1、 Public Lessons Learned Entry: 4236Lesson Info:a71 Lesson Number: 4236 a71 Lesson Date: 2010-10-22 a71 Submitting Organization: SSC a71 Submitted by: Robert Traill Subject: Facility Building B1201 Roof Repair Mishap Abstract: During weekend work conducted February 3 and 4, 2007, contract workers rem
2、oved the existing B1201 roof material, which uncovered an old drain (drain 1). This drain 1 had been abandoned in place, the drain pipe had been cut, and vertical section removed below the roof deck. During the same activity the roofers broke the PVC bowl of a nearby active drain (drain 2). The work
3、ers, believing that drain 1 was viable, proceeded to unblock the drain pipe and finished the drain location to the completed roof. As part of the same operation, the workers did not repair the drain 2 damage, instead they covered over this drain. Over one (1) inch of rain fell at the Stennis Space C
4、enter during the night of February 12th and the morning of the 13th. Rain entered B1201 through drain 1; the rain fell on and damaged several pieces of IT equipment. In a separate location another drain pipe connection to an internal drain also failed, allowing water to flood an adjacent hallway. Th
5、is incident was classified a Type B Mishap according to NPR 8621.1B - NASA Procedural Requirements for Mishap Reporting, Investigation, and Recordkeeping. The proximate causes leading to the mishap are listed below. 1. The abandoned drain (drain 1) opened at roof level. 2. The opened, abandoned drai
6、n (drain 1) pipe ended above IT equipment. Description of Driving Event: NASA/SSC Facility Operating Services Contractor (FOSC) contracted with the roofing contractor to repair through replacement Hurricane Katrina damage to B 1201 roof. The prime contractor then subcontracted the work to a sub-tier
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS42362010LESSONSLEARNEDFACILITYBUILDINGB1201ROOFREPAIRMISHAPPDF

链接地址:http://www.mydoc123.com/p-1019446.html