REG NASA-LLIS-1181--1999 Lessons Learned - Interim Solutions Can Hide Defective Conditions Resulting in Catastrophic Loss.pdf
《REG NASA-LLIS-1181--1999 Lessons Learned - Interim Solutions Can Hide Defective Conditions Resulting in Catastrophic Loss.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-1181--1999 Lessons Learned - Interim Solutions Can Hide Defective Conditions Resulting in Catastrophic Loss.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 1181Lesson Info:a71 Lesson Number: 1181a71 Lesson Date: 1999-05-04a71 Submitting Organization: JSCa71 Submitted by: Gordon M. Bowling/Ronald A. MontagueSubject: Interim Solutions Can Hide Defective Conditions Resulting in Catastrophic Loss Description of Driving Event: A 55-ga
2、llon drum of paint wastes subsequently ruptured after being overpacked into an 85-gallon salvage drum due to leakage from the original drum. Pressure had built up inside the drums to the point where both the inside drum and recovery drum burst, propelling the drums 26 feet in the air, at which point
3、 it dented the roof and spilled hazardous waste into the containment area. The incident occurred late at night and no personnel were injured or exposed.Primary Cause: The waste stream contains a mixture of solvent-base paints and cleanup solvents. None of the vapor pressures of the waste components
4、were great enough to cause failure of the drum. The pressure build-up was likely due to a chemical reaction producing a gaseous product. Polyurethane paint components of the waste stream contain isocyanate compounds which react with water to produce carbon dioxide. Although there were no accounts of
5、 water-based paints being added to the drum, the generator also uses latex paints, and some may have been accidentally added to the drum. The drum was routinely opened and closed during waste accumulation allowing release of the pressure. It was only when the drum was sealed for storage that pressur
6、e increased to deform and eventually rupture the drum.Contributing Factors: The bulging condition of the original 55-gallon drum was first noticed at a hazardous waste storage facility. The drum was overpacked into an 85-gallon recovery drum to correct the container condition deficiency, but the fac
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS11811999LESSONSLEARNEDINTERIMSOLUTIONSCANHIDEDEFECTIVECONDITIONSRESULTINGINCATASTROPHICLOSSPDF

链接地址:http://www.mydoc123.com/p-1018820.html