Sands Test Facility (WSTF) performed an accelerated life test on a 40-inch Orbital Maneuvering System (OMS) tank deemed to be the worst in the fleet. In 1989-
7、1990, flow sensor problems (biased, drifting, failed sensors) in O2/N2 flowmeters became more evident. In the early 2000s, approximately 50 percent of the sensors were unreliable. Lesson(s) Learned: See recommendations Recommendation(s): 1. If COPV concerns warrant it, consider a local clear of the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS64562012ATMOSPHERICREVITALIZATIONANDPRESSURECONTROLSYSTEMARPCSPDF

链接地址:http://www.mydoc123.com/p-1019538.html